Block 1084, lot 004
3575 Geary Bl
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 26, 2012 | Completed final sign-off Jun 2013 | 3575 Geary Bl | Cahill Contractors Inc | minor alterations to existing ground floors clinic space. relocation of existing dental exam room. mep, life safety sep. permitsDetails
minor alterations to existing ground floors clinic space. relocation of existing dental exam room. mep, life safety sep. permits | $50,000 |
| Oct 16, 2012 | Never finaled issued May 2013, no final | 3575 Geary Bl | Cahill Contractors Inc | minor alteration to existing ground floor tenant improvement. work is restricted to ground floor office, clinic and adult day care areas. no work is proposed in residential areas, and no work is proposed in the basement or floors above the ground floor. see plan's cover sheet area b thru e.Details
minor alteration to existing ground floor tenant improvement. work is restricted to ground floor office, clinic and adult day care areas. no work is proposed in residential areas, and no work is proposed in the basement or floors above the ground floor. see plan's cover sheet area b thru e. | $500,000 |
| Jan 24, 2011 | Completed final sign-off Dec 2011 | 3575 Geary Bl | Cahill Contractors Inc | revision topa# 2007.02.22.4724 to add electronic door hardware to provide security and egress for building occupantsDetails
revision topa# 2007.02.22.4724 to add electronic door hardware to provide security and egress for building occupants | $5,000 |
| Oct 1, 2010 | Completed final sign-off Feb 2011 | 3575 Geary Bl | Simplex Grinnell | server room - install new monitoring panel fo ra wet pre-avtion system. 1 panel, 1 fire alarm smoke, 2 pre-action smokes, 1 pre-action horn, 1 monitor module, 1 mantenance discounnect switch.Details
server room - install new monitoring panel fo ra wet pre-avtion system. 1 panel, 1 fire alarm smoke, 2 pre-action smokes, 1 pre-action horn, 1 monitor module, 1 mantenance discounnect switch. | $6,000 |
| Aug 24, 2010 | Completed final sign-off Feb 2011 | 3575 Geary Bl | Simplex Grinnell | revision to pa# 2009.03.10.3810. relocate node # 2 on first fl. provide a sign for the loc of the facpDetails
revision to pa# 2009.03.10.3810. relocate node # 2 on first fl. provide a sign for the loc of the facp | |
| Aug 2, 2010 | Completed final sign-off Feb 2011 | 3575 Geary Bl | Priority Architectural Graphics Dba Prio | x35 evacuation maps signs to be reviewed by sffd only. for new construction issued but not completedDetails
x35 evacuation maps signs to be reviewed by sffd only. for new construction issued but not completed | $3,000 |
| Jun 7, 2010 | Completed final sign-off Feb 2011 | 3575 Geary Bl | Cahill Contractors Inc | revision to pa #2007-0222-4724 to provide stand-pipe closets on 1st & 2nd floors (4 closets total).Details
revision to pa #2007-0222-4724 to provide stand-pipe closets on 1st & 2nd floors (4 closets total). | $6,000 |
| Jun 4, 2010 | Completed final sign-off Dec 2011 | 3575 Geary Bl | Cahill Contractors Inc | revision to pa# 2007-02.22.4724. reconfigure lay out of institute of aging tenant space on floors 1 and 2.Details
revision to pa# 2007-02.22.4724. reconfigure lay out of institute of aging tenant space on floors 1 and 2. | $135,000 |
| Apr 5, 2010 | Completed final sign-off Dec 2011 | 3575 Geary Bl | Cahill Contractors Inc | revision to approved p.a.#200702224724 to relocate door r3.3 at 3rd. flr. terrace to comply with required clearances.Details
revision to approved p.a.#200702224724 to relocate door r3.3 at 3rd. flr. terrace to comply with required clearances. | $14,500 |
| Feb 8, 2010 | Completed final sign-off Feb 2011 | 3575 Geary Bl | Cahill Contractors Inc | revision to approved pa# 2007-0222-4724-delete non required venting for 3 stop elevator serving instititute on aging tenant spaceDetails
revision to approved pa# 2007-0222-4724-delete non required venting for 3 stop elevator serving instititute on aging tenant space | |
| Jun 11, 2009 | Completed final sign-off Dec 2011 | 3575 Geary Bl | Cahill Contractors Inc | revisions to pa# 2007.02.22.4724 s2 ( under constr). revised locations of elec. closets and other minor interior field changesDetails
revisions to pa# 2007.02.22.4724 s2 ( under constr). revised locations of elec. closets and other minor interior field changes | $65,000 |
| Mar 10, 2009 | Completed final sign-off Dec 2011 | 3575 Geary Bl | Simplex Grinnell | new fire alarm system includes addition of new facp. 5 nac panels. 2 pull stations, 254 smoke det, 5 heat detectors, 42 duct detectors, 59 strobes, 139 horn strobes, 140 horns, 7 wup horns and 1 graphic annunliatorDetails
new fire alarm system includes addition of new facp. 5 nac panels. 2 pull stations, 254 smoke det, 5 heat detectors, 42 duct detectors, 59 strobes, 139 horn strobes, 140 horns, 7 wup horns and 1 graphic annunliator | $56,000 |
| Oct 23, 2008 | Completed final sign-off Dec 2011 | 3575 Geary Bl | Cahill Contractors Inc | permit for tower crane foundation. ref. appl#2007/0222/4724Details
permit for tower crane foundation. ref. appl#2007/0222/4724 | $5,000 |
| Jul 30, 2008 | Completed final sign-off Aug 2008 | 3575 Geary Bl | Cahill Contractors Inc | renew pa# 2007/02/26/4925 for final inspection only.Details
renew pa# 2007/02/26/4925 for final inspection only. | |
| Sep 5, 2007 | Completed final sign-off Feb 2011 | 3575 Geary Bl | shoring and underpinning on vacant lot for new construction. (reference pa # 2007-0222-4724s)Details
shoring and underpinning on vacant lot for new construction. (reference pa # 2007-0222-4724s) | $120,000 | |
| Jun 22, 2007 | Never finaled issued Jun 2007, no final | 3575 Geary Bl | street space permitDetails
street space permit | ||
| Feb 26, 2007 | Completed final sign-off Dec 2011 | 3575 Geary Bl | to demolish a 2 story movie theater.Details
to demolish a 2 story movie theater. | ||
| Feb 22, 2007 | Completed final sign-off Dec 2011 | 3575 Geary Bl | to erect 6 story 150 dwelling/offices/parking.Details
to erect 6 story 150 dwelling/offices/parking. | $40,000,000 | |
| Oct 13, 2006 | Completed final sign-off Feb 2011 | 3575 Geary Bl | interior non- structural demolition onlyDetails
interior non- structural demolition only | $25,000 | |
| Nov 13, 2002 | Never finaled issued Nov 2002, no final | 3575 Geary Bl | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cahill Contractors Inc (10), Simplex Grinnell (3), Priority Architectural Graphics Dba Prio
- Architects
- Derek Dutton (4), Ignatius Tsang, Tim Mathison
- Engineers
- Marc Press
- Authorized agent-otherss
- Prasad More