Block 0313, lot 001
101 Geary St
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 4
- Units
- 1
- Rooms
- 7 bathrooms
- Building
- 12,540 sq ft
- Lot
- 2,200 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
47 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2022 | Never finaled issued Aug 2023, no final | 101 Geary St | Endeavor Wireless Construction Inc | verizon wireless - modification of (e) telecomm facility. install 2 (n) radio 8863 units at antennas. 2 (n) filters at antennas. 2 (n) twin diplexers at antennas. 1 (n) raycap 6627 surge supressor. 1 (n) 12x24 hybrid cable. r&r (e) equipment cabinet & batteries, frp radone & mount pipe.Details
verizon wireless - modification of (e) telecomm facility. install 2 (n) radio 8863 units at antennas. 2 (n) filters at antennas. 2 (n) twin diplexers at antennas. 1 (n) raycap 6627 surge supressor. 1 (n) 12x24 hybrid cable. r&r (e) equipment cabinet & batteries, frp radone & mount pipe. | $50,000 |
| Jan 5, 2021 | Never finaled issued Oct 2021, no final | 103 Geary St | Pacific Wide Builders Inc. | 1/f: demo of (e) storefront as indicated on the drawings. installation of new storefront system & entry doors. maher n/a. partial compliance to nov201946251. t.i. under sep permit pa202101052063.Details
1/f: demo of (e) storefront as indicated on the drawings. installation of new storefront system & entry doors. maher n/a. partial compliance to nov201946251. t.i. under sep permit pa202101052063. | $100,000 |
| Jan 5, 2021 | Completed final sign-off Nov 2021 | 103 Geary St | Pacific Wide Builders Inc. | new sign: install 1 illuminated single faced halo lit wall sign above entry doors. storefront t.i. under pa 202101052075 maher n/a.Details
new sign: install 1 illuminated single faced halo lit wall sign above entry doors. storefront t.i. under pa 202101052075 maher n/a. | |
| Jan 5, 2021 | Never finaled issued Oct 2021, no final | 103 Geary St | Pacific Wide Builders Inc. | new sign: install 1 non-illuminated single faced wall plaque. storefront t.i. under pa 202101052075 maher n/a.Details
new sign: install 1 non-illuminated single faced wall plaque. storefront t.i. under pa 202101052075 maher n/a. | |
| Jan 5, 2021 | Never finaled issued Jun 2021, no final | 103 Geary St | Royal Presidio Construction | 1/f: tenant improvement of interior. new non-structural partitions, finishes, fixtures, electrical & millwork. maher n/a.Details
1/f: tenant improvement of interior. new non-structural partitions, finishes, fixtures, electrical & millwork. maher n/a. | $153,000 |
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 110 Geary St | street spaceDetails
street space | ||
| Sep 6, 2019 | Never finaled issued Sep 2019, no final | 110 Geary St | street spaceDetails
street space | ||
| Jun 10, 2019 | Never finaled issued Jun 2019, no final | 110 Geary St | street spaceDetails
street space | ||
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 110 Geary St | street spaceDetails
street space | ||
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 110 Geary St | Trainor Commercial Construction Inc. | to comply w/ n.o.v 201946251. replace damaged window and frame in-kind. work consistant w/ privious approval #214-003121 ptaDetails
to comply w/ n.o.v 201946251. replace damaged window and frame in-kind. work consistant w/ privious approval #214-003121 pta | $100,000 |
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 101 Geary St | City Signs | install 2 illuminated single-faced wall sign "dita"Details
install 2 illuminated single-faced wall sign "dita" | $5,000 |
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 101 Geary St | City Signs | install 1 illuminated double-faced projecting sign "dita"Details
install 1 illuminated double-faced projecting sign "dita" | $3,000 |
| Feb 1, 2019 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | revision to pa 201803214236. revision to mep & electrical. no changes to building. no exterior workDetails
revision to pa 201803214236. revision to mep & electrical. no changes to building. no exterior work | |
| Jan 8, 2019 | Never finaled issued Jan 2019, no final | 101 Geary St | street space onlyDetails
street space only | ||
| Nov 21, 2018 | Never finaled issued Dec 2018, no final | 101 Geary St | Dickinson Cameron Construction Company I | rev to pa #201709209113, 9116 ,9119 for revised soffit details.Details
rev to pa #201709209113, 9116 ,9119 for revised soffit details. | |
| Mar 21, 2018 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | interior ti for (n) retail store. exterior under separate permitDetails
interior ti for (n) retail store. exterior under separate permit | $60,000 |
| Dec 8, 2017 | Expired or cancelled cancelled Jan 2026 | 110 Geary St | lettering on glassDetails
lettering on glass | $1,000 | |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | interior ti to include construction of (e) ground level retail store. exterior work to include (n) storefront, signage & exterior cladding. signs & interior work under separate permitDetails
interior ti to include construction of (e) ground level retail store. exterior work to include (n) storefront, signage & exterior cladding. signs & interior work under separate permit | $20,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | erect electric, single-faced, indirect (n) sign.Details
erect electric, single-faced, indirect (n) sign. | $1,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | erect electric, double-faced, indirect, (n) signDetails
erect electric, double-faced, indirect, (n) sign | $500 |
| Mar 20, 2017 | Never finaled issued Jul 2017, no final | 103 Geary St | Trainor Commercial Construction Inc. | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | $3,000 |
| Dec 6, 2016 | Completed final sign-off Jun 2017 | 103 Geary St | Trainor Commercial Construction Inc. | interior tenant improvement. facade under separate permitDetails
interior tenant improvement. facade under separate permit | $155,000 |
| Dec 5, 2016 | Never finaled issued Jan 2017, no final | 103 Geary St | Trainor Commercial Construction Inc. | temporary baricade. no interior workDetails
temporary baricade. no interior work | $5,000 |
| Dec 1, 2016 | Never finaled issued Jan 2017, no final | 103 Geary St | Trainor Commercial Construction Inc. | non-structural interior demo/ per ab-017. space to remain vacant until ada features restoredDetails
non-structural interior demo/ per ab-017. space to remain vacant until ada features restored | $10,000 |
| Oct 12, 2016 | Completed final sign-off Jun 2017 | 103 Geary St | Trainor Commercial Construction Inc. | demo of (e) storefront. install (n) storefront system & entry doors. signage under separate permit. no interior work.Details
demo of (e) storefront. install (n) storefront system & entry doors. signage under separate permit. no interior work. | $100,000 |
| Aug 19, 2015 | Never finaled issued Aug 2015, no final | 109 Geary St | street space & sidewalkDetails
street space & sidewalk | ||
| Jun 10, 2015 | Completed final sign-off May 2016 | 101 Geary St | Jfc Construction Inc. | installation of (n) verizon wireless micro wireless telecommunications services facility consisting of: (1)(n) cabinet, (2)(n) panel antennas within frp simulated vent & (4)(n) rrus on (e) roof.Details
installation of (n) verizon wireless micro wireless telecommunications services facility consisting of: (1)(n) cabinet, (2)(n) panel antennas within frp simulated vent & (4)(n) rrus on (e) roof. | $50,000 |
| Apr 22, 2015 | Never finaled issued May 2015, no final | 110 Geary St | Dickinson Cameron Construction Company I | erect a non-electric single faced window sign at front.Details
erect a non-electric single faced window sign at front. | $1,000 |
| Feb 19, 2015 | Completed final sign-off Jul 2015 | 110 Geary St | Station 1 Fire Protection | relocate 17 fire sprinklers, plug 2 fire sprinklers, and add 2 fire sprinklers. t.i. 201411202069Details
relocate 17 fire sprinklers, plug 2 fire sprinklers, and add 2 fire sprinklers. t.i. 201411202069 | $15,000 |
| Feb 18, 2015 | Completed final sign-off Jul 2015 | 110 Geary St | Pyro-Comm Systems, Inc. | new fire alarm devices added to tenant improvement in an existing building to include 1 pull station, 2 strobes, 3 horn/strobes 1st floor 201411202069. n/a for maherDetails
new fire alarm devices added to tenant improvement in an existing building to include 1 pull station, 2 strobes, 3 horn/strobes 1st floor 201411202069. n/a for maher | $4,300 |
| Sep 16, 2014 | Completed final sign-off Mar 2015 | 110 Geary St | Dickinson Cameron Construction Company I | interior demolition at ground level to remove previous t.i. . accessible upgrades to be provided in the t.i. application under sfbc ab-017. remove millwork, lighting and partitions per plan. no change to egress,occupancy or bldg use. all demo non structural. sprinkler under seperate permit.Details
interior demolition at ground level to remove previous t.i. . accessible upgrades to be provided in the t.i. application under sfbc ab-017. remove millwork, lighting and partitions per plan. no change to egress,occupancy or bldg use. all demo non structural. sprinkler under seperate permit. | $11,000 |
| Aug 5, 2014 | Completed final sign-off Sep 2014 | 109 Geary St | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $55,800 |
| Sep 21, 2012 | Never finaled issued Oct 2012, no final | 101 Geary St | Teel Construction Inc. | t.i for existing swatch retail store. relocate furniture, relocate electrical outlets & fixtures. new finishes, minor changes to partitions and doors.Details
t.i for existing swatch retail store. relocate furniture, relocate electrical outlets & fixtures. new finishes, minor changes to partitions and doors. | $40,000 |
| May 25, 2012 | Never finaled issued Sep 2012, no final | 101 Geary St | Johnston Sign Company | erect electric, wall, single-faced, sign.Details
erect electric, wall, single-faced, sign. | $8,000 |
| May 25, 2012 | Never finaled issued Sep 2012, no final | 101 Geary St | Johnston Sign Company | erect electric, projecting, double-faced, sign.Details
erect electric, projecting, double-faced, sign. | $5,000 |
| May 4, 2011 | Completed final sign-off Jun 2011 | 101 Geary St | Teel Construction Inc. | to correct type of construction on pa#201009020104 from 2a to 3b (for documentation purpose only).Details
to correct type of construction on pa#201009020104 from 2a to 3b (for documentation purpose only). | |
| Mar 2, 2011 | Completed final sign-off Jun 2011 | 101 Geary St | Teel Construction Inc. | swatch +. install two illuminated channel letters wall sign.Details
swatch +. install two illuminated channel letters wall sign. | $10,000 |
| Sep 2, 2010 | Never finaled issued Apr 2011, no final | 101 Geary St | Teel Construction Inc. | interior ti of existing retail spaceDetails
interior ti of existing retail space | $65,000 |
| Oct 25, 2000 | Expired or cancelled expired Feb 2001 | 101 Geary St | Johnston Sign Company | to erect electrical signDetails
to erect electrical sign | |
| Oct 20, 2000 | Completed final sign-off Jan 2001 | 107 Geary St | Zebra Awning Co Inc | erect a double faced, projecting bannerDetails
erect a double faced, projecting banner | |
| Oct 20, 2000 | Completed final sign-off Jan 2001 | 107 Geary St | Zebra Awning Co Inc | fabricate & install one awningDetails
fabricate & install one awning | $800 |
| Aug 18, 2000 | Completed final sign-off Oct 2000 | 110 Geary St | Young Electric Co | remove 4 extg smoke detector and 2 horn strobesDetails
remove 4 extg smoke detector and 2 horn strobes | $1,200 |
| Aug 4, 2000 | Expired or cancelled expired Feb 2001 | 109 Geary St | remove (e)deteriorated plaster wall at (e)2nd flrDetails
remove (e)deteriorated plaster wall at (e)2nd flr | $8,000 | |
| Jun 16, 2000 | Expired or cancelled expired Jan 2001 | 110 Geary St | Ad Art Electronic Sign Corporation | install (1) one canvas awning over entrance 2'-1x6'9"x3' projectionDetails
install (1) one canvas awning over entrance 2'-1x6'9"x3' projection | $1,800 |
| Jun 16, 2000 | Expired or cancelled cancelled Oct 2003 | 110 Geary St | Ad Art Electronic Sign Corporation | to erect non electric single faced signDetails
to erect non electric single faced sign | $1,800 |
| Jun 12, 2000 | Expired or cancelled expired Sep 2001 | 101 Geary St | remodel of existing space include framing, electrical,plumbing,mechanical &new finishes in&exterior.Details
remodel of existing space include framing, electrical,plumbing,mechanical &new finishes in&exterior. | $75,000 | |
| May 17, 2000 | Expired or cancelled expired Jul 2001 | 107 Geary St | J W Rigney Construction Inc | remodel storefront to accommodate handicapped entry to a height of 8 ft. upgrade existing electricalDetails
remodel storefront to accommodate handicapped entry to a height of 8 ft. upgrade existing electrical | $51,450 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dickinson Cameron Construction Company I (8), Trainor Commercial Construction Inc. (6), Teel Construction Inc. (4), Johnston Sign Company (3), Pacific Wide Builders Inc. (3), Ad Art Electronic Sign Corporation (2), City Signs (2), Zebra Awning Co Inc (2), Endeavor Wireless Construction Inc, J W Rigney Construction Inc, Jfc Construction Inc., Pyro-Comm Systems, Inc., Royal Presidio Construction, Station 1 Fire Protection, Tom Lee Roofing Inc., Young Electric Co
- Architects
- Kenneth Park (6), Stephen Fortwangler (4), Cortland Morgan (2), David Sun (2)
- Engineers
- David Sun (2), Jacob Proctor, James R. Spore, Southwest Sign Co.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.