Dickinson Cameron Construction Company I
- Based in
- Carlsbad
- On San Francisco permits
- Feb 2006 to Oct 2024
- Last 24 months
- 1 permit filed
123 permits since 2000: 72 completed, 1 in progress, 45 never finaled, 5 expired or cancelled.
Of the 45 never-finaled permits, 3 are 3 to 5 years old, 21 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 123.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2024 | In progress issued Oct 2024 | 240 Stockton St | to obtain final inspection for work approved under pa#: 2019.0425.8929 and 2019.0313.5132. all work is complete.Details
to obtain final inspection for work approved under pa#: 2019.0425.8929 and 2019.0313.5132. all work is complete. | |
| Jul 11, 2022 | Never finaled issued Aug 2022, no final | 124 Geary St | revision to pa# 202108116268 to incorporate interior plan changes including: interior layout modification, interior lighting, mep revisions.Details
revision to pa# 202108116268 to incorporate interior plan changes including: interior layout modification, interior lighting, mep revisions. | |
| Mar 24, 2022 | Never finaled issued Jun 2022, no final | 124 Geary St | storage racks for t.i. under pa# 202108116268Details
storage racks for t.i. under pa# 202108116268 | $12,000 |
| Mar 16, 2022 | Completed final sign-off Jul 2023 | 124 Geary St | revision to 202108116268. interior layout modification. interior lighting layout modification, reuse of (e) stair w/ replacement of (e) lift with (n) lift. structural clarifications & updates to reflect (n) scope.Details
revision to 202108116268. interior layout modification. interior lighting layout modification, reuse of (e) stair w/ replacement of (e) lift with (n) lift. structural clarifications & updates to reflect (n) scope. | |
| Feb 24, 2022 | Never finaled issued May 2022, no final | 124 Geary St | exterior work installation of new storefront systems. storefront doors and claddingDetails
exterior work installation of new storefront systems. storefront doors and cladding | $38,000 |
| Nov 4, 2021 | Completed final sign-off Jul 2023 | 124 Geary St | barracade construction on both sides of t.i. does not attach to historical facade cast iron store front or terracotta surround.Details
barracade construction on both sides of t.i. does not attach to historical facade cast iron store front or terracotta surround. | $5,000 |
| Aug 11, 2021 | Completed final sign-off Jul 2023 | 124 Geary St | t.i.- stair, modification, and associated mepDetails
t.i.- stair, modification, and associated mep | $942,555 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 236 Post St | remove (e) millwork damaged and replace in-kind.construction will be required. work to be in 2 phases as follows. 2/f shall be first to begin, then followed by 1/f. maher n/a.Details
remove (e) millwork damaged and replace in-kind.construction will be required. work to be in 2 phases as follows. 2/f shall be first to begin, then followed by 1/f. maher n/a. | $50,000 |
| Feb 2, 2021 | Completed final sign-off Jun 2021 | 236 Post St | g/f: install (n) manually operated rolling secruity grill at interior of main entrance to protect storefront. no work in prow. no exterior work. maher n/a.Details
g/f: install (n) manually operated rolling secruity grill at interior of main entrance to protect storefront. no work in prow. no exterior work. maher n/a. | $25,000 |
| Nov 12, 2020 | Never finaled issued Feb 2021, no final | 233 Geary St | ste #104, ground flr: installation of security gate at interior of entrance. relocate fire pull station just inside entrance. fire alarm modification under seperate permit.Details
ste #104, ground flr: installation of security gate at interior of entrance. relocate fire pull station just inside entrance. fire alarm modification under seperate permit. | $10,000 |
| Feb 21, 2020 | Never finaled issued Jun 2020, no final | 240 Stockton St | rehabilitation of an (e) sidewalk lift, sidewalk opening dimensions to remain unchangedDetails
rehabilitation of an (e) sidewalk lift, sidewalk opening dimensions to remain unchanged | $187,650 |
| Nov 22, 2019 | Never finaled issued Feb 2020, no final | 240 Stockton St | temporary exterior barricade in prpeparation for demo of (e) non- historical facade and removed at completion of new facade constructionDetails
temporary exterior barricade in prpeparation for demo of (e) non- historical facade and removed at completion of new facade construction | $10,000 |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 240 Stockton St | revision to pa 209-0828-0118 to capture electrical revisionsDetails
revision to pa 209-0828-0118 to capture electrical revisions | |
| Aug 28, 2019 | Never finaled issued Sep 2019, no final | 240 Stockton St | int non structural demo and sub basement floors only. work includes new walls ceilings, fixtures. lighting finishes, mech and ele. no exterior work or work above basementDetails
int non structural demo and sub basement floors only. work includes new walls ceilings, fixtures. lighting finishes, mech and ele. no exterior work or work above basement | $500,000 |
| Aug 9, 2019 | Never finaled issued Sep 2019, no final | 240 Stockton St | racks not accessible to the general public.Details
racks not accessible to the general public. | $500 |
| Aug 1, 2019 | Never finaled issued Aug 2019, no final | 240 Stockton St | revision to 201907246859 for fresh air monitoring on (e) units. no exterior work.Details
revision to 201907246859 for fresh air monitoring on (e) units. no exterior work. | $500 |
| Jul 24, 2019 | Never finaled issued Aug 2019, no final | 240 Stockton St | 2/f: installation of temp a/c units during demolition and construction. ref. t.i. pa201903135132. maher n/a.Details
2/f: installation of temp a/c units during demolition and construction. ref. t.i. pa201903135132. maher n/a. | $5,000 |
| Apr 25, 2019 | Never finaled issued Jun 2019, no final | 240 Stockton St | interior non-structural remodel of first floor & mezzanine. work includes new walls, ceilings, fixtures, lighting, finishes, mechanical and electrical. install new elevator connecting subbasement, basement, first floor, and second floor. store will remain open during construction. no exterior work.Details
interior non-structural remodel of first floor & mezzanine. work includes new walls, ceilings, fixtures, lighting, finishes, mechanical and electrical. install new elevator connecting subbasement, basement, first floor, and second floor. store will remain open during construction. no exterior work. | $1,450,197 |
| Mar 18, 2019 | Completed final sign-off Dec 2019 | 105 Grant Av | replacement in kind of broken entry door and adjacent windowsDetails
replacement in kind of broken entry door and adjacent windows | $161,298 |
| Mar 13, 2019 | Never finaled issued May 2019, no final | 240 Stockton St | interior non structural dem o and ti on 2nd fl only. work includes main stair remodel, new walls, ceilings, fixtures, lighting, finishes, stair cladding, mech and elec. will remain open during constructionDetails
interior non structural dem o and ti on 2nd fl only. work includes main stair remodel, new walls, ceilings, fixtures, lighting, finishes, stair cladding, mech and elec. will remain open during construction | $125,000 |
| Mar 13, 2019 | Never finaled issued Jan 2020, no final | 240 Stockton St | to erect two electric, wall, single faced signs.Details
to erect two electric, wall, single faced signs. | $10,000 |
| Mar 13, 2019 | Never finaled issued Jan 2020, no final | 240 Stockton St | demolition of non-historic, non-structural (e) facade improvements. installation of (n) non-structural facade improvement of same size. no interior work. no work on historic facade.Details
demolition of non-historic, non-structural (e) facade improvements. installation of (n) non-structural facade improvement of same size. no interior work. no work on historic facade. | $300,000 |
| Feb 1, 2019 | Completed final sign-off Jul 2019 | 101 Geary St | revision to pa 201803214236. revision to mep & electrical. no changes to building. no exterior workDetails
revision to pa 201803214236. revision to mep & electrical. no changes to building. no exterior work | |
| Jan 25, 2019 | Completed final sign-off Jun 2019 | 55 Geary St | 1/f: t.i. of (e) retail space - work includes fixtures, partitions, millwork, changing rooms, etc. change of occupancy from a-3 to m. maher n/a.Details
1/f: t.i. of (e) retail space - work includes fixtures, partitions, millwork, changing rooms, etc. change of occupancy from a-3 to m. maher n/a. | $28,000 |
| Jan 4, 2019 | Completed final sign-off Aug 2019 | 55 Geary St | interior non structural demo of fixtures and finishes, no ext work. no work to rated construction. ab-017. n/a for maher.Details
interior non structural demo of fixtures and finishes, no ext work. no work to rated construction. ab-017. n/a for maher. | $20,000 |
| Nov 21, 2018 | Never finaled issued Dec 2018, no final | 101 Geary St | rev to pa #201709209113, 9116 ,9119 for revised soffit details.Details
rev to pa #201709209113, 9116 ,9119 for revised soffit details. | |
| May 14, 2018 | Completed final sign-off May 2018 | 350 Post St | to obtain final inspection for work approved under pa#201511122446. all work is complete.Details
to obtain final inspection for work approved under pa#201511122446. all work is complete. | |
| Apr 2, 2018 | Never finaled issued Apr 2018, no final | 835 Market St | demo interior finishes, remodel retail space to include new partitions, lighting, electrical under seperate permitDetails
demo interior finishes, remodel retail space to include new partitions, lighting, electrical under seperate permit | $135,000 |
| Mar 26, 2018 | Never finaled issued Apr 2018, no final | 835 Market St | adjust permit to document scope of work. cost include mech & electrical only. building cost captured under pa# 201804025292. maher naDetails
adjust permit to document scope of work. cost include mech & electrical only. building cost captured under pa# 201804025292. maher na | $30,000 |
| Mar 21, 2018 | Completed final sign-off Jul 2019 | 101 Geary St | interior ti for (n) retail store. exterior under separate permitDetails
interior ti for (n) retail store. exterior under separate permit | $60,000 |
| Dec 5, 2017 | Never finaled issued Mar 2018, no final | 201 Post St | to erect electric, wall, projecting, double faced sign. install 2 cartier signsDetails
to erect electric, wall, projecting, double faced sign. install 2 cartier signs | $6,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | interior ti to include construction of (e) ground level retail store. exterior work to include (n) storefront, signage & exterior cladding. signs & interior work under separate permitDetails
interior ti to include construction of (e) ground level retail store. exterior work to include (n) storefront, signage & exterior cladding. signs & interior work under separate permit | $20,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | erect electric, single-faced, indirect (n) sign.Details
erect electric, single-faced, indirect (n) sign. | $1,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | erect electric, double-faced, indirect, (n) signDetails
erect electric, double-faced, indirect, (n) sign | $500 |
| Sep 1, 2017 | Completed final sign-off Dec 2017 | 865 Market St | unit #102: interior ti - new storefront (interior), interior reno including(n) flooring, new finished ceiling, installation of finishes & fixtures, new electrical panels. existing transformer to remain, new lighting, new plumbing for sales area sinks. existing hvac unit to remain with new diffusers.Details
unit #102: interior ti - new storefront (interior), interior reno including(n) flooring, new finished ceiling, installation of finishes & fixtures, new electrical panels. existing transformer to remain, new lighting, new plumbing for sales area sinks. existing hvac unit to remain with new diffusers. | $175,000 |
| Aug 22, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | revision to 201705025489, minor structural changes for selected elevator, new curb shape, chandelier attachment and misc.Details
revision to 201705025489, minor structural changes for selected elevator, new curb shape, chandelier attachment and misc. | $10,000 |
| Aug 4, 2017 | Completed final sign-off Dec 2017 | 845 Market St | suite #189: renovation of an extg retail space in a mall shell for new tenant. new store front facade. no change in use or occupancy. demo permit obtained under separate permit #201707121710. n/a for maherDetails
suite #189: renovation of an extg retail space in a mall shell for new tenant. new store front facade. no change in use or occupancy. demo permit obtained under separate permit #201707121710. n/a for maher | $150,000 |
| Jul 12, 2017 | Never finaled issued Oct 2017, no final | 845 Market St | demo of existing interior furnishings and storefront of an existing retail store. interior tenant improvment under separate permit. soft demolition at interior space, vacant tenant space, full accessibility to be filed under tenant improvement permit per sfbc ab-017. n/a for maher.Details
demo of existing interior furnishings and storefront of an existing retail store. interior tenant improvment under separate permit. soft demolition at interior space, vacant tenant space, full accessibility to be filed under tenant improvement permit per sfbc ab-017. n/a for maher. | $10,000 |
| Jun 26, 2017 | Completed final sign-off Mar 2018 | 350 Post St | location of emergency evacuation signage per tenant improvement no change useDetails
location of emergency evacuation signage per tenant improvement no change use | $5,000 |
| May 11, 2017 | Never finaled issued Nov 2017, no final | 201 Post St | renovation of (e) retail tenant on basement and grnd flr levels. (n) equipment & finshes, mep included. signage, fire alarm, sprinklers & barricade on seperate permit. demo/structural under #2017-0502-5489. exterior storefront under #2017-0328-2582.Details
renovation of (e) retail tenant on basement and grnd flr levels. (n) equipment & finshes, mep included. signage, fire alarm, sprinklers & barricade on seperate permit. demo/structural under #2017-0502-5489. exterior storefront under #2017-0328-2582. | $3,000,000 |
| May 2, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floorDetails
demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floor | $176,000 |
| Mar 28, 2017 | Never finaled issued Dec 2017, no final | 199 Grant Av | exterior store front with (n) door & windows. signage under seperate permit.Details
exterior store front with (n) door & windows. signage under seperate permit. | $20,000 |
| Feb 6, 2017 | Completed final sign-off Mar 2018 | 350 Post St | revision to 201505126122 lighting only no exterior workDetails
revision to 201505126122 lighting only no exterior work | |
| Jan 31, 2017 | Completed final sign-off Apr 2018 | 350 Post St | to erect electric single faced signDetails
to erect electric single faced sign | $2,000 |
| Jan 31, 2017 | Completed final sign-off Mar 2018 | 350 Post St | to erect non electric single faced signsDetails
to erect non electric single faced signs | $10,000 |
| Jan 31, 2017 | Completed final sign-off Apr 2018 | 350 Post St | new atlas statue with clock to be installed above main entrance approved on minor permit to alter case #2015-01-2882 ptaDetails
new atlas statue with clock to be installed above main entrance approved on minor permit to alter case #2015-01-2882 pta | $30,000 |
| Jan 31, 2017 | Completed final sign-off Mar 2018 | 350 Post St | to erect non electric single faced signDetails
to erect non electric single faced sign | $3,500 |
| Jan 31, 2017 | Completed final sign-off Apr 2018 | 350 Post St | to erect electric single faced signsDetails
to erect electric single faced signs | $15,000 |
| Nov 28, 2016 | Completed final sign-off May 2018 | 350 Post St | revision to 201505216889. addition of smoke curtains at top and bottom of stair #4Details
revision to 201505216889. addition of smoke curtains at top and bottom of stair #4 | $10,000 |
| Sep 13, 2016 | Completed final sign-off Mar 2018 | 350 Post St | structural revisions in field- to approved. pa 201502198787Details
structural revisions in field- to approved. pa 201502198787 | $10,000 |
| Sep 12, 2016 | Completed final sign-off Mar 2018 | 350 Post St | mep revisions only to 201605126122 fire protection on sep permit. maher not reqDetails
mep revisions only to 201605126122 fire protection on sep permit. maher not req | $10,000 |
| Apr 7, 2016 | Never finaled issued Apr 2016, no final | 77 Ofarrell St | 5th floor: revision to appl #201512145108 - for lighting t-24 compliance.Details
5th floor: revision to appl #201512145108 - for lighting t-24 compliance. | |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 77 Ofarrell St | 5th flr: stock shelving for retail use.Details
5th flr: stock shelving for retail use. | $47,000 |
| Feb 8, 2016 | Completed final sign-off Jun 2016 | 835 Market St | revision to pa 2015-0915-7052: install new shelving racks in (e) retail space..vif clearance between stored items and sprinkler heads.Details
revision to pa 2015-0915-7052: install new shelving racks in (e) retail space..vif clearance between stored items and sprinkler heads. | $9,500 |
| Jan 28, 2016 | Never finaled issued Feb 2016, no final | 77 Ofarrell St | construction of partition wall on 6th fl of retail bldg for conversion of retail departmentDetails
construction of partition wall on 6th fl of retail bldg for conversion of retail department | $30,000 |
| Dec 14, 2015 | Completed final sign-off Aug 2016 | 77 Ofarrell St | 5th floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes.Details
5th floor: t.i. to convert retail department. work includes non-structural demo and construction of new partitions millwork and finishes. | $700,000 |
| Nov 12, 2015 | Expired or cancelled expired May 2018 | 350 Post St | basement: fixed & mobile shelving units in basement stockroom, addition to approved t.i. pa 201504294925.Details
basement: fixed & mobile shelving units in basement stockroom, addition to approved t.i. pa 201504294925. | $15,000 |
| Nov 5, 2015 | Completed final sign-off Jun 2016 | 835 Market St | buid out temporary store for louis vuitton within bloomingdales. n/a maher ordinanceDetails
buid out temporary store for louis vuitton within bloomingdales. n/a maher ordinance | $35,000 |
| Oct 22, 2015 | Completed final sign-off May 2018 | 350 Post St | electrical revisions only to 201505126122. no other workDetails
electrical revisions only to 201505126122. no other work | |
| Sep 24, 2015 | Completed final sign-off Mar 2018 | 350 Post St | basement area minor revision to pa 2015 0429 4925. changes are bubbled on plansDetails
basement area minor revision to pa 2015 0429 4925. changes are bubbled on plans | |
| Sep 15, 2015 | Completed final sign-off May 2016 | 835 Market St | renovation and expansion of an (e) louis vuitton store at westfield san francisco center. n/a ordinance #155-13Details
renovation and expansion of an (e) louis vuitton store at westfield san francisco center. n/a ordinance #155-13 | $300,000 |
| Aug 12, 2015 | Expired or cancelled cancelled Sep 2015 | 350 Post St | basement area minor revision to pa 201504294925. changes are bubbled on plansDetails
basement area minor revision to pa 201504294925. changes are bubbled on plans | |
| Jul 24, 2015 | Completed final sign-off Dec 2015 | 212 Stockton St | 1st & 2nd flrs: interior only non structural soft demo for tenant improvement. sfab-017Details
1st & 2nd flrs: interior only non structural soft demo for tenant improvement. sfab-017 | $10,000 |
| Jul 6, 2015 | Completed final sign-off Dec 2015 | 865 Market St | space #138: minor revision to pa 201504284843 due to in field conditions, revisions include relocation of i.t. & storage rooms; maher n/aDetails
space #138: minor revision to pa 201504284843 due to in field conditions, revisions include relocation of i.t. & storage rooms; maher n/a | $5,000 |
| Jun 8, 2015 | Never finaled issued Jun 2015, no final | 233 Geary St | revision to 201506037902, removal of beam notch from scope of work. fire proofing to be performed per previously approved permitDetails
revision to 201506037902, removal of beam notch from scope of work. fire proofing to be performed per previously approved permit | |
| Jun 8, 2015 | Never finaled issued Jun 2015, no final | 233 Geary St | temporary exterior barricade to install new storefront approved under 201410108658Details
temporary exterior barricade to install new storefront approved under 201410108658 | $10,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 233 Geary St | revision to app#201502239094. per electrical inspectors request. revisided t-24 reflected ceiling and fixture schedule. electrical work only.Details
revision to app#201502239094. per electrical inspectors request. revisided t-24 reflected ceiling and fixture schedule. electrical work only. | |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 233 Geary St | alteration of an existing structural member & method of fire proofing maintaining 2hr rating. associated with ti pa 201502239094.Details
alteration of an existing structural member & method of fire proofing maintaining 2hr rating. associated with ti pa 201502239094. | $5,000 |
| May 21, 2015 | Completed final sign-off Jul 2016 | 350 Post St | t.i. construction of non structural partition, elevator, restrooms. new staircase- basement, first & second floor. mep under seperate permit, fire deferred.Details
t.i. construction of non structural partition, elevator, restrooms. new staircase- basement, first & second floor. mep under seperate permit, fire deferred. | $550,000 |
| May 12, 2015 | Completed final sign-off Mar 2018 | 350 Post St | mep work for ti. of retail store, no exterior work, fire protection under separate permit.Details
mep work for ti. of retail store, no exterior work, fire protection under separate permit. | $750,000 |
| Apr 29, 2015 | Completed final sign-off Mar 2018 | 350 Post St | ground flr & basement: phase 1b - ti for (e) retail store. work includes (n) partitions, casework, fixtures (n) ada restrooms; re-cladding of (e) elevator lab. no exterior. mep & fire protection under sep. permitDetails
ground flr & basement: phase 1b - ti for (e) retail store. work includes (n) partitions, casework, fixtures (n) ada restrooms; re-cladding of (e) elevator lab. no exterior. mep & fire protection under sep. permit | $50,000 |
| Apr 29, 2015 | Never finaled issued May 2015, no final | 233 Geary St | revision to app#201502047465: fill of concrete over metal deck where previously extg elevator was removed.Details
revision to app#201502047465: fill of concrete over metal deck where previously extg elevator was removed. | $5,000 |
| Apr 28, 2015 | Completed final sign-off Dec 2015 | 865 Market St | space #138 - complete renovation of interior retail space in existing space work includes soft demo & installation of new paritions, bathroom & finishes including mep. n/a maher ordinanceDetails
space #138 - complete renovation of interior retail space in existing space work includes soft demo & installation of new paritions, bathroom & finishes including mep. n/a maher ordinance | $250,000 |
| Apr 22, 2015 | Never finaled issued May 2015, no final | 110 Geary St | erect a non-electric single faced window sign at front.Details
erect a non-electric single faced window sign at front. | $1,000 |
| Apr 22, 2015 | Completed final sign-off Mar 2018 | 350 Post St | construction of temp. office space and break room on 2nd floor. no exterior work. fire protection under seperate permit.Details
construction of temp. office space and break room on 2nd floor. no exterior work. fire protection under seperate permit. | $50,000 |
| Apr 20, 2015 | Completed final sign-off Mar 2018 | 350 Post St | phase 1 - terior soft demo per ab 017 on basement, 1st floor and 2nd floors of retail store. no construction under this permit. fire protection to be unaffected.Details
phase 1 - terior soft demo per ab 017 on basement, 1st floor and 2nd floors of retail store. no construction under this permit. fire protection to be unaffected. | $30,000 |
| Mar 26, 2015 | Never finaled issued Jun 2015, no final | 233 Geary St | erect a electric single faced wall sign.Details
erect a electric single faced wall sign. | $10,000 |
| Mar 26, 2015 | Never finaled issued Jun 2015, no final | 233 Geary St | erect a electric single faced wall sign.Details
erect a electric single faced wall sign. | $10,000 |
| Feb 23, 2015 | Never finaled issued Apr 2015, no final | 233 Geary St | ti for (n) retail space o ground flr. work includes (n) partitions, fixtures, equipment & mep. storefront under separate permit 2014-0925-7355. fire protection under separate permit.Details
ti for (n) retail space o ground flr. work includes (n) partitions, fixtures, equipment & mep. storefront under separate permit 2014-0925-7355. fire protection under separate permit. | $500,000 |
| Feb 19, 2015 | Completed final sign-off May 2018 | 350 Post St | facade renovation including expansion of glazing area, replacement of exterior finishes on ground and 2nd level and removal of awning and scones.Details
facade renovation including expansion of glazing area, replacement of exterior finishes on ground and 2nd level and removal of awning and scones. | $80,000 |
| Feb 4, 2015 | Never finaled issued Apr 2015, no final | 233 Geary St | demo of e non operational escalator on mezz level. work is structural framing and patching of ceiling on 1st floor after escalator is removed. barrier removal per ab017. ti to followDetails
demo of e non operational escalator on mezz level. work is structural framing and patching of ceiling on 1st floor after escalator is removed. barrier removal per ab017. ti to follow | $10,000 |
| Nov 20, 2014 | Completed final sign-off Aug 2015 | 110 Geary St | interior demo at gr fl level to remove previous ti improvements. remove e millwork, lighting, and partitions per plan. no change to egress occupancy or building use. install new flooring, finishes, partitions. install new accessible restroom. new lighting. modify e hvac system. sprinklers under sepDetails
interior demo at gr fl level to remove previous ti improvements. remove e millwork, lighting, and partitions per plan. no change to egress occupancy or building use. install new flooring, finishes, partitions. install new accessible restroom. new lighting. modify e hvac system. sprinklers under sep | $385,000 |
| Nov 20, 2014 | Never finaled issued Jul 2015, no final | 110 Geary St | exterior metal sign attached to glass with adhesiveDetails
exterior metal sign attached to glass with adhesive | $200 |
| Nov 12, 2014 | Completed final sign-off Aug 2015 | 110 Geary St | replace e storefront. interior ti. renovation will be under separate permit.Details
replace e storefront. interior ti. renovation will be under separate permit. | $60,000 |
| Oct 10, 2014 | Completed final sign-off May 2016 | 233 Geary St | storefront and installation of proposed storefront. all other work under separate p.a. signage under sep. p.a.Details
storefront and installation of proposed storefront. all other work under separate p.a. signage under sep. p.a. | $35,000 |
| Sep 25, 2014 | Completed final sign-off Oct 2014 | 233 Geary St | interior soft demo in ground floor retail space. per ab017. no construction work. interior non structural demolitio only under this permit.Details
interior soft demo in ground floor retail space. per ab017. no construction work. interior non structural demolitio only under this permit. | $15,000 |
| Sep 16, 2014 | Completed final sign-off Mar 2015 | 110 Geary St | interior demolition at ground level to remove previous t.i. . accessible upgrades to be provided in the t.i. application under sfbc ab-017. remove millwork, lighting and partitions per plan. no change to egress,occupancy or bldg use. all demo non structural. sprinkler under seperate permit.Details
interior demolition at ground level to remove previous t.i. . accessible upgrades to be provided in the t.i. application under sfbc ab-017. remove millwork, lighting and partitions per plan. no change to egress,occupancy or bldg use. all demo non structural. sprinkler under seperate permit. | $11,000 |
| Feb 10, 2014 | Completed final sign-off May 2014 | 865 Market St | space #120:interior non-structural t.i. of extg retail space. fire alarm and sprinklers under seperate permit.n/a for the maher ordinance #155-13. n/a for the interim controls #428-13Details
space #120:interior non-structural t.i. of extg retail space. fire alarm and sprinklers under seperate permit.n/a for the maher ordinance #155-13. n/a for the interim controls #428-13 | $112,375 |
| Nov 6, 2013 | Completed final sign-off Sep 2014 | 45 Powell St | exterior facade renovation, new storefront. signage.Details
exterior facade renovation, new storefront. signage. | $100,000 |
| Nov 6, 2013 | Completed final sign-off Feb 2014 | 45 Powell St | mechanical permit for existing retail store.Details
mechanical permit for existing retail store. | $50,000 |
| Sep 30, 2013 | Completed final sign-off Nov 2013 | 3251 20th Av | installation of steel storage racks. t.i. approved under app#201303202673Details
installation of steel storage racks. t.i. approved under app#201303202673 | $15,000 |
| Sep 27, 2013 | Completed final sign-off Nov 2013 | 3251 20th Av | structural revision to pa# 201303202673 & pa# 201305207407 changes to include removal of portion of structural steel transfer ginders, welding of new steel plates and minor furring out of the mall bulkhead fascia and column wrap.Details
structural revision to pa# 201303202673 & pa# 201305207407 changes to include removal of portion of structural steel transfer ginders, welding of new steel plates and minor furring out of the mall bulkhead fascia and column wrap. | $5,000 |
| Sep 24, 2013 | Completed final sign-off Feb 2014 | 45 Powell St | interior non-structural demo at existing retail store on ground level - non-structural partitions, millwork, counters, floor, wall & ceiling finishes. no structural work and no work on facade. ab-017.Details
interior non-structural demo at existing retail store on ground level - non-structural partitions, millwork, counters, floor, wall & ceiling finishes. no structural work and no work on facade. ab-017. | $20,000 |
| Jun 28, 2013 | Completed final sign-off Nov 2013 | 3251 20th Av | revision to pa# 2013-0320-2673 (architectural) & 2013-0520-7407 (mep). re-configuration of storeDetails
revision to pa# 2013-0320-2673 (architectural) & 2013-0520-7407 (mep). re-configuration of store | $18,000 |
| Jun 26, 2013 | Completed final sign-off Nov 2013 | 3251 20th Av | revision to app#201303202673. revised foundation and structural footings.Details
revision to app#201303202673. revised foundation and structural footings. | $35,000 |
| May 20, 2013 | Completed final sign-off Nov 2013 | 3251 20th Av | mep work for extg retail space. ti approved under app#201303202673.Details
mep work for extg retail space. ti approved under app#201303202673. | $75,000 |
| May 15, 2013 | Completed final sign-off Sep 2013 | 2033 Fillmore St | interior/exterior soft demo on ground floor retail space, per ab-017. no construction work, also remove signage letters on facade.Details
interior/exterior soft demo on ground floor retail space, per ab-017. no construction work, also remove signage letters on facade. | $10,000 |
| Mar 20, 2013 | Completed final sign-off Nov 2013 | 3251 20th Av | t.i. of (e) space. work includes non-structural partitions, ceilings, finishes, furniture & structural work. sprinklers, fire alarm, signage, storage rackes, mechanical, electrical & plumbing under separate permits.Details
t.i. of (e) space. work includes non-structural partitions, ceilings, finishes, furniture & structural work. sprinklers, fire alarm, signage, storage rackes, mechanical, electrical & plumbing under separate permits. | $1,937,000 |
| Feb 21, 2013 | Expired or cancelled cancelled Jan 2026 | 250 Post St | remodel of main sale area. new counters and cabinets and finishes, lighting minor mechanical workDetails
remodel of main sale area. new counters and cabinets and finishes, lighting minor mechanical work | $100,000 |
| Sep 25, 2012 | Never finaled issued Oct 2012, no final | 250 Post St | basement level-construction of new workshop in (e) space. new finishes & fixtures. new hvac, electrical & plumbing. *steamer hood - sprinkler on seperate permitDetails
basement level-construction of new workshop in (e) space. new finishes & fixtures. new hvac, electrical & plumbing. *steamer hood - sprinkler on seperate permit | $120,000 |