R. Geoffrey Spaete
- License
- C34147
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Idgroup
- On San Francisco permits
- Sep 2013 to Jul 2015
4 permits since 2000 (architect on 4 permits): 3 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Field Construction Inc., Lakeview Construction/Wisconsin Lakeview, Peacock Construction Inc, Skyline Construction
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2015 | Completed final sign-off Jun 2016 | 1390 Market St | Field Construction Inc. | 2/f ste 200 section lowrise: new floor, wall finishes, (n) partitions etc. connection to and extension of base building utilities & services. meps are not included in this permit. no change to (e) base building washrooms, janitor's closets etc. n/a ordinance #155-13Details
2/f ste 200 section lowrise: new floor, wall finishes, (n) partitions etc. connection to and extension of base building utilities & services. meps are not included in this permit. no change to (e) base building washrooms, janitor's closets etc. n/a ordinance #155-13 | $2,100,000 |
| Feb 23, 2015 | Completed final sign-off Sep 2015 | 795 Folsom St | Skyline Construction | ste 100 - revision to appl #2015.0107.5113: delete scope of work at hallway area 100w. n/a maher ordinanceDetails
ste 100 - revision to appl #2015.0107.5113: delete scope of work at hallway area 100w. n/a maher ordinance | |
| Oct 11, 2013 | Completed final sign-off Dec 2013 | 1 Embarcadero Center | Peacock Construction Inc | 5th fl:demo of selected non-structural partitions, construct new non-structural partitions, new & relocate lighting, new & relocate doors, frames. minor rework of hvac to accomadate nw layout, minor sprinkler relocation per nw layout. new & relocate life safety. srpinkler work under seperate permit.Details
5th fl:demo of selected non-structural partitions, construct new non-structural partitions, new & relocate lighting, new & relocate doors, frames. minor rework of hvac to accomadate nw layout, minor sprinkler relocation per nw layout. new & relocate life safety. srpinkler work under seperate permit. | $173,000 |
| Sep 10, 2013 | Never finaled issued Feb 2014, no final | 55 Cyril Magnin St | Lakeview Construction/Wisconsin Lakeview | fedex office to remodel existing ashbury meeting rom. package room and general store room for fedex office use.Details
fedex office to remodel existing ashbury meeting rom. package room and general store room for fedex office use. | $30,000 |