Block 3751, lot 105
765 Folsom St
- City’s use
- Commercial Office
- Built
- 1979
- Stories
- 6
- Lot
- 30,000 sq ft
- Zoning
- M1
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
112 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 26, 2026 | Completed final sign-off Apr 2026 | 795 Folsom St | Anderson, Rowe & Buckley, Inc. | as built for 202511199933. sprinklers plugged 9, upright relocated 4, added pendent 60, relocated extend cov 4. total 81Details
as built for 202511199933. sprinklers plugged 9, upright relocated 4, added pendent 60, relocated extend cov 4. total 81 | |
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 795 Folsom St | M C S Construction Services | deferred mechanical and electrical for pa #2025-0821-3678. mech: provide new vav boxes, water source heat pumps, diffusers & associated low side duct work to serve new zones. provide exhaust fan & associated ductwork for new restrooms. electrical: light fixtures & associated circuiting controls.Details
deferred mechanical and electrical for pa #2025-0821-3678. mech: provide new vav boxes, water source heat pumps, diffusers & associated low side duct work to serve new zones. provide exhaust fan & associated ductwork for new restrooms. electrical: light fixtures & associated circuiting controls. | $750,000 |
| Nov 20, 2025 | In progress issued Dec 2025 | 795 Folsom St | Tri-Signal Integration Inc. | remove existing and install new smoke detector, speaker strobes and strobes djue to t.i. on 1st flr. ref# 202508213678Details
remove existing and install new smoke detector, speaker strobes and strobes djue to t.i. on 1st flr. ref# 202508213678 | $25,500 |
| Nov 19, 2025 | In progress issued Nov 2025 | 795 Folsom St | Anderson, Rowe & Buckley, Inc. | 1st floor: fir sprinkler t.i. relocates 68 and adds 11 total=79Details
1st floor: fir sprinkler t.i. relocates 68 and adds 11 total=79 | $40,685 |
| Oct 16, 2025 | Completed final sign-off Apr 2026 | 795 Folsom St | M C S Construction Services | demolition of non structural elements including building entry exit storefront systems. instal new store front entry systems in 2 locations no site, landscape, use or parking changes proposed.Details
demolition of non structural elements including building entry exit storefront systems. instal new store front entry systems in 2 locations no site, landscape, use or parking changes proposed. | $100,000 |
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 795 Folsom St | M C S Construction Services | level 1, interior demolition of non-structural elements including partitions, doors, finishes, ceilings, lighting. demising grand floor lobby, construction of fitness center. conference room and lounge include path of travel and restroom upgrades. mep. life safety and sprinkler under separate permitDetails
level 1, interior demolition of non-structural elements including partitions, doors, finishes, ceilings, lighting. demising grand floor lobby, construction of fitness center. conference room and lounge include path of travel and restroom upgrades. mep. life safety and sprinkler under separate permit | $1,000,000 |
| Apr 1, 2025 | In progress filed Apr 2025, not yet issued | 795 Folsom St | path of travel upgrades to current code compliance and to comply with abe ordinance. includes new parking striping modification, van accessible stall relocation and signage upgrades. abe 201904105680Details
path of travel upgrades to current code compliance and to comply with abe ordinance. includes new parking striping modification, van accessible stall relocation and signage upgrades. abe 201904105680 | $6,000 | |
| Apr 7, 2022 | Completed final sign-off Apr 2022 | 795 Folsom St | Gci, Inc | 1/f: demo only, non-structural. removal of existing partitions, doors, flooring and ceilings.Details
1/f: demo only, non-structural. removal of existing partitions, doors, flooring and ceilings. | $10,000 |
| Mar 1, 2022 | Completed final sign-off Apr 2022 | 795 Folsom St | Tri-Signal Integration Inc. | 1st fl: partial removal of (e) notification appliances & detection devices on ground level (1st fl) due to remodel. additional devices will be added during future t.i..Details
1st fl: partial removal of (e) notification appliances & detection devices on ground level (1st fl) due to remodel. additional devices will be added during future t.i.. | $11,960 |
| Jan 27, 2022 | Completed final sign-off Feb 2022 | 795 Folsom St | Pioneer Fire Inc. | suite 100: add 4 sprinkler heads. convert 35 sprinkler heads to upright. remove 10 pendent sprinkler heads. ref gcti 202106172675Details
suite 100: add 4 sprinkler heads. convert 35 sprinkler heads to upright. remove 10 pendent sprinkler heads. ref gcti 202106172675 | $22,000 |
| Jan 27, 2022 | Never finaled issued Feb 2022, no final | 795 Folsom St | Tri-Signal Integration Inc. | to replace the (e) fire alarm control unit and voice amplifier as shown on drawings. the balance of the system will remain as is.Details
to replace the (e) fire alarm control unit and voice amplifier as shown on drawings. the balance of the system will remain as is. | $75,000 |
| Jul 15, 2021 | Completed final sign-off Feb 2022 | 795 Folsom St | Gci, Inc | 3rd fl: mechanical - demo grilles & ductwork in open office. install new ductwork & grilles. rebalance vavs & grilles. ref pa# 202106172675Details
3rd fl: mechanical - demo grilles & ductwork in open office. install new ductwork & grilles. rebalance vavs & grilles. ref pa# 202106172675 | |
| Jul 13, 2021 | Completed final sign-off Feb 2022 | 795 Folsom St | Gci, Inc | new electrical, power and lighting ref 202106172675Details
new electrical, power and lighting ref 202106172675 | |
| Jun 17, 2021 | Completed final sign-off Feb 2022 | 795 Folsom St | Gci, Inc | 3rd fl: ti - slective interior demo, removal of existing partitions, doors & existing partitions, doors, ceiling. restroom renovations. ref pa 2016-0830-6376Details
3rd fl: ti - slective interior demo, removal of existing partitions, doors & existing partitions, doors, ceiling. restroom renovations. ref pa 2016-0830-6376 | $400,000 |
| Jun 15, 2021 | Completed final sign-off Feb 2022 | 795 Folsom St | Pioneer Fire Inc. | return to shell condition with upright sprinklersDetails
return to shell condition with upright sprinklers | $22,942 |
| May 17, 2019 | Completed final sign-off May 2019 | 795 Folsom St | Gci, Inc | roof deck: remove handrails, added planters, ref 201608306376, maher naDetails
roof deck: remove handrails, added planters, ref 201608306376, maher na | |
| Aug 3, 2018 | Completed final sign-off Apr 2021 | 795 Folsom St | Gci, Inc | mechanical - new vav box electrical - relocate power & data, new power and data, new lighting & controls.Details
mechanical - new vav box electrical - relocate power & data, new power and data, new lighting & controls. | $100,000 |
| Jul 31, 2018 | Completed final sign-off Aug 2018 | 795 Folsom St | Pioneer Fire Inc. | relocate 11 pendent fire sprinklersDetails
relocate 11 pendent fire sprinklers | $7,000 |
| Jul 18, 2018 | Completed final sign-off Apr 2021 | 795 Folsom St | Gci, Inc | demolition removal of existing partitions, doors, flooring & ceilings. construction of non structural parititons, new doors & finishes. n/a for maher.Details
demolition removal of existing partitions, doors, flooring & ceilings. construction of non structural parititons, new doors & finishes. n/a for maher. | $400,000 |
| Jun 19, 2018 | Expired or cancelled cancelled Oct 2019 | 795 Folsom St | Pioneer Fire Inc. | ref pa# 201805189481; return shell condition with upright sprinklersDetails
ref pa# 201805189481; return shell condition with upright sprinklers | $22,942 |
| May 18, 2018 | Completed final sign-off Oct 2018 | 795 Folsom St | Gci, Inc | 6/f: demolition and removal of exiting partitions, doors, flooring, per ab-017Details
6/f: demolition and removal of exiting partitions, doors, flooring, per ab-017 | $30,000 |
| May 18, 2018 | Expired or cancelled cancelled Sep 2019 | 795 Folsom St | Gci, Inc | 3/f: demolition for tenant improvement - existing partitions doors, floors & ceilings per ab-017. sprinkler permit 201806192196Details
3/f: demolition for tenant improvement - existing partitions doors, floors & ceilings per ab-017. sprinkler permit 201806192196 | $30,000 |
| Mar 1, 2018 | Never finaled issued Mar 2018, no final | 795 Folsom St | Tri-Signal Integration Inc. | add 2 s trobes to existing fa system; relocate 2 speakers and 1 strobe. ref pa 2018-0226-2231. maher naDetails
add 2 s trobes to existing fa system; relocate 2 speakers and 1 strobe. ref pa 2018-0226-2231. maher na | $1,500 |
| Feb 26, 2018 | Completed final sign-off Apr 2018 | 795 Folsom St | Vulcan Construction Inc | 1st fl - remove existing walls & framing & relocate doorsDetails
1st fl - remove existing walls & framing & relocate doors | $35,000 |
| Aug 17, 2017 | Completed final sign-off Mar 2019 | 795 Folsom St | Pioneer Fire Inc. | roof level fire sprinkler system - 37 upright sprinklers, 1 pendent sprinkelr. pa 2016-0830-6376 and 2017-0807-4049. n/a maher ordinanceDetails
roof level fire sprinkler system - 37 upright sprinklers, 1 pendent sprinkelr. pa 2016-0830-6376 and 2017-0807-4049. n/a maher ordinance | $10,000 |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 5/f- revision to 201607122099 correction to path of travel. omit remote accessible parking space at loading dockDetails
5/f- revision to 201607122099 correction to path of travel. omit remote accessible parking space at loading dock | |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 2/f- revision to 201607122059 correction to path of travel. omit remote accessible parking spaces @ loading dockDetails
2/f- revision to 201607122059 correction to path of travel. omit remote accessible parking spaces @ loading dock | |
| Jul 25, 2017 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 4/f- revision to 201607122062 correction to path of travel, omit remote accessible parking space @ loading dock.Details
4/f- revision to 201607122062 correction to path of travel, omit remote accessible parking space @ loading dock. | |
| Jan 10, 2017 | Never finaled issued Jan 2017, no final | 795 Folsom St | Novo Construction Inc | emergency exit signage for floor plans 2,4 & 5 ref pa 2016-0712-2059, 2016-0712-2099 and 2016-0712-2062. maher naDetails
emergency exit signage for floor plans 2,4 & 5 ref pa 2016-0712-2059, 2016-0712-2099 and 2016-0712-2062. maher na | $5,000 |
| Nov 16, 2016 | Completed final sign-off Jun 2018 | 795 Folsom St | Tri-Signal Integration Inc. | 2/f- fire alarm t.i. includes: add 45 speaker strobes, 8 strobes, 1 power supply to existing fire alarm system, relocate 1 smoke detector maher not reqDetails
2/f- fire alarm t.i. includes: add 45 speaker strobes, 8 strobes, 1 power supply to existing fire alarm system, relocate 1 smoke detector maher not req | $30,000 |
| Nov 7, 2016 | Completed final sign-off Apr 2017 | 795 Folsom St | Tri-Signal Integration Inc. | 4th flr: add 1 speaker, 34 speaker/strobes, 6 strobes. replace 8 (e) smoke detectors and relocate 5(e) duct detectors maher naDetails
4th flr: add 1 speaker, 34 speaker/strobes, 6 strobes. replace 8 (e) smoke detectors and relocate 5(e) duct detectors maher na | $25,000 |
| Nov 7, 2016 | Completed final sign-off Jun 2018 | 795 Folsom St | Tri-Signal Integration Inc. | 5th flr: add 1 smoke detector, 31 speaker/strobes and 7 strobes to (e) system. replace 8 (e) smoke detectors ref 201607122099 maher naDetails
5th flr: add 1 smoke detector, 31 speaker/strobes and 7 strobes to (e) system. replace 8 (e) smoke detectors ref 201607122099 maher na | $25,000 |
| Oct 24, 2016 | Completed final sign-off Mar 2017 | 795 Folsom St | Golden Gate Sign Company Inc. | erect electric wall mounted single face sign maher naDetails
erect electric wall mounted single face sign maher na | $5,000 |
| Oct 24, 2016 | Completed final sign-off Mar 2017 | 795 Folsom St | Golden Gate Sign Company Inc. | erect electric wall mounted single face sign maher naDetails
erect electric wall mounted single face sign maher na | $5,000 |
| Oct 18, 2016 | Completed final sign-off Dec 2016 | 795 Folsom St | Golden Gate Fire Protection Inc | 2nd flr: fire sprinklers relocate 45 pendents add 7, relocate 181 uprights and add 10. remove 20 heads for quantcast; ref 201607122059; maher naDetails
2nd flr: fire sprinklers relocate 45 pendents add 7, relocate 181 uprights and add 10. remove 20 heads for quantcast; ref 201607122059; maher na | $55,890 |
| Sep 28, 2016 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 2nd floor: mechanical & electrical work for ti ref 201607122059. maher naDetails
2nd floor: mechanical & electrical work for ti ref 201607122059. maher na | $50,000 |
| Aug 31, 2016 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | mechanical and electrical work for t.i. on the 5th floor. ref app#201607122099. n/a for maherDetails
mechanical and electrical work for t.i. on the 5th floor. ref app#201607122099. n/a for maher | $250,000 |
| Aug 29, 2016 | Completed final sign-off Jun 2018 | 795 Folsom St | Golden Gate Fire Protection Inc | 4th floor full floor (except core) fire sprinkler only - relocate 34 pendent, add 3, relcoate 204 uprights; add 15 (total 256 heads) for quantcast. ref #201607122062. n/a maher ordinanceDetails
4th floor full floor (except core) fire sprinkler only - relocate 34 pendent, add 3, relcoate 204 uprights; add 15 (total 256 heads) for quantcast. ref #201607122062. n/a maher ordinance | $134,400 |
| Aug 29, 2016 | Completed final sign-off Nov 2016 | 795 Folsom St | Golden Gate Fire Protection Inc | 5th floor full floor(except core) fire sprinkler only - relocate 53 pendents, add 8, relcoate 159 uprights; add 12, remove 59 heads (total 239 heads) for quantcast. ref #201607122099. n/a maher ordinanceDetails
5th floor full floor(except core) fire sprinkler only - relocate 53 pendents, add 8, relcoate 159 uprights; add 12, remove 59 heads (total 239 heads) for quantcast. ref #201607122099. n/a maher ordinance | $125,475 |
| Jul 12, 2016 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 5th flr: ti- demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit maher naDetails
5th flr: ti- demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit maher na | $2,171,400 |
| Jul 12, 2016 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 4th flr: ti- to include demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit. maher naDetails
4th flr: ti- to include demo of non structural partitions. new partitions, doors, millwork. mep/fire/life safety under sep permit. maher na | $2,171,400 |
| Jul 12, 2016 | Completed final sign-off Nov 2017 | 795 Folsom St | Novo Construction Inc | 2nd flr: ti-constist of selective demo of non structural partitions, new non structrual partitions, doors, millwork. mep/fire/life safety under sep permit maher naDetails
2nd flr: ti-constist of selective demo of non structural partitions, new non structrual partitions, doors, millwork. mep/fire/life safety under sep permit maher na | $2,171,400 |
| Mar 2, 2015 | Completed final sign-off May 2015 | 795 Folsom St | Golden Gate Fire Protection Inc | 1st flr: fire sprinkler only, relocate 65 heads for 795 folsom st, 1 st flr for regus; maher n/aDetails
1st flr: fire sprinkler only, relocate 65 heads for 795 folsom st, 1 st flr for regus; maher n/a | $32,500 |
| Feb 23, 2015 | Completed final sign-off Sep 2015 | 795 Folsom St | Skyline Construction | ste 100 - revision to appl #2015.0107.5113: delete scope of work at hallway area 100w. n/a maher ordinanceDetails
ste 100 - revision to appl #2015.0107.5113: delete scope of work at hallway area 100w. n/a maher ordinance | |
| Jan 7, 2015 | Completed final sign-off Sep 2015 | 795 Folsom St | Skyline Construction | suite 100 - partial remodel of existing executive office suites, breakroom private offices, hallways & reception area. n/a maher ordinanceDetails
suite 100 - partial remodel of existing executive office suites, breakroom private offices, hallways & reception area. n/a maher ordinance | $110,000 |
| Apr 16, 2014 | Completed final sign-off May 2014 | 795 Folsom St | Tri-Signal Integration Inc. | 2nd floor: relocate one strobe. ref app#201312315412. n/a for the maher ordinance #155-13Details
2nd floor: relocate one strobe. ref app#201312315412. n/a for the maher ordinance #155-13 | $2,000 |
| Dec 31, 2013 | Completed final sign-off May 2014 | 795 Folsom St | Principal Builders Inc. | 2nd fl to demo existing partitions doors and finishes and construct new partitions, doors, finishes, as well as title 24 lighting. mechanical, sprinklers and life safety under separate permitDetails
2nd fl to demo existing partitions doors and finishes and construct new partitions, doors, finishes, as well as title 24 lighting. mechanical, sprinklers and life safety under separate permit | $190,000 |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 795 Folsom St | Terra Visual Inc | to erect non-electrical painted acrylic signDetails
to erect non-electrical painted acrylic sign | $3,500 |
| Jul 19, 2013 | Completed final sign-off Aug 2013 | 795 Folsom St | Peacock Construction Inc | 2nd floor-constructnew non structural non rated demising wall, re-work lighting & life safety as requiredDetails
2nd floor-constructnew non structural non rated demising wall, re-work lighting & life safety as required | $10,500 |
| Apr 12, 2013 | Completed final sign-off Jun 2013 | 795 Folsom St | West Builders Inc. | revision to appl #2012.11.09.3979 - scope is to eliminate proposed truncated domes on sidewalk on original permit. domes are not allowed by dpw & should have been crossed off in orig permit. all work was outside bldg, no actual constructoin work.Details
revision to appl #2012.11.09.3979 - scope is to eliminate proposed truncated domes on sidewalk on original permit. domes are not allowed by dpw & should have been crossed off in orig permit. all work was outside bldg, no actual constructoin work. | |
| Dec 10, 2012 | Completed final sign-off Mar 2013 | 795 Folsom St | Tri-Signal Integration Inc. | revision to pa# 2010208298473. replace one wall mounted strobe with ceiling mounted. relocate one manuel pull station.Details
revision to pa# 2010208298473. replace one wall mounted strobe with ceiling mounted. relocate one manuel pull station. | |
| Nov 9, 2012 | Completed final sign-off Jun 2013 | 795 Folsom St | West Builders Inc. | provision of new van accessible parking, including striping signage and detectable warning strips. all work outside of bldg.Details
provision of new van accessible parking, including striping signage and detectable warning strips. all work outside of bldg. | $5,000 |
| Oct 12, 2012 | Completed final sign-off Mar 2013 | 795 Folsom St | West Builders Inc. | deferred awning structural detail with calculation. revision to app#201207164945. 4'0" wide x 2'10" length x 9" depth channel framed awning.Details
deferred awning structural detail with calculation. revision to app#201207164945. 4'0" wide x 2'10" length x 9" depth channel framed awning. | |
| Aug 29, 2012 | Completed final sign-off Mar 2013 | 795 Folsom St | Tri-Signal Integration Inc. | 1st floor lobby-add 2 relay modules to interface with access control systemDetails
1st floor lobby-add 2 relay modules to interface with access control system | $1,500 |
| Aug 2, 2012 | Expired or cancelled expired Nov 2014 | 795 Folsom St | Legacy Mechanical & Energy Services, Inc | 2nd/3rd/6th floors-2nd fl-relocation of (e) air distribution grilles & stats, no new energy, 3rd fl-installation of 2-5 ton wshp in the server room, 6th fl-relocation of (e) air distribution (grilles & stats) no new energy. arch pa# 2012-0703-3972Details
2nd/3rd/6th floors-2nd fl-relocation of (e) air distribution grilles & stats, no new energy, 3rd fl-installation of 2-5 ton wshp in the server room, 6th fl-relocation of (e) air distribution (grilles & stats) no new energy. arch pa# 2012-0703-3972 | $65,000 |
| Jul 16, 2012 | Completed final sign-off Mar 2013 | 795 Folsom St | West Builders Inc. | renovation of e building lobby at gr floor. includes fixtures, finishes, channel glass attached to concrete wall, reception desk, bench. mep and fire protection under separate permitDetails
renovation of e building lobby at gr floor. includes fixtures, finishes, channel glass attached to concrete wall, reception desk, bench. mep and fire protection under separate permit | $250,000 |
| Jul 10, 2012 | Never finaled issued Jul 2012, no final | 795 Folsom St | Anderson, Rowe & Buckley, Inc. | tenant improvements to existing fire sprinkler system 2nd floor: add 2 sprinkler heads, relocate 1 sprinkler head. 6th floor: relocate 6 sprinkler headsDetails
tenant improvements to existing fire sprinkler system 2nd floor: add 2 sprinkler heads, relocate 1 sprinkler head. 6th floor: relocate 6 sprinkler heads | $4,500 |
| Jul 3, 2012 | Completed final sign-off Feb 2013 | 795 Folsom St | Principal Builders Inc. | 2nd floor-new partitions, millwork & relocated furniture. plumbing for new breakrm sink & dishwasher. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permitsDetails
2nd floor-new partitions, millwork & relocated furniture. plumbing for new breakrm sink & dishwasher. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permits | $60,000 |
| Jul 3, 2012 | Never finaled issued Aug 2012, no final | 795 Folsom St | Principal Builders Inc. | 6th floor-selective demo of non bearning walls, construction of new partitions, doors, frames. installation of new furniture, minor modifications to (e) lighting, switching. plumbing for new breakrm sink. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permitsDetails
6th floor-selective demo of non bearning walls, construction of new partitions, doors, frames. installation of new furniture, minor modifications to (e) lighting, switching. plumbing for new breakrm sink. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permits | $135,000 |
| Jul 3, 2012 | Completed final sign-off Feb 2013 | 795 Folsom St | Principal Builders Inc. | 3rd floor-selective demo of door, frame & ceiling. construction of new partitions, installation of new furniture. minor modifications to (e) lighting & switching. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permitsDetails
3rd floor-selective demo of door, frame & ceiling. construction of new partitions, installation of new furniture. minor modifications to (e) lighting & switching. any modifitions to (e) sprinkler, m.e.p & life safety system under seperate permits | $40,000 |
| Oct 18, 2010 | Completed final sign-off Dec 2010 | 795 Folsom St | Skyline Construction | revision to 201002186735 to delete card readers at doors 303 and 306. ref 201002186735Details
revision to 201002186735 to delete card readers at doors 303 and 306. ref 201002186735 | |
| Aug 13, 2010 | Completed final sign-off Nov 2011 | 795 Folsom St | Metropolitan Electrical Construction | at and t mobility proposed build new wireless facility consisting of add new cabinets to roof on new platform (7 bay cabinets) sunwest, add (12) new antennas, painted to match, add new cable tray, new coax cable and 6 new rrusDetails
at and t mobility proposed build new wireless facility consisting of add new cabinets to roof on new platform (7 bay cabinets) sunwest, add (12) new antennas, painted to match, add new cable tray, new coax cable and 6 new rrus | $125,000 |
| Jun 16, 2010 | Completed final sign-off Dec 2010 | 795 Folsom St | Skyline Construction | 3rd floor-revision to pa# 2010-0218-6735-add new card reader (10)Details
3rd floor-revision to pa# 2010-0218-6735-add new card reader (10) | $1,000 |
| Apr 21, 2010 | Completed final sign-off Dec 2010 | 795 Folsom St | Skyline Construction | revision to p.a.#201002186735 to delete new shower/restroom and reconfigure new/(e) offices.Details
revision to p.a.#201002186735 to delete new shower/restroom and reconfigure new/(e) offices. | |
| Apr 13, 2010 | Completed final sign-off Jan 2011 | 795 Folsom St | Skyline Construction | 3rd floor-mechanical & electrical work for tenant improvement, reference architectural pa# 2010-0218-6735Details
3rd floor-mechanical & electrical work for tenant improvement, reference architectural pa# 2010-0218-6735 | $100,000 |
| Apr 9, 2010 | Completed final sign-off Feb 2011 | 795 Folsom St | R L H Fire Protection Inc | ti upgrade on the e fire sprinkler system on the 3rd fl (twitter) relocate 63 pendents and add 18 uprightsDetails
ti upgrade on the e fire sprinkler system on the 3rd fl (twitter) relocate 63 pendents and add 18 uprights | $16,000 |
| Feb 18, 2010 | Completed final sign-off Dec 2010 | 795 Folsom St | Skyline Construction | 3rd floor-office t.i. select demolition of walls, ceiling. construction of new walls, shower rooms & restrooms. m.e.p, fire sprinkler under seperate permitDetails
3rd floor-office t.i. select demolition of walls, ceiling. construction of new walls, shower rooms & restrooms. m.e.p, fire sprinkler under seperate permit | $800,000 |
| Jun 19, 2009 | Completed final sign-off Dec 2009 | 795 Folsom St | Anderson, Rowe & Buckley, Inc. | 2nd floor-tenant improvement to (e) fire sprinkler system-9 new sprinklers & 7 relocated sprinklersDetails
2nd floor-tenant improvement to (e) fire sprinkler system-9 new sprinklers & 7 relocated sprinklers | $2,000 |
| Jun 19, 2009 | Completed final sign-off Feb 2010 | 795 Folsom St | Rossi Builders Inc. | demolition of (e) offices, new doors, upgrade restrooms. remove (e) finishes in corridors & restrooms. install new finishes in restrooms & tenant suite. title-24 lighting compliance under separate permit.Details
demolition of (e) offices, new doors, upgrade restrooms. remove (e) finishes in corridors & restrooms. install new finishes in restrooms & tenant suite. title-24 lighting compliance under separate permit. | $214,000 |
| Jun 5, 2009 | Completed final sign-off Dec 2009 | 795 Folsom St | Bcci Construction Company | revision to 200905198701, mechanical plan including 2 new vav boxes, new heat pump, grille, condenser water pipingDetails
revision to 200905198701, mechanical plan including 2 new vav boxes, new heat pump, grille, condenser water piping | $7,000 |
| May 19, 2009 | Completed final sign-off Dec 2009 | 795 Folsom St | Bcci Construction Company | tenant improvement on the 2nd floor including.. demise extg suite with full height wall, bldg out of confernce room, phone rooms server room and r+d lab supporting electrical and mechanical work. life safty and sprinklers under seperate permit.Details
tenant improvement on the 2nd floor including.. demise extg suite with full height wall, bldg out of confernce room, phone rooms server room and r+d lab supporting electrical and mechanical work. life safty and sprinklers under seperate permit. | $150,000 |
| Apr 20, 2009 | Completed final sign-off Aug 2009 | 795 Folsom St | Legacy Mechanical & Energy Services, Inc | 4th floors-install 2 smoke fire dampersDetails
4th floors-install 2 smoke fire dampers | $12,000 |
| Apr 9, 2009 | Completed final sign-off Jul 2009 | 795 Folsom St | Skyline Construction | renew pa# 2008/03/24/7859 to obtain final inspection. all work has been completed.Details
renew pa# 2008/03/24/7859 to obtain final inspection. all work has been completed. | |
| Apr 9, 2009 | Completed final sign-off Jul 2009 | 795 Folsom St | Skyline Construction | renew pa# 2007/12/12/0314 to obtain final inspection. all work has been completed.Details
renew pa# 2007/12/12/0314 to obtain final inspection. all work has been completed. | |
| Nov 19, 2008 | Completed final sign-off Jul 2009 | 795 Folsom St | 6th floor-minor framing & drywall work, relocate (e) door. electrical work under seperate permitDetails
6th floor-minor framing & drywall work, relocate (e) door. electrical work under seperate permit | $4,000 | |
| Jul 8, 2008 | Completed final sign-off Aug 2008 | 795 Folsom St | Tri-Signal Integration Inc. | relocate 2 strobes, add 1 smoke detector to existing fire alarem systemDetails
relocate 2 strobes, add 1 smoke detector to existing fire alarem system | $3,200 |
| Jul 1, 2008 | Completed final sign-off Aug 2008 | 795 Folsom St | Bcci Construction Company | 2nd floor-mechanical work associated with pa# 2008-0623-5090 to include installation of new heat pump and title 24; reference pa# 2008-0623-5090Details
2nd floor-mechanical work associated with pa# 2008-0623-5090 to include installation of new heat pump and title 24; reference pa# 2008-0623-5090 | $8,000 |
| Jun 23, 2008 | Completed final sign-off Aug 2008 | 795 Folsom St | 2nd fl: build out of it lab. divide lunch room into bike storage and copy/coffee. mep separate permit.Details
2nd fl: build out of it lab. divide lunch room into bike storage and copy/coffee. mep separate permit. | $29,000 | |
| Apr 9, 2008 | Expired or cancelled cancelled Jan 2026 | 795 Folsom St | revision to application 200712200988, to provide reserved accessible seats.Details
revision to application 200712200988, to provide reserved accessible seats. | ||
| Mar 31, 2008 | Completed final sign-off Jul 2009 | 795 Folsom St | Skyline Construction | mechanical work on 6th floor. 20 new life diffusers, (12) supply taps, (9) supply grilles, (19) thermostat relocates, (5) supply grilles relocates. reference to 220712200988.Details
mechanical work on 6th floor. 20 new life diffusers, (12) supply taps, (9) supply grilles, (19) thermostat relocates, (5) supply grilles relocates. reference to 220712200988. | $55,000 |
| Mar 24, 2008 | Expired or cancelled expired Jul 2009 | 795 Folsom St | Ayoob & Peery Plumbing Co Inc | add fire sprinkler heads at floating ceiling, existing uprights to remain. total 29 heads.Details
add fire sprinkler heads at floating ceiling, existing uprights to remain. total 29 heads. | $5,500 |
| Feb 1, 2008 | Completed final sign-off Mar 2010 | 795 Folsom St | Anderson, Rowe & Buckley, Inc. | garage level - adding two additional exhaust fans to existing building garage exhaust system.Details
garage level - adding two additional exhaust fans to existing building garage exhaust system. | $190,000 |
| Feb 1, 2008 | Completed final sign-off Mar 2010 | 795 Folsom St | Anderson, Rowe & Buckley, Inc. | demo six exhaust fans & installing three new exhaust fans for the building pressurization system. work to be done at roof penthouse.Details
demo six exhaust fans & installing three new exhaust fans for the building pressurization system. work to be done at roof penthouse. | $450,000 |
| Dec 12, 2007 | Expired or cancelled expired Jul 2009 | 795 Folsom St | Skyline Construction | removal of non load bearing partiting @ 6th floor, ceiling grid system, lighting fixtures outlets millwork & finishes, interior alteration only, per ab-0017Details
removal of non load bearing partiting @ 6th floor, ceiling grid system, lighting fixtures outlets millwork & finishes, interior alteration only, per ab-0017 | $51,000 |
| Nov 20, 2007 | Completed final sign-off Jan 2008 | 795 Folsom St | Anderson, Rowe & Buckley, Inc. | 2nd/fl.t.i. existing fire sprinkler system; 5 new, 8 relocatedDetails
2nd/fl.t.i. existing fire sprinkler system; 5 new, 8 relocated | $2,000 |
| Nov 19, 2007 | Completed final sign-off Jan 2008 | 795 Folsom St | Bcci Construction Company | installation of new ductwork, register 2 fire smoke dumpers, 1 heat pump. new & relocate light fixtures, power outlets and tenat equipment. existing server room to be remodeled. interior work only.Details
installation of new ductwork, register 2 fire smoke dumpers, 1 heat pump. new & relocate light fixtures, power outlets and tenat equipment. existing server room to be remodeled. interior work only. | $90,000 |
| Oct 12, 2007 | Completed final sign-off Jan 2008 | 795 Folsom St | t/i 2nd floor, to provide new office,conference room,ante-room,closets and meeting room.Details
t/i 2nd floor, to provide new office,conference room,ante-room,closets and meeting room. | $250,000 | |
| Jul 18, 2006 | Completed final sign-off Dec 2006 | 795 Folsom St | Coast Sign Incorporated | to erect single faced non electric wall signDetails
to erect single faced non electric wall sign | $1,500 |
| Jun 23, 2006 | Completed final sign-off Sep 2006 | 795 Folsom St | Bcci Construction Company | oti-2, 2nd floor, el, me.Details
oti-2, 2nd floor, el, me. | $200,000 |
| May 3, 2006 | Completed final sign-off Jun 2006 | 795 Folsom St | Bcci Construction Company | interior, non structural, preconstruction demolition on floor2. this work is being performed under the requirement of sfab-017. the floor will remain unoccupied as required.Details
interior, non structural, preconstruction demolition on floor2. this work is being performed under the requirement of sfab-017. the floor will remain unoccupied as required. | $15,000 |
| Apr 26, 2006 | Completed final sign-off Sep 2006 | 795 Folsom St | Bcci Construction Company | oti-1 2nd floor, improvement includes demoliton, construction of partitions, millwork, ceiling work & finishes.Details
oti-1 2nd floor, improvement includes demoliton, construction of partitions, millwork, ceiling work & finishes. | $170,000 |
| Dec 8, 2005 | Completed final sign-off Mar 2006 | 795 Folsom St | Pribuss Engineering Inc | oti-3 5th fl spDetails
oti-3 5th fl sp | $25,000 |
| Dec 8, 2005 | Completed final sign-off Mar 2006 | 795 Folsom St | Pribuss Engineering Inc | oti-3 4th fl spDetails
oti-3 4th fl sp | $35,000 |
| Aug 4, 2005 | Completed final sign-off Aug 2005 | 795 Folsom St | Bevilacqua & Sons | to erect electric single faced sign.Details
to erect electric single faced sign. | |
| Aug 3, 2005 | Completed final sign-off Mar 2006 | 795 Folsom St | Bcci Construction Company | oti-1, 4th floor, el, ls, sp, me.Details
oti-1, 4th floor, el, ls, sp, me. | $800,000 |
| Aug 3, 2005 | Completed final sign-off Mar 2006 | 795 Folsom St | Bcci Construction Company | oti-1 5th floor, lg,me, ls, spDetails
oti-1 5th floor, lg,me, ls, sp | $500,000 |
| Feb 15, 2005 | Completed final sign-off Jun 2005 | 795 Folsom St | install fixtures, plumbing,electrical,hvac to make space suitable for quick service restaurant,Details
install fixtures, plumbing,electrical,hvac to make space suitable for quick service restaurant, | $250,000 | |
| Nov 18, 2004 | Completed final sign-off Jan 2005 | 795 Folsom St | Turner Construction Co | revision to 200409214721 3rd floor onlyDetails
revision to 200409214721 3rd floor only | $5,000 |
| Nov 13, 2004 | Never finaled issued Nov 2004, no final | 795 Folsom St | house number permitDetails
house number permit | ||
| Sep 21, 2004 | Completed final sign-off Jan 2005 | 795 Folsom St | Turner Construction Co | demo walls & doors; build back walls, hvac & electrical, sprinklers under separate permitDetails
demo walls & doors; build back walls, hvac & electrical, sprinklers under separate permit | $98,546 |
| Jun 5, 2001 | Expired or cancelled expired Apr 2005 | 795 Folsom St | Hathaway Dinwiddie Co. | as built lobby work rev. to appl#9922360 h/c addressedDetails
as built lobby work rev. to appl#9922360 h/c addressed | $18,000 |
| Jan 22, 2001 | Completed final sign-off Apr 2001 | 795 Folsom St | Swinerton Builders | revision/additional shaft wall with slab penetration for grg exhaust fanDetails
revision/additional shaft wall with slab penetration for grg exhaust fan | $80,000 |
| Jan 16, 2001 | Completed final sign-off Apr 2001 | 795 Folsom St | Ayoob & Peery Plumbing Co Inc | extend fire sprinkler system to core area only floor fully sprinkleredDetails
extend fire sprinkler system to core area only floor fully sprinklered | $4,200 |
| Jan 5, 2001 | Completed final sign-off Apr 2001 | 795 Folsom St | Ayoob & Peery Plumbing Co Inc | relocate and add heads per tenant imprvmt at 1st floor only no increase in office spaceDetails
relocate and add heads per tenant imprvmt at 1st floor only no increase in office space | $12,500 |
| Jan 4, 2001 | Completed final sign-off Apr 2001 | 795 Folsom St | Swinerton Builders | oti-4 1st flr,lsDetails
oti-4 1st flr,ls | $50,000 |
| Dec 14, 2000 | Completed final sign-off Apr 2001 | 795 Folsom St | Swinerton Builders | oti-3 revision at 1/fl., change from electrical heated vav boxes to waterheated bldg systemDetails
oti-3 revision at 1/fl., change from electrical heated vav boxes to waterheated bldg system | $40,000 |
| Sep 20, 2000 | Completed final sign-off Apr 2001 | 795 Folsom St | Swinerton Builders | oti-2:-1st floor el, meDetails
oti-2:-1st floor el, me | $400,000 |
| Sep 20, 2000 | Completed final sign-off Apr 2001 | 795 Folsom St | Swinerton Builders | oti-1 (1st fl.) el, me, ls and spDetails
oti-1 (1st fl.) el, me, ls and sp | $800,000 |
| Aug 3, 2000 | Expired or cancelled expired May 2005 | 795 Folsom St | Honeywell | install timed emergency release buttons at new glass doors (ref 200003305824)Details
install timed emergency release buttons at new glass doors (ref 200003305824) | |
| Mar 30, 2000 | Expired or cancelled expired Mar 2001 | 795 Folsom St | Honeywell | release stairwell 2 doors and 4 glass doors for fire alarm.Details
release stairwell 2 doors and 4 glass doors for fire alarm. | $35,938 |
| Mar 17, 2000 | Completed final sign-off May 2001 | 795 Folsom St | build shell,demo/replace perimeter storefront eliminate arcade,modify entrance ramp/stairs & infillDetails
build shell,demo/replace perimeter storefront eliminate arcade,modify entrance ramp/stairs & infill | $275,000 | |
| Jan 5, 2000 | Completed final sign-off Jun 2000 | 795 Folsom St | oti-3 6th floorDetails
oti-3 6th floor |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Construction (11), Tri-Signal Integration Inc. (11), Bcci Construction Company (9), Gci, Inc (9), Novo Construction Inc (9), Anderson, Rowe & Buckley, Inc. (7), Pioneer Fire Inc. (5), Swinerton Builders (5), Golden Gate Fire Protection Inc (4), Principal Builders Inc. (4), West Builders Inc. (4), Ayoob & Peery Plumbing Co Inc (3), M C S Construction Services (3), Golden Gate Sign Company Inc. (2), Honeywell (2), Legacy Mechanical & Energy Services, Inc (2), Pribuss Engineering Inc (2), Turner Construction Co (2), Bevilacqua & Sons, Coast Sign Incorporated, Hathaway Dinwiddie Co., Metropolitan Electrical Construction, Peacock Construction Inc, R L H Fire Protection Inc, Rossi Builders Inc., Terra Visual Inc, Vulcan Construction Inc
- Architects
- Charles Blank (5), George Soskin (4), Sally Fee (4), Esperanze Barrera (3), Scott Clement (3), Robert Van Halle (2), Daniel Huntsman, Eric Ibsen, Jack Munson, Peter Mchugh, R. Geoffrey Spaete, Thomas Lundberg
- Engineers
- Alexander Joseph Pacheco (2), Kevin Sorensen, Sherry Chaumpluke, Xuong Quach
- Attorneys
- James Sunseri
- Designers
- Oleg Vygrug (2), Robert Buckley