Prasad More
- Listed as
- authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Prasad
- On San Francisco permits
- Jul 2008 to Dec 2013
28 permits since 2000 (pmt consultant/expediter on 22 permits, authorized agent-others on 5 permits, engineer on 1 permit): 17 completed, 8 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2013 | Never finaled issued May 2014, no final | 460 Bryant St | t-i in basement, ground floor & mezzanine. non structural partitions, ceiling lights, millwork. sprinkler on seperate permit. -maher- compliance with ordinanace no.155-13.not required.Details
t-i in basement, ground floor & mezzanine. non structural partitions, ceiling lights, millwork. sprinkler on seperate permit. -maher- compliance with ordinanace no.155-13.not required. | $3,273,488 | |
| Sep 9, 2013 | Never finaled issued Sep 2013, no final | 850 Battery St | Oliver & Company Inc. | revision to pa# 2013-0712-1763 -replace (e) helical piers (17inch diameter & 23-8 inch diameter piers) by 6-inch, 8 inch & 12 inch diameter micropilesDetails
revision to pa# 2013-0712-1763 -replace (e) helical piers (17inch diameter & 23-8 inch diameter piers) by 6-inch, 8 inch & 12 inch diameter micropiles | |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 1445 Bush St | Mc Callion Construction Inc | barrier removal & install new elevatorDetails
barrier removal & install new elevator | $102,750 |
| May 31, 2013 | Completed final sign-off Sep 2013 | 275 Brannan St | Truebeck Construction | installation of container partitions in existing office area. reference pa# 201302130103. ship ladders are not permitted.Details
installation of container partitions in existing office area. reference pa# 201302130103. ship ladders are not permitted. | $24,000 |
| May 17, 2013 | Expired or cancelled withdrawn Jun 2013 | 457 Minna St | 1st floor-t.i to open office space-new partition, no m.e.p. no ceiling workDetails
1st floor-t.i to open office space-new partition, no m.e.p. no ceiling work | $55,000 | |
| Mar 27, 2013 | Completed final sign-off Sep 2013 | 850 Battery St | Oliver & Company Inc. | 1st & 2nd floor-interior non structural demolition, all work to comply with ab-017. no work on exterior of buildingDetails
1st & 2nd floor-interior non structural demolition, all work to comply with ab-017. no work on exterior of building | $12,500 |
| Feb 12, 2013 | Completed final sign-off Dec 2013 | 950 Mason St | Angotti & Reilly Inc. | barrier removal only-specific public space throughout building & designated guestrooms, p,a,l,m,t levels.Details
barrier removal only-specific public space throughout building & designated guestrooms, p,a,l,m,t levels. | $123,000 |
| Feb 12, 2013 | Completed final sign-off Jul 2013 | 75 Hawthorne St | Turner Construction Co | 5th floor-partial 5th floor tenant improvement-restroom upgrades, new partitions & finishes. minor structural work limited to server room & restrooms. new bollards in cellar level. m.e.p, sprinkler, fire alarm on seperate permitsDetails
5th floor-partial 5th floor tenant improvement-restroom upgrades, new partitions & finishes. minor structural work limited to server room & restrooms. new bollards in cellar level. m.e.p, sprinkler, fire alarm on seperate permits | $235,000 |
| Feb 4, 2013 | Never finaled issued Feb 2013, no final | 75 Hawthorne St | Turner Construction Co | assessibility improvements related to path of travel-including parking re-stripping, parking signage, elevator signage, exterior ramp. ramp & stair handrails & stair nosing. relocate fdc as needed for ramp modificationsDetails
assessibility improvements related to path of travel-including parking re-stripping, parking signage, elevator signage, exterior ramp. ramp & stair handrails & stair nosing. relocate fdc as needed for ramp modifications | $108,000 |
| Feb 4, 2013 | Completed final sign-off Aug 2014 | 370 03rd St | Truebeck Construction | refer to pa# 2012-0917-9869/r1-roof deck. m.e.p & landscape for new roof deckDetails
refer to pa# 2012-0917-9869/r1-roof deck. m.e.p & landscape for new roof deck | |
| Dec 24, 2012 | Completed final sign-off Mar 2015 | 50 Fremont St | Hathaway Dinwiddie Co. | 40th floor full floor tenant improvement - new non-load bearing partitions, ceiling & finishes, new mech, elect & plumbing work. sprinkler & fire alarm on separate permit.Details
40th floor full floor tenant improvement - new non-load bearing partitions, ceiling & finishes, new mech, elect & plumbing work. sprinkler & fire alarm on separate permit. | $1,389,225 |
| Oct 9, 2012 | Completed final sign-off Jul 2013 | 845 Market St | 5/fl & 6/fl, space #467 - renovation of auditorium #1 to include exit modifications, finishes, seats installation of large format screen & sound system.Details
5/fl & 6/fl, space #467 - renovation of auditorium #1 to include exit modifications, finishes, seats installation of large format screen & sound system. | $150,000 | |
| Oct 3, 2012 | Completed final sign-off Jun 2013 | 50 Fremont St | Hathaway Dinwiddie Co. | 36th floor-full floor tenant improvement for single tenant. sprinkler & fire alarm on separate permitDetails
36th floor-full floor tenant improvement for single tenant. sprinkler & fire alarm on separate permit | $1,269,200 |
| Oct 3, 2012 | Completed final sign-off Jun 2013 | 50 Fremont St | Hathaway Dinwiddie Co. | 37th floor-full floor tenant improvement for single tenantDetails
37th floor-full floor tenant improvement for single tenant | $1,269,200 |
| Sep 25, 2012 | Never finaled issued Oct 2012, no final | 250 Post St | Dickinson Cameron Construction Company I | basement level-construction of new workshop in (e) space. new finishes & fixtures. new hvac, electrical & plumbing. *steamer hood - sprinkler on seperate permitDetails
basement level-construction of new workshop in (e) space. new finishes & fixtures. new hvac, electrical & plumbing. *steamer hood - sprinkler on seperate permit | $120,000 |
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 475 Brannan St | obtain final inspection for work approved under pa# 2008-0403-8718. all work is completeDetails
obtain final inspection for work approved under pa# 2008-0403-8718. all work is complete | ||
| Jul 16, 2012 | Completed final sign-off Oct 2012 | 2201 Fillmore St | Kdc Construction | interior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation.Details
interior non structural demolition of ground floor & basement. all work to comply with sfbc ab-017. building will remain vacant until full accessibility compliance will be provided under future tenant improvement permit, failure to comply will result in issuance of notice of violation. | $14,500 |
| Jul 16, 2012 | Completed final sign-off Jun 2014 | 888 Brannan St | Richlen Construction | revision to pa# 2011-1214-0669-remove (e) trestle below 1st level & replace with concrete slab. raise basement created by trestle removalDetails
revision to pa# 2011-1214-0669-remove (e) trestle below 1st level & replace with concrete slab. raise basement created by trestle removal | $5,000 |
| Jul 11, 2012 | Completed final sign-off Oct 2012 | 299 Bay Shore Bl | new exterior awning on (e) buildingDetails
new exterior awning on (e) building | $11,000 | |
| Jul 6, 2012 | Never finaled issued Jul 2012, no final | 865 Market St | 3rd floor-revision to pa# 2012-0326-6889/2012-0323-6778-to include new communicationing stairs & interior elevator cab build outDetails
3rd floor-revision to pa# 2012-0326-6889/2012-0323-6778-to include new communicationing stairs & interior elevator cab build out | $70,000 | |
| Feb 14, 2012 | Completed final sign-off Jun 2013 | 22 Minna St | exterior & interior remodel-refinishing the garage exterior with eifs over the (e) building skin. new exterior lighting, remodel & enlargement of retail storefront openings & addition of a glassrailDetails
exterior & interior remodel-refinishing the garage exterior with eifs over the (e) building skin. new exterior lighting, remodel & enlargement of retail storefront openings & addition of a glassrail | $216,000 | |
| May 3, 2011 | Completed final sign-off Apr 2013 | 410 Bush St | Hathaway Dinwiddie Co., R L H Fire Protection Inc | install new fire sprinkler system in (e) building. no change of use. fire only. (445 sprinklers) and 6-inch underground, and class i standpipe.Details
install new fire sprinkler system in (e) building. no change of use. fire only. (445 sprinklers) and 6-inch underground, and class i standpipe. | $42,000 |
| Aug 20, 2010 | Never finaled issued Aug 2010, no final | 835 Market St | core and shell work of retail space 499 and 495 to combine 2 retail spaces for 1 future tenantDetails
core and shell work of retail space 499 and 495 to combine 2 retail spaces for 1 future tenant | $35,000 | |
| Aug 10, 2010 | Completed final sign-off Apr 2011 | 170 Ofarrell St | Swinerton Builders | revision to 200911100965. due to field changesDetails
revision to 200911100965. due to field changes | $15,000 |
| Jun 7, 2010 | Completed final sign-off Feb 2011 | 3575 Geary Bl | Cahill Contractors Inc | revision to pa #2007-0222-4724 to provide stand-pipe closets on 1st & 2nd floors (4 closets total).Details
revision to pa #2007-0222-4724 to provide stand-pipe closets on 1st & 2nd floors (4 closets total). | $6,000 |
| Aug 12, 2008 | Completed final sign-off Feb 2009 | 475 Brannan St | convert existing open office to b-occupancy lab. convert existing storage to clinical lab (b- occupancy) to match adjacent lab. on 1st floor. no exterior work. sprinkler & fire alarm under separate permit.Details
convert existing open office to b-occupancy lab. convert existing storage to clinical lab (b- occupancy) to match adjacent lab. on 1st floor. no exterior work. sprinkler & fire alarm under separate permit. | $100,000 | |
| Jul 28, 2008 | Expired or cancelled expired Sep 2010 | 195 Kiska Rd | landscape of exterior playground area at rear of propertyDetails
landscape of exterior playground area at rear of property | $25,000 | |
| Jul 17, 2008 | Expired or cancelled expired Apr 2009 | 1500 Owens St | construct rated shaft (tunnel) 1st floor above women's shower to enclosed ductwork. remove fsd and cap existing ductwork. revision to application 200611298694 s-6.Details
construct rated shaft (tunnel) 1st floor above women's shower to enclosed ductwork. remove fsd and cap existing ductwork. revision to application 200611298694 s-6. | $20,000 |