Block 0268, lot 006
220 Bush St
- City’s use
- Commercial Office
- Built
- 1930
- Stories
- 22
- Units
- 1
- Rooms
- 103 bathrooms
- Building
- 147,489 sq ft
- Lot
- 6,875 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
92 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2025 | Completed final sign-off Jul 2026 | 220 Bush St | Skyline Construction | suite 650: partial flr t.i. to include non-structural demolition, new non-structural partitions, doors, glazing, millwork and finishes throughout. mech and electrical work included.Details
suite 650: partial flr t.i. to include non-structural demolition, new non-structural partitions, doors, glazing, millwork and finishes throughout. mech and electrical work included. | $1,130,746 |
| Jun 8, 2021 | Completed final sign-off Aug 2021 | 220 Bush St | Potter Fire Protection | relocate (4) fire sprinklers from upright to pendent ref. permit #2021-0302-5694Details
relocate (4) fire sprinklers from upright to pendent ref. permit #2021-0302-5694 | $2,500 |
| May 21, 2021 | Completed final sign-off Sep 2021 | 220 Bush St | City Mechanical Inc | 1st fl breadk room & scr room mechanical improvement. ref pa# 202103025694.Details
1st fl breadk room & scr room mechanical improvement. ref pa# 202103025694. | $40,000 |
| Mar 2, 2021 | Completed final sign-off Oct 2021 | 220 Bush St | San Francisco Commercial Builders Inc | 1/f: demolition of non structural partitions, stairs, millwork, light fixtures and finishes. construct non structural partitions, stairs, millwork. new power door operator and actuation bars at entry doors to remain lockers, ceilings, light fixtures and finishes.Details
1/f: demolition of non structural partitions, stairs, millwork, light fixtures and finishes. construct non structural partitions, stairs, millwork. new power door operator and actuation bars at entry doors to remain lockers, ceilings, light fixtures and finishes. | $367,000 |
| Jun 24, 2014 | Completed final sign-off Feb 2015 | 220 Bush St | J M E Construction Services Inc | minor ti of e 1062 (b) restaurant on gr fl. includes demo of e non bearing walls and finishes. new casework, new partitons, relocation of sink and some new kitchen equipmentDetails
minor ti of e 1062 (b) restaurant on gr fl. includes demo of e non bearing walls and finishes. new casework, new partitons, relocation of sink and some new kitchen equipment | $52,000 |
| Jun 20, 2014 | Completed final sign-off Oct 2014 | 220 Bush St | San Francisco Commercial Builders Inc | 3rd floor suite 370 - revision to appl #2013.1209.3650 - addition of (breakout office) non-structural partitions, doors & glazing. relocation of some lights & addition of some outlets. no increase in area. elec & fire sprinklering under separate permit.Details
3rd floor suite 370 - revision to appl #2013.1209.3650 - addition of (breakout office) non-structural partitions, doors & glazing. relocation of some lights & addition of some outlets. no increase in area. elec & fire sprinklering under separate permit. | $90,000 |
| Feb 27, 2014 | Never finaled issued Feb 2014, no final | 220 Bush St | San Francisco Commercial Builders Inc | revision to app#201312093650: suite 370 - provide additional detail drawing for fire proofing of steel beams and columns per sheets 35-4.0 & 35-4.1.Details
revision to app#201312093650: suite 370 - provide additional detail drawing for fire proofing of steel beams and columns per sheets 35-4.0 & 35-4.1. | |
| Dec 9, 2013 | Completed final sign-off Nov 2014 | 220 Bush St | San Francisco Commercial Builders Inc | suite 370 - non structural partitons, doors, glazing, millwork, suspended &gyp bd ceilings. add lights. no increase in area. elec, plumbing, l&s & sprinkler separate permit. demo under 201302140234Details
suite 370 - non structural partitons, doors, glazing, millwork, suspended &gyp bd ceilings. add lights. no increase in area. elec, plumbing, l&s & sprinkler separate permit. demo under 201302140234 | $405,000 |
| Oct 23, 2013 | Completed final sign-off Mar 2014 | 220 Bush St | Tri-Signal Integration Inc. | add 1 strobe to existing fire alarm systemDetails
add 1 strobe to existing fire alarm system | $1,000 |
| Sep 30, 2013 | Completed final sign-off Feb 2014 | 220 Bush St | San Francisco Commercial Builders Inc | 16th fl: barrier removal for voluntary restroom upgrade for the 16th floor women's restroom. no increase in area or change in occupancy. removal of existing restroom fixtures, accessories and finishes. install new restroom fixtures, accessories, finishes and signage.Details
16th fl: barrier removal for voluntary restroom upgrade for the 16th floor women's restroom. no increase in area or change in occupancy. removal of existing restroom fixtures, accessories and finishes. install new restroom fixtures, accessories, finishes and signage. | $69,000 |
| Sep 20, 2010 | Never finaled issued Sep 2010, no final | 220 Bush St | Tri-Signal Integration Inc. | 1st floor-add 1 speaker strobe and 1 strobe to existing fire alarm systemDetails
1st floor-add 1 speaker strobe and 1 strobe to existing fire alarm system | $1,800 |
| Jun 2, 2010 | Completed final sign-off Jan 2011 | 220 Bush St | J. M. Maita Construction Inc. | tenant improvement for restaurant kitchen remodel-no grease hood or steam hood, new floor sink, floor drain & water heater. replace (e) hvac unit & duct work, new lighting fixture layout. new tenantDetails
tenant improvement for restaurant kitchen remodel-no grease hood or steam hood, new floor sink, floor drain & water heater. replace (e) hvac unit & duct work, new lighting fixture layout. new tenant | $100,000 |
| Apr 22, 2010 | Completed final sign-off Jun 2010 | 220 Bush St | add fixed cabinets, upgrade e door by adjusting closer and relocating push and pulls on door to meet accessibility. no exterior work.Details
add fixed cabinets, upgrade e door by adjusting closer and relocating push and pulls on door to meet accessibility. no exterior work. | $3,000 | |
| Dec 30, 2008 | Completed final sign-off Apr 2009 | 220 Bush St | barrier removal: voluntary restroom upgrade for 17th fl., removal of e) restroom fixtures, accessories, finishes. install (n) restroom fixtures,accessories,finishes. mep design build under separate permit.Details
barrier removal: voluntary restroom upgrade for 17th fl., removal of e) restroom fixtures, accessories, finishes. install (n) restroom fixtures,accessories,finishes. mep design build under separate permit. | $25,000 | |
| Oct 1, 2007 | Never finaled issued Oct 2007, no final | 220 Bush St | street space permitDetails
street space permit | ||
| Jul 11, 2007 | Expired or cancelled cancelled Jan 2026 | 220 Bush St | upgrade kichen exhust hood type ii. install new exhaust motor and backdraft damper. intall contro switch and conduit. exhaust termination within 3 ft. of property line and more than 10ft. of any inletDetails
upgrade kichen exhust hood type ii. install new exhaust motor and backdraft damper. intall contro switch and conduit. exhaust termination within 3 ft. of property line and more than 10ft. of any inlet | $325,000 | |
| Feb 12, 2007 | Completed final sign-off Jun 2007 | 220 Bush St | Skyline Construction | woodruff sawyer- oti-2 8th floor elDetails
woodruff sawyer- oti-2 8th floor el | $21,000 |
| Jan 5, 2007 | Completed final sign-off Jun 2007 | 220 Bush St | oti-1 8th floor el, l/s, spDetails
oti-1 8th floor el, l/s, sp | $80,000 | |
| Oct 4, 2006 | Expired or cancelled expired Apr 2011 | 220 Bush St | Skyline Construction | oti-2, 3rd floor, elDetails
oti-2, 3rd floor, el | $25,500 |
| Jun 7, 2006 | Expired or cancelled expired Apr 2011 | 220 Bush St | oti-1, 3rd floor, el, ls, sp.Details
oti-1, 3rd floor, el, ls, sp. | $90,000 | |
| Apr 18, 2006 | Completed final sign-off Jun 2006 | 220 Bush St | Skyline Construction | oti-2 8th fl, el-sp.Details
oti-2 8th fl, el-sp. | $42,400 |
| Apr 14, 2006 | Never finaled issued Apr 2006, no final | 220 Bush St | oti-1 6th floor eel me ls spDetails
oti-1 6th floor eel me ls sp | $30,000 | |
| Mar 17, 2006 | Completed final sign-off Jun 2006 | 220 Bush St | Skyline Construction | oti-1 8th floor el me ls spDetails
oti-1 8th floor el me ls sp | $75,000 |
| Sep 20, 2005 | Expired or cancelled expired Apr 2011 | 220 Bush St | oti-1:5th fl, el, me, ls, spDetails
oti-1:5th fl, el, me, ls, sp | $45,000 | |
| Aug 12, 2004 | Expired or cancelled expired Jul 2006 | 220 Bush St | Dome Construction Corp | oti-1, 6t floor ls,sp onlyDetails
oti-1, 6t floor ls,sp only | $12,800 |
| Jun 3, 2004 | Completed final sign-off Jul 2004 | 220 Bush St | Dome Construction Corp | oti-3 7th flr elDetails
oti-3 7th flr el | $11,000 |
| May 5, 2004 | Completed final sign-off Jul 2005 | 220 Bush St | Field Construction Inc. | demolition of partitions and electrical/construction of new partitions, electrical/relocation ofDetails
demolition of partitions and electrical/construction of new partitions, electrical/relocation of | $98,000 |
| May 3, 2004 | Completed final sign-off Jun 2004 | 220 Bush St | Field Construction Inc. | demolition of partition and electricalDetails
demolition of partition and electrical | $2,000 |
| Apr 22, 2004 | Completed final sign-off Jul 2004 | 220 Bush St | Dome Construction Corp | oti-5 - 8th floor , el ( additional work to 200403158564).Details
oti-5 - 8th floor , el ( additional work to 200403158564). | $3,700 |
| Mar 31, 2004 | Completed final sign-off Jul 2004 | 220 Bush St | Dome Construction Corp | oti-4, floor 8 - spDetails
oti-4, floor 8 - sp | $9,600 |
| Mar 15, 2004 | Completed final sign-off Jul 2004 | 220 Bush St | Dome Construction Corp | oti-3 8th fl elDetails
oti-3 8th fl el | $140,000 |
| Mar 15, 2004 | Completed final sign-off Jul 2004 | 220 Bush St | Dome Construction Corp | oti-2 8th fl lsDetails
oti-2 8th fl ls | $15,000 |
| Feb 17, 2004 | Completed final sign-off Jul 2004 | 220 Bush St | Dome Construction Corp | oti-1 8th fl-el, me, ls, spDetails
oti-1 8th fl-el, me, ls, sp | $360,000 |
| Jan 28, 2004 | Completed final sign-off Jul 2004 | 220 Bush St | interior soft demolition: partitions, electrical, plumbing, finishes on the 8th floorDetails
interior soft demolition: partitions, electrical, plumbing, finishes on the 8th floor | $25,000 | |
| Jul 10, 2003 | Completed final sign-off Sep 2003 | 220 Bush St | Mcleod Construction Inc | oti-2 18th floor, el, lsDetails
oti-2 18th floor, el, ls | $2,500 |
| Jun 2, 2003 | Expired or cancelled expired May 2004 | 220 Bush St | oti-1 18th floor, el, me, lsDetails
oti-1 18th floor, el, me, ls | $20,000 | |
| Nov 5, 2002 | Completed final sign-off Dec 2002 | 220 Bush St | Skyline Construction | renew for final for appln #200106121318 200205237299Details
renew for final for appln #200106121318 200205237299 | |
| Oct 25, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | removal of (e)roll down grille,elevator pit access door/install 2-hr rated elevatorDetails
removal of (e)roll down grille,elevator pit access door/install 2-hr rated elevator | $4,000 | |
| Sep 27, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-3,11th flr,lsDetails
oti-3,11th flr,ls | $4,000 | |
| Sep 27, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-3, 12th flr,lsDetails
oti-3, 12th flr,ls | $4,000 | |
| Sep 25, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-3 16th floor, lsDetails
oti-3 16th floor, ls | $4,000 | |
| Sep 25, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-3 3rd floor, lsDetails
oti-3 3rd floor, ls | $12,000 | |
| Sep 25, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-3 18th floor, lsDetails
oti-3 18th floor, ls | $4,000 | |
| Sep 25, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-3 14th floor lsDetails
oti-3 14th floor ls | $4,000 | |
| Sep 25, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-3 19th floor, lsDetails
oti-3 19th floor, ls | $4,000 | |
| Sep 13, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-2 14th floor el/spDetails
oti-2 14th floor el/sp | $4,000 | |
| Sep 13, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-2 19th floor el,spDetails
oti-2 19th floor el,sp | $4,000 | |
| Sep 13, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-2 3rd floor el,spDetails
oti-2 3rd floor el,sp | $10,000 | |
| Sep 13, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-2 11th floor el,spDetails
oti-2 11th floor el,sp | $4,000 | |
| Sep 13, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-2 18th floor sp lDetails
oti-2 18th floor sp l | $4,000 | |
| Sep 13, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-2 16th floor el,spDetails
oti-2 16th floor el,sp | $4,000 | |
| Sep 13, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-2, 12th flr,el,sp (no increase in office space)Details
oti-2, 12th flr,el,sp (no increase in office space) | $4,000 | |
| Jul 3, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-1, 11th floor, el, ls, spDetails
oti-1, 11th floor, el, ls, sp | $30,000 | |
| Jul 3, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-1, 18th floor, el, ls, sp.Details
oti-1, 18th floor, el, ls, sp. | $30,000 | |
| Jul 3, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-1, 12th floor, el, ls, spDetails
oti-1, 12th floor, el, ls, sp | $30,000 | |
| Jul 3, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-1, 14th floor, el, ls, sp.Details
oti-1, 14th floor, el, ls, sp. | $30,000 | |
| Jul 3, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-1, 16th floor, el, ls, sp.Details
oti-1, 16th floor, el, ls, sp. | $30,000 | |
| Jul 3, 2002 | Completed final sign-off Jul 2003 | 220 Bush St | oti-1, 19th floor, el, ls, sp.Details
oti-1, 19th floor, el, ls, sp. | $30,000 | |
| Jun 27, 2002 | Expired or cancelled expired Aug 2006 | 220 Bush St | new interior fire rated enclosures to encase and support new electrical panels and conduit runs thatDetails
new interior fire rated enclosures to encase and support new electrical panels and conduit runs that | $300,000 | |
| Jun 12, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | oti-1,3rd flr,ltg,ls,sprDetails
oti-1,3rd flr,ltg,ls,spr | $85,000 | |
| Jun 12, 2002 | Completed final sign-off Jan 2003 | 220 Bush St | Skyline Construction | oti-2 4th fl elDetails
oti-2 4th fl el | $8,000 |
| May 29, 2002 | Expired or cancelled expired Mar 2004 | 220 Bush St | oti-1, 8th floor, ls.Details
oti-1, 8th floor, ls. | $18,000 | |
| May 23, 2002 | Expired or cancelled expired Sep 2002 | 220 Bush St | Skyline Construction | rev#200106121318 10th flr corridor upgrade ori.aoxpw od qoek is reduced (e) corrior door, frame, harDetails
rev#200106121318 10th flr corridor upgrade ori.aoxpw od qoek is reduced (e) corrior door, frame, har | |
| May 14, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | barrier removal - 11th floor- alterating men's & women's restroom to be fully accessibleDetails
barrier removal - 11th floor- alterating men's & women's restroom to be fully accessible | $30,000 | |
| May 14, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | barrier removal work-16th floor, men's restroom, upgrade by provding fully accessible men's restroomDetails
barrier removal work-16th floor, men's restroom, upgrade by provding fully accessible men's restroom | $15,000 | |
| May 14, 2002 | Completed final sign-off Aug 2003 | 220 Bush St | barrier removal work-14th floor, alterating men's & women's restroom to be fully accessibleDetails
barrier removal work-14th floor, alterating men's & women's restroom to be fully accessible | $30,000 | |
| May 14, 2002 | Completed final sign-off Jan 2003 | 220 Bush St | Skyline Construction | oti 1:(7th fl. ltg, l/s, sprDetails
oti 1:(7th fl. ltg, l/s, spr | $75,000 |
| Feb 22, 2002 | Completed final sign-off Apr 2002 | 220 Bush St | Skyline Construction | life safety work to be performed no increase in office spaceDetails
life safety work to be performed no increase in office space | $7,000 |
| Nov 28, 2001 | Completed final sign-off Apr 2002 | 220 Bush St | oti-1= el, me, ls & sp (3rd fl only)Details
oti-1= el, me, ls & sp (3rd fl only) | $294,500 | |
| Nov 26, 2001 | Never finaled issued Nov 2001, no final | 220 Bush St | women's & men's restroom remodel, minor changes to suite adjacent to new women's restroom, at 11th fDetails
women's & men's restroom remodel, minor changes to suite adjacent to new women's restroom, at 11th f | $86,000 | |
| Nov 20, 2001 | Completed final sign-off Jan 2003 | 220 Bush St | provide 8/f corridor and elevator lobby upgrade per plansDetails
provide 8/f corridor and elevator lobby upgrade per plans | $85,000 | |
| Sep 18, 2001 | Expired or cancelled cancelled Aug 2002 | 220 Bush St | oti-1 g/f el me lsDetails
oti-1 g/f el me ls | $8,700 | |
| Aug 20, 2001 | Expired or cancelled expired Jan 2003 | 220 Bush St | Skyline Construction | oti-1 (rev.) 7th floor, el, me, l/s & spDetails
oti-1 (rev.) 7th floor, el, me, l/s & sp | $10,000 |
| Aug 13, 2001 | Expired or cancelled expired Jan 2003 | 220 Bush St | Skyline Construction | oti-2 7th flr. el onlyDetails
oti-2 7th flr. el only | $40,000 |
| Aug 8, 2001 | Completed final sign-off Jun 2002 | 220 Bush St | Skyline Construction | no new office space.demo inaccessible restrooms men's on2nd fl&women's on3rd&4th fl.add wall&light.Details
no new office space.demo inaccessible restrooms men's on2nd fl&women's on3rd&4th fl.add wall&light. | $26,000 |
| Jul 25, 2001 | Expired or cancelled cancelled Mar 2002 | 220 Bush St | oti-1,16th flr-el, me, ls,spDetails
oti-1,16th flr-el, me, ls,sp | $79,000 | |
| Jun 18, 2001 | Expired or cancelled expired Jan 2003 | 220 Bush St | Skyline Construction | 0ti-7th fl el,me,ls,spDetails
0ti-7th fl el,me,ls,sp | $250,000 |
| Jun 12, 2001 | Expired or cancelled expired Jun 2004 | 220 Bush St | oti-1 10th floor ltg ls sprDetails
oti-1 10th floor ltg ls spr | $91,000 | |
| May 17, 2001 | Completed final sign-off Jun 2002 | 220 Bush St | oti-1:grd glr el, me, l/s & spDetails
oti-1:grd glr el, me, l/s & sp | $200,000 | |
| May 17, 2001 | Completed final sign-off Jun 2002 | 220 Bush St | Skyline Construction | oti-2: grd flr el & meDetails
oti-2: grd flr el & me | $100,000 |
| Apr 17, 2001 | Expired or cancelled expired Sep 2002 | 220 Bush St | Sabah International Incorporated | design, provide & install fm200 suppression system @ 6th floor onlyDetails
design, provide & install fm200 suppression system @ 6th floor only | $48,098 |
| Apr 3, 2001 | Expired or cancelled expired Aug 2001 | 220 Bush St | oti-1 (rev)6th flr,no oti-2 nor 3Details
oti-1 (rev)6th flr,no oti-2 nor 3 | $2,000 | |
| Mar 5, 2001 | Expired or cancelled cancelled Aug 2001 | 220 Bush St | oti-1 14th fl ltg,mech,ls,sprDetails
oti-1 14th fl ltg,mech,ls,spr | $73,000 | |
| Feb 21, 2001 | Expired or cancelled expired Mar 2002 | 220 Bush St | barrier removal restroom upgrade on 10/f men and womenDetails
barrier removal restroom upgrade on 10/f men and women | $45,000 | |
| Dec 14, 2000 | Completed final sign-off Feb 2002 | 220 Bush St | door relocationi at stair 4 lobby lvl barrier rmvl clarification of e condtn record e cond at stairDetails
door relocationi at stair 4 lobby lvl barrier rmvl clarification of e condtn record e cond at stair | ||
| Nov 15, 2000 | Completed final sign-off Feb 2002 | 220 Bush St | door relocation @ stair #4 barrier removal @ g/fDetails
door relocation @ stair #4 barrier removal @ g/f | $8,000 | |
| Nov 8, 2000 | Completed final sign-off Feb 2002 | 220 Bush St | Skyline Construction | oti-1,8th floor -el,lsDetails
oti-1,8th floor -el,ls | $130,000 |
| Oct 26, 2000 | Completed final sign-off Feb 2001 | 220 Bush St | Schikore Construction | new service counter (drywall) , minor partition demolition, new ceiling. 1 st floor.Details
new service counter (drywall) , minor partition demolition, new ceiling. 1 st floor. | $10,000 |
| Oct 11, 2000 | Expired or cancelled expired Feb 2001 | 220 Bush St | Ayoob & Peery Plumbing Co Inc | install partial sprnkler system at new tenant to cnnect to ex & cap for future exten at 6th fl locatDetails
install partial sprnkler system at new tenant to cnnect to ex & cap for future exten at 6th fl locat | $4,500 |
| Aug 11, 2000 | Expired or cancelled expired Aug 2001 | 220 Bush St | oti-1 6th floor, el, mech, l-s,sprDetails
oti-1 6th floor, el, mech, l-s,spr | $220,000 | |
| Apr 20, 2000 | Expired or cancelled expired Jun 2001 | 220 Bush St | Amiot & Boehm Inc | oti-3 ls, 6th floorDetails
oti-3 ls, 6th floor | $70,000 |
| Jan 6, 2000 | Expired or cancelled expired Feb 2001 | 220 Bush St | oti-1 el ls 6th floorDetails
oti-1 el ls 6th floor | $70,000 |