Block 0294, lot 008
240 Post St
- City’s use
- Commercial Retail
- Built
- 1909
- Stories
- 4
- Units
- 2
- Rooms
- 12 bathrooms
- Building
- 32,187 sq ft
- Lot
- 8,498 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
72 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2026 | In progress issued May 2026 | 240 Post St | C C I Commercial Construction & Improv | revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demoDetails
revision 202602105669: per inspector direction to correctly capture filed condition: stair access doors @ bsmt, 3rd fl e) conditions, as well as boh restrooms/ office for basement demolition, mech room for 1st/f demo, door for 3rd/f demo | |
| Feb 10, 2026 | Completed final sign-off May 2026 | 240 Post St | C C I Commercial Construction & Improv | demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors.Details
demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors. | $250,000 |
| Dec 20, 2022 | Completed final sign-off Apr 2023 | 236 Post St | Golden Gate Sign Company Inc. | sign a: new electrical wall signle faced "ferragamo"Details
sign a: new electrical wall signle faced "ferragamo" | $5,000 |
| Dec 20, 2022 | Completed final sign-off Apr 2023 | 236 Post St | Golden Gate Sign Company Inc. | sing b: electrical wall signle faced "ferragamo"Details
sing b: electrical wall signle faced "ferragamo" | $5,000 |
| Dec 20, 2022 | Completed final sign-off Apr 2023 | 236 Post St | Golden Gate Sign Company Inc. | sign c: replacement non-electric projecting double-faced sign "ferragamo".Details
sign c: replacement non-electric projecting double-faced sign "ferragamo". | $3,000 |
| Sep 19, 2022 | Completed final sign-off Nov 2022 | 236 Post St | R L H Fire Protection Inc | voluntary elevator modernization: remove sprinklers from top and pit per sffd letter 08/26/2022. no other work to system.Details
voluntary elevator modernization: remove sprinklers from top and pit per sffd letter 08/26/2022. no other work to system. | $1,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 236 Post St | Dickinson Cameron Construction Company I | remove (e) millwork damaged and replace in-kind.construction will be required. work to be in 2 phases as follows. 2/f shall be first to begin, then followed by 1/f. maher n/a.Details
remove (e) millwork damaged and replace in-kind.construction will be required. work to be in 2 phases as follows. 2/f shall be first to begin, then followed by 1/f. maher n/a. | $50,000 |
| Feb 2, 2021 | Completed final sign-off Jun 2021 | 236 Post St | Dickinson Cameron Construction Company I | g/f: install (n) manually operated rolling secruity grill at interior of main entrance to protect storefront. no work in prow. no exterior work. maher n/a.Details
g/f: install (n) manually operated rolling secruity grill at interior of main entrance to protect storefront. no work in prow. no exterior work. maher n/a. | $25,000 |
| May 27, 2014 | Never finaled issued Aug 2014, no final | 240 Post St | Instant Neon | to erect non electric, projecting, double faced sign. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect non electric, projecting, double faced sign. ** maher: compliance with ordinance no# 155-13 not required ** | $800 |
| Nov 1, 2013 | Completed final sign-off Feb 2014 | 230 Post St | Johnson Controls Security Solutions Llc | fire alarm system upgrade due to tenant improvementDetails
fire alarm system upgrade due to tenant improvement | $80,000 |
| Oct 28, 2013 | Completed final sign-off Apr 2014 | 236 Post St | Alain Hirsch Construction Corp | revision to app#201307303108. scope is to call out different steel sizes. revisions relate to original t.i. app#201305106665Details
revision to app#201307303108. scope is to call out different steel sizes. revisions relate to original t.i. app#201305106665 | $4,000 |
| Sep 17, 2013 | Completed final sign-off Apr 2014 | 230 Post St | Durkin Signs & Graphics Inc | erect an non electric double faced non illuminated new sign (banner)Details
erect an non electric double faced non illuminated new sign (banner) | $5,000 |
| Sep 17, 2013 | Completed final sign-off Apr 2014 | 230 Post St | Durkin Signs & Graphics Inc | erect a electric wall single faced indirect new signDetails
erect a electric wall single faced indirect new sign | $10,000 |
| Sep 17, 2013 | Completed final sign-off Apr 2014 | 230 Post St | Durkin Signs & Graphics Inc | erect a electric wall single faced indirect new signDetails
erect a electric wall single faced indirect new sign | $10,000 |
| Jul 30, 2013 | Completed final sign-off Apr 2014 | 236 Post St | Alain Hirsch Construction Corp | structural revision for 201305106665Details
structural revision for 201305106665 | $60,000 |
| Jul 9, 2013 | Completed final sign-off Feb 2014 | 230 Post St | Cosco Fire Protection Inc. | basement/1st/2nd floors-relocation of fire sprinklers due to new ceiling & wall configurations. t.i. pa #2013.0510.6665Details
basement/1st/2nd floors-relocation of fire sprinklers due to new ceiling & wall configurations. t.i. pa #2013.0510.6665 | $15,000 |
| Jun 26, 2013 | Completed final sign-off Apr 2014 | 230 Post St | Alain Hirsch Construction Corp | 2'vert limestone(infinito stone)clad 2 sides facade adjacent to neutral columns of base bldg(display frames).2'wide stone horizontal signage band span entire storefrt at 2nd level(limestone)w/a pin mounted illuminated logo.storefrt displayuse glazing aka starphire glass polished stainless steel.Details
2'vert limestone(infinito stone)clad 2 sides facade adjacent to neutral columns of base bldg(display frames).2'wide stone horizontal signage band span entire storefrt at 2nd level(limestone)w/a pin mounted illuminated logo.storefrt displayuse glazing aka starphire glass polished stainless steel. | $80,000 |
| Jun 12, 2013 | Completed final sign-off Apr 2014 | 236 Post St | Alain Hirsch Construction Corp | shelving work only for retail store approved under pa# 2013-0510-6665 (not issued). no other workDetails
shelving work only for retail store approved under pa# 2013-0510-6665 (not issued). no other work | $46,000 |
| Jun 10, 2013 | Completed final sign-off Apr 2014 | 236 Post St | Alain Hirsch Construction Corp | m.e.p. permit associated with ti under pa# 2013-0510-6665-for a new retail store in the basement, 1st & 2nd floors. fire protection under seperate permit.Details
m.e.p. permit associated with ti under pa# 2013-0510-6665-for a new retail store in the basement, 1st & 2nd floors. fire protection under seperate permit. | $150,000 |
| Jun 10, 2013 | Never finaled issued Jun 2013, no final | 240 Post St | Fisher Development Inc | basement level-revision to pa# 2012-0111-2085/r1-remove 2 (e) doors & re-install 1 new door & hardwareDetails
basement level-revision to pa# 2012-0111-2085/r1-remove 2 (e) doors & re-install 1 new door & hardware | $10,000 |
| Jun 3, 2013 | Completed final sign-off Apr 2014 | 236 Post St | M C Construction Management Corp. | barricade for (e) retail store work, demo under seperate permitDetails
barricade for (e) retail store work, demo under seperate permit | $2,500 |
| May 10, 2013 | Completed final sign-off Apr 2014 | 236 Post St | Alain Hirsch Construction Corp | t.i. for retail store on ground floor, basement & 2nd floor. no exterior work, mep & fire protection under separate permit. demo permit #2013.0423.5237 must be issued prior to this permit.Details
t.i. for retail store on ground floor, basement & 2nd floor. no exterior work, mep & fire protection under separate permit. demo permit #2013.0423.5237 must be issued prior to this permit. | $1,500,000 |
| May 9, 2013 | Completed final sign-off Aug 2013 | 240 Post St | Johnson Controls Security Solutions Llc | revision to appl #2012.11.15.4354 - adding 17 smoke detectors only to provide full area coverage to shut down air handlers per mechanical engineer letter. mecahnical plans 201302130182.Details
revision to appl #2012.11.15.4354 - adding 17 smoke detectors only to provide full area coverage to shut down air handlers per mechanical engineer letter. mecahnical plans 201302130182. | $14,000 |
| May 3, 2013 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | revision to pa 201207265879. new door power assisted entry door in lieu of level landing per ab-012Details
revision to pa 201207265879. new door power assisted entry door in lieu of level landing per ab-012 | $5,000 |
| Apr 23, 2013 | Completed final sign-off May 2014 | 236 Post St | M C Construction Management Corp. | demolition of (e) retail establishment for new t.i retail. space is vacant & to remain vacant pending t.i. full accessability to be shown under t.i permitDetails
demolition of (e) retail establishment for new t.i retail. space is vacant & to remain vacant pending t.i. full accessability to be shown under t.i permit | $40,000 |
| Feb 22, 2013 | Completed final sign-off Mar 2013 | 240 Post St | Ayoob & Peery Plumbing Co Inc | basement thru 3rd floor - as built fire sprinklers to ref pa #2012.1030.3107 - delete sprinklers heads under escalator platform, not install in field.Details
basement thru 3rd floor - as built fire sprinklers to ref pa #2012.1030.3107 - delete sprinklers heads under escalator platform, not install in field. | |
| Feb 13, 2013 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | m.e.p work only for tenant improvement pa# 2012-0726-5879. revisions to approved m.e.p onlyDetails
m.e.p work only for tenant improvement pa# 2012-0726-5879. revisions to approved m.e.p only | $15,000 |
| Jan 24, 2013 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | shelving only - pipp rivet style steel storage rack on basement, 2nd and 3rd flDetails
shelving only - pipp rivet style steel storage rack on basement, 2nd and 3rd fl | $35,000 |
| Jan 22, 2013 | Completed final sign-off Jul 2013 | 240 Post St | Fisher Development Inc | revision to app#201207265879. work includes new managers office on 3rd floor, change in guard rail at escalator, new full height glass at mezzanine, relocation of water fountain other minor changes.Details
revision to app#201207265879. work includes new managers office on 3rd floor, change in guard rail at escalator, new full height glass at mezzanine, relocation of water fountain other minor changes. | $50,000 |
| Jan 17, 2013 | Completed final sign-off Mar 2013 | 240 Post St | Fisher Development Inc | installation of voluntary improvement to 1st & 2nd floors including installation of (n) strong backs & improvement of (e) moment frame connections. no change to (e) shell.Details
installation of voluntary improvement to 1st & 2nd floors including installation of (n) strong backs & improvement of (e) moment frame connections. no change to (e) shell. | $30,000 |
| Jan 15, 2013 | Expired or cancelled cancelled Jan 2026 | 240 Post St | replace extg windows on 2nd and 3rd floors with new insulated glazing. no change to extg openings or frames.Details
replace extg windows on 2nd and 3rd floors with new insulated glazing. no change to extg openings or frames. | $36,000 | |
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 240 Post St | streetspaceDetails
streetspace | ||
| Jan 3, 2013 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | revision to pa#2012-0726-5879. shelving work only.Details
revision to pa#2012-0726-5879. shelving work only. | $5,000 |
| Nov 15, 2012 | Completed final sign-off Jul 2013 | 240 Post St | Johnson Controls Security Solutions Llc | installation of sub fire alarm panel (includes new devices) & new tenant space. t.i. pa# 201207265879Details
installation of sub fire alarm panel (includes new devices) & new tenant space. t.i. pa# 201207265879 | $33,398 |
| Oct 30, 2012 | Completed final sign-off Mar 2013 | 240 Post St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per t.i. 3rd floor. 4 add, 83 relocate. basement: 3 add, 38 relocate. 1st fl: 8 add, 28 relocate, mezz: 3 add, 43 relocate, 2nd fl: 14 add, 75 relocate.Details
add & relocate fire sprinkler heads per t.i. 3rd floor. 4 add, 83 relocate. basement: 3 add, 38 relocate. 1st fl: 8 add, 28 relocate, mezz: 3 add, 43 relocate, 2nd fl: 14 add, 75 relocate. | $146,000 |
| Oct 10, 2012 | Expired or cancelled cancelled Sep 2023 | 240 Post St | C B F Inc | provide new fire alarm devices for the newly cnfigured shell space located at 240 post street. the new devices consists of the following:5 pull statiion, 7 horn strobes, 5 control relay for fsd control and 5 smoke detectors. all devices shall be added on to extg fire alarm system. t.i. 201207265879Details
provide new fire alarm devices for the newly cnfigured shell space located at 240 post street. the new devices consists of the following:5 pull statiion, 7 horn strobes, 5 control relay for fsd control and 5 smoke detectors. all devices shall be added on to extg fire alarm system. t.i. 201207265879 | $5,000 |
| Sep 20, 2012 | Completed final sign-off Oct 2013 | 240 Post St | Fisher Development Inc | revision to pa# 201201112085. page s2.1 and s4.5.Details
revision to pa# 201201112085. page s2.1 and s4.5. | |
| Aug 31, 2012 | Completed final sign-off Dec 2013 | 240 Post St | revision to approved pa# 201201112085/r1. new scope of work is to install additional voluntary structural improvements in addition to those previously approved. the added improvements include (n) strapping at 4th floor, strong backs along east side prop line wall and strong backs along facade wall.Details
revision to approved pa# 201201112085/r1. new scope of work is to install additional voluntary structural improvements in addition to those previously approved. the added improvements include (n) strapping at 4th floor, strong backs along east side prop line wall and strong backs along facade wall. | $30,000 | |
| Aug 9, 2012 | Expired or cancelled cancelled Jan 2026 | 240 Post St | Fisher Development Inc | modify sidewalk and curb on cmapton for exit door on 201201112085, r-1Details
modify sidewalk and curb on cmapton for exit door on 201201112085, r-1 | |
| Aug 8, 2012 | Completed final sign-off Nov 2013 | 240 Post St | Carter Brothers Fire & Life Safety | remove existing fire alarm devices form the existing shell. provide new duct smoke detectors & relays for newly installed fire smoke dampers. add new manual pull stations & notification appliances for the shell space. (ti #2012.07.26.5879 under review)Details
remove existing fire alarm devices form the existing shell. provide new duct smoke detectors & relays for newly installed fire smoke dampers. add new manual pull stations & notification appliances for the shell space. (ti #2012.07.26.5879 under review) | $21,322 |
| Jul 26, 2012 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | interior t.i for retail store on all levels-work includes new partitions, fixtures, new bathrooms, new m.e.p. interior work only. storefront under seperate permit-pa# 2012-0706-4262. signage & fire protection under seperate permitsDetails
interior t.i for retail store on all levels-work includes new partitions, fixtures, new bathrooms, new m.e.p. interior work only. storefront under seperate permit-pa# 2012-0706-4262. signage & fire protection under seperate permits | $4,200,000 |
| Jul 26, 2012 | Completed final sign-off Aug 2012 | 240 Post St | G P Fire Protection | fire sprinklers tenant improvement core on existing - underground and riser. entire building. relocating dry standpipe.Details
fire sprinklers tenant improvement core on existing - underground and riser. entire building. relocating dry standpipe. | $108,000 |
| Jul 20, 2012 | Expired or cancelled cancelled Jun 2013 | 240 Post St | erect non electric, projecting, double face signDetails
erect non electric, projecting, double face sign | $3,000 | |
| Jul 20, 2012 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | two window vinyl graphic non structural signs @ first floor. non-electric, single-faced, non-illuminated, new sign.Details
two window vinyl graphic non structural signs @ first floor. non-electric, single-faced, non-illuminated, new sign. | $500 |
| Jul 20, 2012 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $5,000 |
| Jul 20, 2012 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | erect electric, wall, single-faced, indirect, new sign.Details
erect electric, wall, single-faced, indirect, new sign. | $3,000 |
| Jul 6, 2012 | Completed final sign-off Jul 2013 | 240 Post St | Tri-North Builders Inc | facade alteration on ground floor only. signage under separate permit.Details
facade alteration on ground floor only. signage under separate permit. | $90,000 |
| Jan 13, 2012 | Completed final sign-off Apr 2012 | 240 Post St | Fisher Development Inc | interior selective demo only to include removal of partitions,partial floor areas & related structure & all finishes down to rated partition or structure. existing vacant shell & exterior to remain as is (no change).Details
interior selective demo only to include removal of partitions,partial floor areas & related structure & all finishes down to rated partition or structure. existing vacant shell & exterior to remain as is (no change). | $175,000 |
| Jan 11, 2012 | Completed final sign-off Oct 2013 | 240 Post St | Fisher Development Inc | install (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit.Details
install (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit. | $850,000 |
| Sep 23, 2009 | Never finaled issued Sep 2009, no final | 240 Post St | street space permitDetails
street space permit | ||
| Sep 1, 2009 | Never finaled issued Sep 2009, no final | 240 Post St | Johnston Sign Company | erect a electric, single faced wall sign.Details
erect a electric, single faced wall sign. | $2,500 |
| Jul 16, 2009 | Never finaled issued Jul 2009, no final | 240 Post St | street space permitDetails
street space permit | ||
| Jun 2, 2009 | Never finaled issued Jul 2009, no final | 240 Post St | Gray West Construction Inc | new paint finishes,patch fl.to match (e).partition walls, as-built currently demo.remove fixt,cabinets, install new. mirror,surface-mtd. standards. ft rm, doors & hardware.new power & data for cahs registers,phones,sign system at entry.storefront signage under sep/permiDetails
new paint finishes,patch fl.to match (e).partition walls, as-built currently demo.remove fixt,cabinets, install new. mirror,surface-mtd. standards. ft rm, doors & hardware.new power & data for cahs registers,phones,sign system at entry.storefront signage under sep/permi | $270,000 |
| Sep 23, 2008 | Never finaled issued Sep 2008, no final | 228 Post St | interior soft demo on 4 floors and basement in advance of t.i. no structural work, no work on facade. ab-017Details
interior soft demo on 4 floors and basement in advance of t.i. no structural work, no work on facade. ab-017 | $20,000 | |
| Aug 15, 2002 | Completed final sign-off Sep 2003 | 230 Post St | revision to 200203292708 for mechanical revisionDetails
revision to 200203292708 for mechanical revision | $10,000 | |
| Jul 1, 2002 | Expired or cancelled expired Jan 2004 | 240 Post St | addition of horn/strobes and pull station to exist fire alarm system, necessary for ti project all fDetails
addition of horn/strobes and pull station to exist fire alarm system, necessary for ti project all f | $8,000 | |
| Jun 27, 2002 | Completed final sign-off Aug 2003 | 230 Post St | Allied Fire Protection | 1/fl- as built of fire sprinkler system for appl#200205247462Details
1/fl- as built of fire sprinkler system for appl#200205247462 | |
| Jun 11, 2002 | Completed final sign-off Sep 2003 | 230 Post St | addition of 45 devices to existing fire alarm systemDetails
addition of 45 devices to existing fire alarm system | $6,000 | |
| May 24, 2002 | Completed final sign-off Sep 2003 | 230 Post St | Allied Fire Protection | add & relocate pendent spkr. per new ceilings & wall. tenant improvent on 1st flrDetails
add & relocate pendent spkr. per new ceilings & wall. tenant improvent on 1st flr | $7,900 |
| May 3, 2002 | Never finaled issued May 2002, no final | 230 Post St | street space permitDetails
street space permit | ||
| Mar 29, 2002 | Completed final sign-off Sep 2003 | 230 Post St | renovation of extg stor retail/dim non bearing partition/install new h.c. bthrm/install new prt walDetails
renovation of extg stor retail/dim non bearing partition/install new h.c. bthrm/install new prt wal | $700,300 | |
| Mar 29, 2002 | Completed final sign-off Sep 2003 | 230 Post St | store front changes.Details
store front changes. | $30,000 | |
| Jan 30, 2002 | Completed final sign-off Jul 2002 | 230 Post St | Hathaway Dinwiddie Co. | soft demolition, drywall partitions, ceiling & carpet @ g/fl. & basement levelDetails
soft demolition, drywall partitions, ceiling & carpet @ g/fl. & basement level | $16,000 |
| Jan 3, 2001 | Expired or cancelled expired May 2001 | 240 Post St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Apr 17, 2000 | Expired or cancelled expired Oct 2000 | 236 Post St | Edwards Systems Technology Inc/Est Servi | fire alarm t.i. floors affected basement 1st & 2nd floorsDetails
fire alarm t.i. floors affected basement 1st & 2nd floors | $6,243 |
| Apr 12, 2000 | Expired or cancelled expired Oct 2000 | 236 Post St | Cps Signs | to erect electrical signDetails
to erect electrical sign | $1,000 |
| Apr 6, 2000 | Expired or cancelled expired Aug 2000 | 236 Post St | electrical distribution basement 1st & 2nd floorsDetails
electrical distribution basement 1st & 2nd floors | $5,000 | |
| Mar 16, 2000 | Completed final sign-off Feb 2001 | 236 Post St | construction of a 36 sq, ft entrance awningDetails
construction of a 36 sq, ft entrance awning | $3,000 | |
| Mar 7, 2000 | Expired or cancelled expired Mar 2001 | 236 Post St | new stair from basement to ground floor upgrade restroom, new storefrontDetails
new stair from basement to ground floor upgrade restroom, new storefront | ||
| Feb 24, 2000 | Expired or cancelled expired Aug 2000 | 236 Post St | relocate main into soffitt. raise 4 doors , add 5 heads under new soffittsDetails
relocate main into soffitt. raise 4 doors , add 5 heads under new soffitts | $5,290 | |
| Feb 1, 2000 | Expired or cancelled expired Jun 2000 | 236 Post St | street spaceDetails
street space | ||
| Jan 28, 2000 | Expired or cancelled expired Jul 2000 | 236 Post St | interior demo of ground & second floors no structural demoDetails
interior demo of ground & second floors no structural demo |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Tri-North Builders Inc (9), Fisher Development Inc (7), Alain Hirsch Construction Corp (6), Durkin Signs & Graphics Inc (3), Golden Gate Sign Company Inc. (3), Johnson Controls Security Solutions Llc (3), Allied Fire Protection (2), Ayoob & Peery Plumbing Co Inc (2), C C I Commercial Construction & Improv (2), Dickinson Cameron Construction Company I (2), M C Construction Management Corp. (2), C B F Inc, Carter Brothers Fire & Life Safety, Cosco Fire Protection Inc., Cps Signs, Edwards Systems Technology Inc/Est Servi, G P Fire Protection, Gray West Construction Inc, Hathaway Dinwiddie Co., Instant Neon, Johnston Sign Company, R L H Fire Protection Inc
- Architects
- Mary Mcmains (6), James Zak (3), Ashok Kumar (2), Kenneth Park (2), Ashok Vanmali
- Engineers
- Rolf Armstrong
- Authorized agent-otherss
- Abron Yates, Jr., Kelly Bogenschutz, Ronald Gordines
- Designers
- R L H Fire Protection Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.