David Sun
- License
- C19374
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C19374 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Tag Front Arch
- On San Francisco permits
- Oct 2011 to Mar 2018
5 permits since 2000 (architect on 3 permits, engineer on 2 permits): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dickinson Cameron Construction Company I (4), Concept Builders And Construction Inc
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 21, 2018 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | interior ti for (n) retail store. exterior under separate permitDetails
interior ti for (n) retail store. exterior under separate permit | $60,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | erect electric, single-faced, indirect (n) sign.Details
erect electric, single-faced, indirect (n) sign. | $1,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | interior ti to include construction of (e) ground level retail store. exterior work to include (n) storefront, signage & exterior cladding. signs & interior work under separate permitDetails
interior ti to include construction of (e) ground level retail store. exterior work to include (n) storefront, signage & exterior cladding. signs & interior work under separate permit | $20,000 |
| Sep 20, 2017 | Completed final sign-off Jul 2019 | 101 Geary St | Dickinson Cameron Construction Company I | erect electric, double-faced, indirect, (n) signDetails
erect electric, double-faced, indirect, (n) sign | $500 |
| Oct 19, 2011 | Completed final sign-off Apr 2012 | 135 04th St | Concept Builders And Construction Inc | space fc-6 - "fire wood cafe" - new drywall partitions, ceiling, lighting , flooring, finishes, new kitchen equipment. sprinklers and fire alarm under separate permitDetails
space fc-6 - "fire wood cafe" - new drywall partitions, ceiling, lighting , flooring, finishes, new kitchen equipment. sprinklers and fire alarm under separate permit | $125,000 |