Teel Construction Inc.
- Based in
- Great Falls
- On San Francisco permits
- Aug 2007 to Jul 2018
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 100 Church St | demo of (e) non-structural partitions, finishes and fixtures. ti pa under 2018-0524-9985. soft demo only. all life/safety systems to remain intact. ada deferred under ab-017.Details
demo of (e) non-structural partitions, finishes and fixtures. ti pa under 2018-0524-9985. soft demo only. all life/safety systems to remain intact. ada deferred under ab-017. | $15,000 |
| May 24, 2018 | Completed final sign-off Jan 2019 | 100 Church St | tenant improvement of existing ground level space to include non-structural partitions, doors, fixtures, finishes, electrical, mechanical, plumbing. change of use from mercantile to gymnasium yoga exercise use. reference to conditional use #2017-014466cuaDetails
tenant improvement of existing ground level space to include non-structural partitions, doors, fixtures, finishes, electrical, mechanical, plumbing. change of use from mercantile to gymnasium yoga exercise use. reference to conditional use #2017-014466cua | $520,000 |
| Sep 21, 2012 | Never finaled issued Oct 2012, no final | 101 Geary St | t.i for existing swatch retail store. relocate furniture, relocate electrical outlets & fixtures. new finishes, minor changes to partitions and doors.Details
t.i for existing swatch retail store. relocate furniture, relocate electrical outlets & fixtures. new finishes, minor changes to partitions and doors. | $40,000 |
| May 4, 2011 | Completed final sign-off Jun 2011 | 101 Geary St | to correct type of construction on pa#201009020104 from 2a to 3b (for documentation purpose only).Details
to correct type of construction on pa#201009020104 from 2a to 3b (for documentation purpose only). | |
| Mar 2, 2011 | Completed final sign-off Jun 2011 | 101 Geary St | swatch +. install two illuminated channel letters wall sign.Details
swatch +. install two illuminated channel letters wall sign. | $10,000 |
| Sep 2, 2010 | Never finaled issued Apr 2011, no final | 101 Geary St | interior ti of existing retail spaceDetails
interior ti of existing retail space | $65,000 |
| Aug 23, 2007 | Completed final sign-off Sep 2007 | 50 01st St | t/i consisting of remodel of an (e) 6 story building to reconfigure (e) office spaces including the following: demo of approx. 39 l.f. of non-load bearing partitions, construction of approx. 70 l.f. of non-load bearing partitions, rearranging of (e) mech & elect. to accommodate new space.Details
t/i consisting of remodel of an (e) 6 story building to reconfigure (e) office spaces including the following: demo of approx. 39 l.f. of non-load bearing partitions, construction of approx. 70 l.f. of non-load bearing partitions, rearranging of (e) mech & elect. to accommodate new space. | $20,000 |