Block 3519, lot 067
342 09th St
- City’s use
- Commercial Office
- Built
- 1920
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 24,439 sq ft
- Lot
- 12,500 sq ft
- Zoning
- RCD
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2026 | In progress filed May 2026, not yet issued | 342 09th St | remove storage room & infill the front door entrance ramp in the 1st/f (interior work only)Details
remove storage room & infill the front door entrance ramp in the 1st/f (interior work only) | $15,000 | |
| Nov 19, 2025 | Completed final sign-off May 2026 | 342 09th St | California Deluxe Windows Inc | replace (6) aluminum windows with like for like in size. no alterations to any openings. street visible. u-factor 0.28. 308.5 sq ft on 1st story. to be fixed plate-glass aluminum-sash windows. all on ground floor.Details
replace (6) aluminum windows with like for like in size. no alterations to any openings. street visible. u-factor 0.28. 308.5 sq ft on 1st story. to be fixed plate-glass aluminum-sash windows. all on ground floor. | $33,000 |
| Dec 10, 2021 | Never finaled issued Dec 2021, no final | 346 09th St | Martin Sign Co Inc. | the installation of painted aluminum dimentional lettering onto exterior walls. non illuminated. (tempo)Details
the installation of painted aluminum dimentional lettering onto exterior walls. non illuminated. (tempo) | $950 |
| Feb 13, 2020 | Completed final sign-off Jul 2020 | 342 09th St | Principal Builders Inc. | mep and t-24 for 2nd floor. barrier removal to install new ductwork power, and piping. please refer to t.i. app#201912200219 for architectural.workDetails
mep and t-24 for 2nd floor. barrier removal to install new ductwork power, and piping. please refer to t.i. app#201912200219 for architectural.work | $22,950 |
| Dec 20, 2019 | Completed final sign-off Jul 2020 | 342 09th St | Principal Builders Inc. | floor 2: barrier removal. demolition of some existing ceiling height partitions and plumbing fixtures. construction of full height partitions, doors, frames, restroom upgrades, finishes, associated mech, plumbing, and lighting. mep deferredDetails
floor 2: barrier removal. demolition of some existing ceiling height partitions and plumbing fixtures. construction of full height partitions, doors, frames, restroom upgrades, finishes, associated mech, plumbing, and lighting. mep deferred | $125,000 |
| May 31, 2019 | Never finaled issued Jun 2019, no final | 342 09th St | minor interior office tenant improvement of e 2 story bruilding. scope to inlcude new interior partitions for new office room at e 1st fl and new conference room at e 2nd fl. n/a for maher.Details
minor interior office tenant improvement of e 2 story bruilding. scope to inlcude new interior partitions for new office room at e 1st fl and new conference room at e 2nd fl. n/a for maher. | $30,000 | |
| Jan 7, 2015 | Completed final sign-off Jan 2015 | 346 09th St | Yong Chan Chon (Dba Ace Roofing Co.) | reroofingDetails
reroofing | $7,500 |
| Dec 8, 2014 | Completed final sign-off Feb 2015 | 342 09th St | Blackline Construction | hvac ducts. compliance with maher ordinance no 155-13 not required.Details
hvac ducts. compliance with maher ordinance no 155-13 not required. | $20,000 |
| Oct 16, 2014 | Completed final sign-off Mar 2015 | 342 09th St | Blackline Construction | interior office tenant improvement of (e) 2-story building for a tech company. scope of work to include (n) ada lift for wheelchair, (n) inerior partitions for (n) conference rooms, offices/tel rooms, pantry & storages. elect, mech & plmbg work to submit under separate permits. maher n/aDetails
interior office tenant improvement of (e) 2-story building for a tech company. scope of work to include (n) ada lift for wheelchair, (n) inerior partitions for (n) conference rooms, offices/tel rooms, pantry & storages. elect, mech & plmbg work to submit under separate permits. maher n/a | $125,000 |
| Jun 24, 2014 | Completed final sign-off Nov 2014 | 342 09th St | Vt Construction | add 11 hvac units with stub cuts for 2 story shell office building for future tenant improvements. maher not reqDetails
add 11 hvac units with stub cuts for 2 story shell office building for future tenant improvements. maher not req | $95,000 |
| Dec 19, 2013 | Completed final sign-off Nov 2014 | 342 09th St | Vt Construction | to comply with complaint # 201310651, addition of 2 (n) bathrooms on first & 2nd flrs, removal of (e) stairs to accomodate two (n) compliant stairs & moderination of (e) elevator .new storefront.Details
to comply with complaint # 201310651, addition of 2 (n) bathrooms on first & 2nd flrs, removal of (e) stairs to accomodate two (n) compliant stairs & moderination of (e) elevator .new storefront. | $125,000 |
| Nov 15, 2013 | Never finaled issued Nov 2013, no final | 342 09th St | street space permitDetails
street space permit | ||
| Aug 9, 2013 | Completed final sign-off Nov 2014 | 342 09th St | Vt Construction | remove (e) non-structural slab on grade and (e) non structural interior partitions on 1/f, remove (e) non structural interior walls on 2/f. space to remain vacant per ab017Details
remove (e) non-structural slab on grade and (e) non structural interior partitions on 1/f, remove (e) non structural interior walls on 2/f. space to remain vacant per ab017 | $50,000 |
| Dec 8, 2011 | Never finaled issued Jan 2012, no final | 342 09th St | unit #342b & 346-provide 2nd means of egress for 2 vacant commercial spaces, all work to be performed with the (e) boundary of the buildingDetails
unit #342b & 346-provide 2nd means of egress for 2 vacant commercial spaces, all work to be performed with the (e) boundary of the building | $10,000 | |
| Jun 17, 2010 | Never finaled issued Jun 2010, no final | 342 09th St | Area Development Inc. | enclose 3 openings along rear property line. provide 7/8" stucco throughout 25' width of the lot. not visible from street. openings are non-compliant.Details
enclose 3 openings along rear property line. provide 7/8" stucco throughout 25' width of the lot. not visible from street. openings are non-compliant. | $5,000 |
| May 28, 2008 | Never finaled issued May 2008, no final | 346 09th St | open a 3' door on the northern side of 9th st frontDetails
open a 3' door on the northern side of 9th st front | $2,000 | |
| Jun 20, 2003 | Expired or cancelled withdrawn May 2008 | 346 09th St | demolish 2 stroy office/retail spaceDetails
demolish 2 stroy office/retail space | ||
| Jun 20, 2003 | Expired or cancelled withdrawn Jun 2008 | 346 09th St | type -3/1-hr coml with 5 units residentialDetails
type -3/1-hr coml with 5 units residential | $4,600,000 | |
| Feb 13, 2003 | Never finaled issued Feb 2003, no final | 346 09th St | address assignmentDetails
address assignment | ||
| Feb 13, 2003 | Never finaled issued Feb 2003, no final | 342 09th St | address assignmentDetails
address assignment | ||
| Feb 13, 2003 | Never finaled issued Feb 2003, no final | 342 09th St | address assignmentDetails
address assignment | ||
| Feb 13, 2003 | Never finaled issued Feb 2003, no final | 342 09th St | address assignmentDetails
address assignment | ||
| Jan 13, 2003 | Completed final sign-off Feb 2003 | 346 09th St | remove non-bearing interior portions in (e) tenant space on grd fl. upgradew entrance to rpovideDetails
remove non-bearing interior portions in (e) tenant space on grd fl. upgradew entrance to rpovide | $18,000 | |
| Feb 27, 2002 | Completed final sign-off Apr 2002 | 346 09th St | install accessible toilet in existing tenant spaceDetails
install accessible toilet in existing tenant space | $7,000 | |
| Feb 2, 2001 | Completed final sign-off Mar 2001 | 346 09th St | comply with bolt-plus-umb programDetails
comply with bolt-plus-umb program | ||
| Feb 11, 2000 | Completed final sign-off Feb 2001 | 346 09th St | High Quality Roofing Co | reroofingDetails
reroofing |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Vt Construction (3), Blackline Construction (2), Principal Builders Inc. (2), Area Development Inc., California Deluxe Windows Inc, High Quality Roofing Co, Martin Sign Co Inc., Yong Chan Chon (Dba Ace Roofing Co.)
- Architects
- Marc Dimalanta, Omied Arvin
- Engineers
- Darren Wong, Rudolfo P Bustos Iii, Steve H. Kang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.