Delta Service Company
- Based in
- Fremont
- On San Francisco permits
- Dec 2006 to Apr 2008
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2008 | Completed final sign-off Sep 2008 | 650 Townsend St | renew for final only. 200612210384.Details
renew for final only. 200612210384. | |
| Jul 12, 2007 | Expired or cancelled expired May 2009 | 633 Battery St | roof top air conditioning unit replacement: remove and replace existing "trane"brand chiller on roof & replace with "carrier" brand. new equipment is approx. 2 inches higher, wider by 19" and shorter by 4 ft. weight is less;new matching mounting frame & altered stell support will be installed.Details
roof top air conditioning unit replacement: remove and replace existing "trane"brand chiller on roof & replace with "carrier" brand. new equipment is approx. 2 inches higher, wider by 19" and shorter by 4 ft. weight is less;new matching mounting frame & altered stell support will be installed. | $239,039 |
| Dec 21, 2006 | Expired or cancelled expired Feb 2008 | 650 Townsend St | install one liebert air hander wter cooled unit in 2nd floor. #252. install one 30 ton chillen on roof in parking arear. ron 2-2" water pipes in chase from new roof unit to (e) unit in room plus new liebert unit. electrition to run all electrical.Details
install one liebert air hander wter cooled unit in 2nd floor. #252. install one 30 ton chillen on roof in parking arear. ron 2-2" water pipes in chase from new roof unit to (e) unit in room plus new liebert unit. electrition to run all electrical. | $121,621 |