Dickinson Cameron Construction Company I
- Based in
- Carlsbad
- On San Francisco permits
- Feb 2006 to Oct 2024
- Last 24 months
- 1 permit filed
123 permits since 2000: 72 completed, 1 in progress, 45 never finaled, 5 expired or cancelled.
Of the 45 never-finaled permits, 3 are 3 to 5 years old, 21 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 7 completed, 4 never finaled. Typically 49 days from filing to permit and 476 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2022 | Completed final sign-off Jul 2023 | 124 Geary St | revision to 202108116268. interior layout modification. interior lighting layout modification, reuse of (e) stair w/ replacement of (e) lift with (n) lift. structural clarifications & updates to reflect (n) scope.Details
revision to 202108116268. interior layout modification. interior lighting layout modification, reuse of (e) stair w/ replacement of (e) lift with (n) lift. structural clarifications & updates to reflect (n) scope. | |
| Aug 11, 2021 | Completed final sign-off Jul 2023 | 124 Geary St | t.i.- stair, modification, and associated mepDetails
t.i.- stair, modification, and associated mep | $942,555 |
| Mar 13, 2019 | Never finaled issued May 2019, no final | 240 Stockton St | interior non structural dem o and ti on 2nd fl only. work includes main stair remodel, new walls, ceilings, fixtures, lighting, finishes, stair cladding, mech and elec. will remain open during constructionDetails
interior non structural dem o and ti on 2nd fl only. work includes main stair remodel, new walls, ceilings, fixtures, lighting, finishes, stair cladding, mech and elec. will remain open during construction | $125,000 |
| May 2, 2017 | Never finaled issued Aug 2017, no final | 201 Post St | demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floorDetails
demo/structural work only. minor demo to basement & 1st floor to remove existing stairs and non bearing partition. structural to relocate some existing columns in basement. new stairs between basement & 1st floor, new catwall to level 1. new elevator from basement to 1st floor | $176,000 |
| Nov 28, 2016 | Completed final sign-off May 2018 | 350 Post St | revision to 201505216889. addition of smoke curtains at top and bottom of stair #4Details
revision to 201505216889. addition of smoke curtains at top and bottom of stair #4 | $10,000 |
| May 21, 2015 | Completed final sign-off Jul 2016 | 350 Post St | t.i. construction of non structural partition, elevator, restrooms. new staircase- basement, first & second floor. mep under seperate permit, fire deferred.Details
t.i. construction of non structural partition, elevator, restrooms. new staircase- basement, first & second floor. mep under seperate permit, fire deferred. | $550,000 |
| Jul 20, 2012 | Completed final sign-off Nov 2013 | 233 Post St | revision to pa# 2012/04/26/9177. relocate new stairs and add structural supportDetails
revision to pa# 2012/04/26/9177. relocate new stairs and add structural support | $10,000 |
| Dec 3, 2010 | Never finaled issued Dec 2010, no final | 1 Grant Av | non strucutural and non historic inteior demo at 1st and mezzanine levels. per ab017. no structural or stair removalDetails
non strucutural and non historic inteior demo at 1st and mezzanine levels. per ab017. no structural or stair removal | $20,000 |
| Nov 22, 2010 | Never finaled issued Dec 2010, no final | 1 Grant Av | non structural and non historic interior demolition at basement per ab 017, no struc or stair removal.Details
non structural and non historic interior demolition at basement per ab 017, no struc or stair removal. | $20,000 |
| Aug 4, 2006 | Completed final sign-off Dec 2007 | 207 Powell St | original appl# 200602174893-one story change construction type "v" to type 1-8 story increase fire rating at stair/elevator shafts to 2-hr from 1-hr. increase fire rating at corridor to 2-hr from 1-hr.Details
original appl# 200602174893-one story change construction type "v" to type 1-8 story increase fire rating at stair/elevator shafts to 2-hr from 1-hr. increase fire rating at corridor to 2-hr from 1-hr. | |
| Feb 17, 2006 | Completed final sign-off Dec 2007 | 207 Powell St | tenant improvement for an existing retail space 5,159 sq.ft.new store front.work is basement & 1/f, install new elevator and stairs.Details
tenant improvement for an existing retail space 5,159 sq.ft.new store front.work is basement & 1/f, install new elevator and stairs. | $500,000 |