Block 3707, lot 052
2 New Montgomery St
- City’s use
- Commercial Hotel
- Built
- 1909
- Stories
- 9
- Units
- 551
- Rooms
- 560 bathrooms
- Building
- 591,732 sq ft
- Lot
- 94,599 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
100 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | In progress issued Jul 2026 | 2 New Montgomery St | Emcor Services/Mesa Energy Systems Inc | roof top replace 6 air handlers located on mezzanine fl w/ new air handler of similar weights, electrical scope will be disconnection & reconnection of wrting for each air handlerDetails
roof top replace 6 air handlers located on mezzanine fl w/ new air handler of similar weights, electrical scope will be disconnection & reconnection of wrting for each air handler | $1,200,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 2 New Montgomery St | Emcor Services/Mesa Energy Systems Inc | rooftop 9th/f: replace 5 rooftop air handlers with new air handlers with similar capacities for heating, cooling & electrical, ahus are of similar weightsDetails
rooftop 9th/f: replace 5 rooftop air handlers with new air handlers with similar capacities for heating, cooling & electrical, ahus are of similar weights | $727,619 |
| Mar 3, 2026 | In progress issued Mar 2026 | 2 New Montgomery St | Emcor Services/Mesa Energy Systems Inc | replacement of 5 exhaust hans on 9th/fDetails
replacement of 5 exhaust hans on 9th/f | $32,400 |
| Jan 29, 2026 | In progress filed Jan 2026, not yet issued | 2 New Montgomery St | at&t modification of an (e) wireless facility consisting of: remove (4) rru's & power trunks: install 1 (2) air anteannas, 2 rrus & power trunks & pipes: install 1 rectifier expansion shelf; (1) -48v rectifier; 6 power exten converter; (1) g4 bbu; install rf safety signs. stripping & barricades perDetails
at&t modification of an (e) wireless facility consisting of: remove (4) rru's & power trunks: install 1 (2) air anteannas, 2 rrus & power trunks & pipes: install 1 rectifier expansion shelf; (1) -48v rectifier; 6 power exten converter; (1) g4 bbu; install rf safety signs. stripping & barricades per | $81,500 | |
| Nov 25, 2025 | Completed final sign-off Jan 2026 | 2 New Montgomery St | Intrepid Electronic Systems Inc | install one new one way private radio alarm system (rat) (aes)Details
install one new one way private radio alarm system (rat) (aes) | $1,000 |
| Sep 25, 2025 | Completed final sign-off Feb 2026 | 2 New Montgomery St | Northern Sun Associates | ground fl: minor interior remodel of selected work of ghirardelli at the palace hotel. replace spot lights wiht new track lighting. replace and relocate island display in the sales area. remove and replace the backsplash at counter area. work is below ada state valuation threshold.Details
ground fl: minor interior remodel of selected work of ghirardelli at the palace hotel. replace spot lights wiht new track lighting. replace and relocate island display in the sales area. remove and replace the backsplash at counter area. work is below ada state valuation threshold. | $70,000 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 2 New Montgomery St | Marchetti Group | revision to 202104148558, 202307111848: to comply with special inspections per field inspectors requestDetails
revision to 202104148558, 202307111848: to comply with special inspections per field inspectors request | |
| Jan 17, 2025 | Completed final sign-off Sep 2025 | 2 New Montgomery St | Marchetti Group | revision to permits 202104148558 and 202307111848. change position of fence relative to property line. recess one access gate to not swing over property line. change one freight elevator loading access gate to sliding gate from swinging gate.Details
revision to permits 202104148558 and 202307111848. change position of fence relative to property line. recess one access gate to not swing over property line. change one freight elevator loading access gate to sliding gate from swinging gate. | |
| Dec 10, 2024 | In progress issued Dec 2024 | 2 New Montgomery St | Siemens Industry, Inc. | fire only work to add a cellular dialer onto the (e) fire alarm system no ref permit application number (fire alarm work only)Details
fire only work to add a cellular dialer onto the (e) fire alarm system no ref permit application number (fire alarm work only) | $7,318 |
| Nov 20, 2024 | In progress issued Dec 2024 | 2 New Montgomery St | Rainbow Waterproofing & Restor | facade rehabilitation program comprising brick work repair/repointing, terracotta repair, facade cleaning, window replacementDetails
facade rehabilitation program comprising brick work repair/repointing, terracotta repair, facade cleaning, window replacement | $6,500,000 |
| Jan 12, 2024 | In progress filed Jan 2024, not yet issued | 2 New Montgomery St | minor remodel of extg bar, including new millwork, bar equipment and associated electrical and plumbingDetails
minor remodel of extg bar, including new millwork, bar equipment and associated electrical and plumbing | $150,000 | |
| Nov 16, 2023 | Completed final sign-off Jun 2025 | 2 New Montgomery St | Siemens Industry, Inc. | fire only work to remove sprinkler heads in association with the elevator modernization project. for elevator cars 1,2,8,9,10,11. (no plans permit).Details
fire only work to remove sprinkler heads in association with the elevator modernization project. for elevator cars 1,2,8,9,10,11. (no plans permit). | |
| Oct 12, 2023 | In progress issued Jul 2024 | 2 New Montgomery St | Arrow Sign Company | upgrade illumination from neon to rgb led for 2 existing roof top signs "the palace" . single faced, roof signs.Details
upgrade illumination from neon to rgb led for 2 existing roof top signs "the palace" . single faced, roof signs. | $153,377 |
| Jul 11, 2023 | Completed final sign-off Sep 2025 | 2 New Montgomery St | Marchetti Group | revision to pa#202104148558, defferred structural engineering & special inspections. add exterior security fence at ground fl along annie st to enclose 855 sf of existing open sidewalk.Details
revision to pa#202104148558, defferred structural engineering & special inspections. add exterior security fence at ground fl along annie st to enclose 855 sf of existing open sidewalk. | |
| Feb 15, 2023 | Completed final sign-off May 2023 | 653 Market St | Arrow Sign Company | 1-internally illuminated single-faced hanging sign above door "moleskine"Details
1-internally illuminated single-faced hanging sign above door "moleskine" | $3,423 |
| Sep 27, 2022 | Never finaled filed Sep 2022, never issued | 2 New Montgomery St | Johnson Controls Inc. | install new relay modules in elevator machine rooms 1,2,3,4,5,6,8,9,10,11 and 12 for the fire fighter helmet. the existing elevator recall and alternate recall moduels to remian. ref to scope on plans for details on specific elevators maher not reqDetails
install new relay modules in elevator machine rooms 1,2,3,4,5,6,8,9,10,11 and 12 for the fire fighter helmet. the existing elevator recall and alternate recall moduels to remian. ref to scope on plans for details on specific elevators maher not req | $120,000 |
| Sep 13, 2022 | Never finaled filed Sep 2022, never issued | 2 New Montgomery St | Johnson Controls Inc. | elevator #6: install new relay modules & heat detectors in elevator machine room #6 for the shunt trip, fire fighter helmet and monitoring of the shunt trip. (e) elevator recall modules are to remain. install new heat elevator in elevator shaft #6. connect all addressable devices to (e) slc.Details
elevator #6: install new relay modules & heat detectors in elevator machine room #6 for the shunt trip, fire fighter helmet and monitoring of the shunt trip. (e) elevator recall modules are to remain. install new heat elevator in elevator shaft #6. connect all addressable devices to (e) slc. | $9,000 |
| Sep 13, 2022 | Never finaled filed Sep 2022, never issued | 2 New Montgomery St | Johnson Controls Inc. | elevator #1: install new relay modules & heat detectors in elevator machine room #1 for the shunt trip, fire fighter helmet and monitoring of the shunt trip. (e) elevator recall and alternate recall modules are to remain. connect all addressable devices to (e) slc.Details
elevator #1: install new relay modules & heat detectors in elevator machine room #1 for the shunt trip, fire fighter helmet and monitoring of the shunt trip. (e) elevator recall and alternate recall modules are to remain. connect all addressable devices to (e) slc. | $9,000 |
| Apr 14, 2022 | Completed final sign-off Sep 2022 | 2 New Montgomery St | Metropolitan Electrical Construction | at&t wireless: modification of an unmanned at&t telecom facility consisting of: remove & replace 4 panel antennas. remove 2 rrus 11 b12 and 2 rruw b5. install new rrus 4478 b12a. install 1 new 6648 baseband unit in (e) rack.Details
at&t wireless: modification of an unmanned at&t telecom facility consisting of: remove & replace 4 panel antennas. remove 2 rrus 11 b12 and 2 rruw b5. install new rrus 4478 b12a. install 1 new 6648 baseband unit in (e) rack. | $30,000 |
| Jan 28, 2022 | Completed final sign-off Apr 2023 | 2 New Montgomery St | Nuwave International Industries Inc | modification to (e) vzw facility. remove and replace 6 (e) antennas with 6 (n) antennas. remove and replace 8 (e) rru-ii unit with (4) (n) radio 4449 units antennas. remove and replace 8 (e) rrus 12 units with 4 (n) radio 8863 unit at antennas. remove and replace 4 (e) rrus-32 unit with (4) (n)Details
modification to (e) vzw facility. remove and replace 6 (e) antennas with 6 (n) antennas. remove and replace 8 (e) rru-ii unit with (4) (n) radio 4449 units antennas. remove and replace 8 (e) rrus 12 units with 4 (n) radio 8863 unit at antennas. remove and replace 4 (e) rrus-32 unit with (4) (n) | $40,000 |
| Apr 14, 2021 | Completed final sign-off Sep 2025 | 2 New Montgomery St | Marchetti Group | add exterior security fence at ground floor along annie st, at south-west side of palace hotel to enclose 855 sf of existing open sidewalk within property.Details
add exterior security fence at ground floor along annie st, at south-west side of palace hotel to enclose 855 sf of existing open sidewalk within property. | $50,000 |
| Dec 5, 2019 | Never finaled issued Dec 2019, no final | 2 New Montgomery St | Alpha Restoration & Wateproof | street spaceDetails
street space | |
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 2 New Montgomery St | street spaceDetails
street space | ||
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 2 New Montgomery St | street spaceDetails
street space | ||
| Apr 11, 2019 | Never finaled filed Apr 2019, never issued | 2 New Montgomery St | street space /mtaDetails
street space /mta | ||
| Feb 4, 2019 | Never finaled issued Feb 2019, no final | 2 New Montgomery St | street spaceDetails
street space | ||
| Oct 23, 2018 | Completed final sign-off Jan 2021 | 2 New Montgomery St | Metropolitan Electrical Construction | at&t - swap 4 (e) antennas on facade of penthouse; install 2(n) rru-4478 b14 on facade on penthouse; install 2(n) rru-4478 b5 on facade of penthouse; install 2 dc12; install 2 fibertrunks and 6(n) dc power trunks; install 2 (n) power plants on roof in (n) frp enclosure with 3 (n) battery strings ofDetails
at&t - swap 4 (e) antennas on facade of penthouse; install 2(n) rru-4478 b14 on facade on penthouse; install 2(n) rru-4478 b5 on facade of penthouse; install 2 dc12; install 2 fibertrunks and 6(n) dc power trunks; install 2 (n) power plants on roof in (n) frp enclosure with 3 (n) battery strings of | $15,000 |
| Nov 13, 2017 | Completed final sign-off Jun 2018 | 645 Market St | Freeman Construction Company | commercial tenant improvement limited to selective demo, new sheetrock patching, new paint, tile flooring, elec relocationDetails
commercial tenant improvement limited to selective demo, new sheetrock patching, new paint, tile flooring, elec relocation | $34,000 |
| Sep 26, 2017 | Completed final sign-off Jan 2021 | 2 New Montgomery St | Emcor Services/Mesa Energy Systems Inc | remove 3 existing chillers, replace with 2 new chillers, remove 3 exiting chw pumps, replace with 2 new chw pumps, remove e existing cw pumps and replace with 2 new cw pumps, remove 1 existing cooling tower and replace with 1 new cooling tower, add 1 heat exchangerDetails
remove 3 existing chillers, replace with 2 new chillers, remove 3 exiting chw pumps, replace with 2 new chw pumps, remove e existing cw pumps and replace with 2 new cw pumps, remove 1 existing cooling tower and replace with 1 new cooling tower, add 1 heat exchanger | $900,000 |
| Sep 26, 2017 | Never finaled issued Aug 2018, no final | 2 New Montgomery St | Metropolitan Electrical Construction | verizon wireless to install new unmanned telecommunication facility at the palace hotel. the base station equipment will be in the basement. install 12 antennas, 28 rrus and 16 raycap surge supressors behind 3 frp screensDetails
verizon wireless to install new unmanned telecommunication facility at the palace hotel. the base station equipment will be in the basement. install 12 antennas, 28 rrus and 16 raycap surge supressors behind 3 frp screens | $160,000 |
| Aug 16, 2016 | Completed final sign-off May 2017 | 2 New Montgomery St | Metropolitan Electrical Construction | att modification: r&r 4(e) antennas w/4new antennas, r&r 2(e) rrus; install 2new rrus; install other small equip maher naDetails
att modification: r&r 4(e) antennas w/4new antennas, r&r 2(e) rrus; install 2new rrus; install other small equip maher na | $18,000 |
| May 26, 2016 | Completed final sign-off Jan 2017 | 2 New Montgomery St | Metropolitan Electrical Construction | at&t: modify (e) site: r&r 2 (e) antennas w/2 new antennas behind (e) screen wall; install 2 new rrus=32 behind (e) screen, install new xmu maher naDetails
at&t: modify (e) site: r&r 2 (e) antennas w/2 new antennas behind (e) screen wall; install 2 new rrus=32 behind (e) screen, install new xmu maher na | $9,000 |
| May 13, 2016 | Expired or cancelled cancelled Jan 2026 | 2 New Montgomery St | Maguire Inc Dba Lahue And Associates | vinyl sign on retail (e) windows (5 locations).Details
vinyl sign on retail (e) windows (5 locations). | $700 |
| Jan 13, 2016 | Completed final sign-off Feb 2016 | 2 New Montgomery St | Johnson Controls Inc. | basemt,1st-new duct smoke detector for auto shutdown of fc3 & reused e duct smoke det for fc4,19 new smoke det connected to e slc circuit.4new strobes,12 new speaker strobes connected to circuits n1/n2 e tiemate booster power supply w fcc.connect speaker to e speaker circuits from nearest e speaker.Details
basemt,1st-new duct smoke detector for auto shutdown of fc3 & reused e duct smoke det for fc4,19 new smoke det connected to e slc circuit.4new strobes,12 new speaker strobes connected to circuits n1/n2 e tiemate booster power supply w fcc.connect speaker to e speaker circuits from nearest e speaker. | $15,000 |
| Jan 8, 2016 | Completed final sign-off Jan 2016 | 2 New Montgomery St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system, ti - basement, 5 heads; 1st floor - 41 heads. ref pa 2015-1014-9660. maher naDetails
existing fire sprinkler system, ti - basement, 5 heads; 1st floor - 41 heads. ref pa 2015-1014-9660. maher na | $23,000 |
| Nov 6, 2015 | Expired or cancelled cancelled Jan 2026 | 2 New Montgomery St | installation & fastening of xmas tree on roof of bldg. maher not reqDetails
installation & fastening of xmas tree on roof of bldg. maher not req | $15,000 | |
| Oct 14, 2015 | Completed final sign-off Mar 2016 | 2 New Montgomery St | Northern Sun Associates | basement/ground fl. mep associated with interior ti 2015-0430-4994. life safety deferred.Details
basement/ground fl. mep associated with interior ti 2015-0430-4994. life safety deferred. | $75,000 |
| Aug 17, 2015 | Never finaled issued Aug 2015, no final | 2 New Montgomery St | verizon - revision to pa #201405226513 & 2014 0808 3446 to extend th time period of temporary installation to march 1, 2016 per planning issue. n/a maher ordinance.Details
verizon - revision to pa #201405226513 & 2014 0808 3446 to extend th time period of temporary installation to march 1, 2016 per planning issue. n/a maher ordinance. | ||
| Jul 8, 2015 | Never finaled issued Oct 2016, no final | 2 New Montgomery St | Maguire Inc Dba Lahue And Associates | to erect non electric, projecting, double faced sign. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect non electric, projecting, double faced sign. ** maher: compliance with ordinance no# 155-13 not required ** | $8,000 |
| Jun 18, 2015 | Completed final sign-off Oct 2015 | 2 New Montgomery St | Plant Construction Co, Lp | revision to 201312234897 for new bath layouts due to infield conditionsDetails
revision to 201312234897 for new bath layouts due to infield conditions | |
| May 20, 2015 | Completed final sign-off Jul 2015 | 2 New Montgomery St | Johnson Controls Inc. | 1st floor: add new duct detector and relay module and new speaker strobe. replace existing smoke detector. maher n/a.Details
1st floor: add new duct detector and relay module and new speaker strobe. replace existing smoke detector. maher n/a. | $12,396 |
| May 12, 2015 | Completed final sign-off Oct 2015 | 2 New Montgomery St | Plant Construction Co, Lp | g/f -addition of accessible counter at lobby & redirection of employee access to back of house spaces; maher n/aDetails
g/f -addition of accessible counter at lobby & redirection of employee access to back of house spaces; maher n/a | $5,000 |
| May 11, 2015 | Completed final sign-off Sep 2015 | 653 Market St | Johnson Controls Inc. | ground flr: ti- replace smoke detecotr, add pull station, add 5 strobes, replace speaker, add new speaker. maher naDetails
ground flr: ti- replace smoke detecotr, add pull station, add 5 strobes, replace speaker, add new speaker. maher na | $13,695 |
| May 1, 2015 | Completed final sign-off Jul 2015 | 2 New Montgomery St | R L H Fire Protection Inc | 1st flr: fire sprinkler ti. relocate 4 and change 1 to ipright, ref pa 2015 0212 8198. maher naDetails
1st flr: fire sprinkler ti. relocate 4 and change 1 to ipright, ref pa 2015 0212 8198. maher na | $4,550 |
| Apr 30, 2015 | Completed final sign-off Mar 2016 | 2 New Montgomery St | Northern Sun Associates | ti and change of use for new wine store on gr floor and basement. work includes new partitions, fixtures, millwork. no change to exterior. mep and fire protection under separate permit maher not reqDetails
ti and change of use for new wine store on gr floor and basement. work includes new partitions, fixtures, millwork. no change to exterior. mep and fire protection under separate permit maher not req | $512,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2015 | 653 Market St | Potter Fire Protection | relocate 8 fire sprinklers ref 201502117994 maher not reqDetails
relocate 8 fire sprinklers ref 201502117994 maher not req | $4,000 |
| Mar 31, 2015 | Completed final sign-off Sep 2015 | 2 New Montgomery St | revision to pa 201312234897 to include presidential suite, royal suite # 288 & estate suite # 238. modifications; maher n/aDetails
revision to pa 201312234897 to include presidential suite, royal suite # 288 & estate suite # 238. modifications; maher n/a | $5,000 | |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 2 New Montgomery St | Northern Sun Associates | 1st floor: interior soft demo only. remove fixtures, finishes and non structural partition wallsDetails
1st floor: interior soft demo only. remove fixtures, finishes and non structural partition walls | $3,500 |
| Feb 24, 2015 | Expired or cancelled withdrawn Aug 2015 | 653 Market St | install new vinyl window signs. new sign, non-electric, single faced, door/window sign. maher ord n/a.Details
install new vinyl window signs. new sign, non-electric, single faced, door/window sign. maher ord n/a. | $200 | |
| Feb 24, 2015 | Completed final sign-off Oct 2015 | 653 Market St | Angotti & Reilly Inc. | install remote automatic door opener push plates on exterior of building (wireless). door push plates are for accesibility. ** maher: compliance with ordinance no# 155-13 not required **Details
install remote automatic door opener push plates on exterior of building (wireless). door push plates are for accesibility. ** maher: compliance with ordinance no# 155-13 not required ** | $500 |
| Feb 24, 2015 | Completed final sign-off Oct 2015 | 653 Market St | Angotti & Reilly Inc. | install new vinyl window signs. new sign, non-electric, single faced, door/window sign. maher ord n/a.Details
install new vinyl window signs. new sign, non-electric, single faced, door/window sign. maher ord n/a. | $100 |
| Feb 12, 2015 | Completed final sign-off Jul 2015 | 2 New Montgomery St | Plant Construction Co, Lp | convert (e) luggage room into vanilla tenant space for retail. space remain vacant for future tenant. n/a maher ordinanceDetails
convert (e) luggage room into vanilla tenant space for retail. space remain vacant for future tenant. n/a maher ordinance | $100,000 |
| Feb 11, 2015 | Completed final sign-off Oct 2015 | 653 Market St | Angotti & Reilly Inc. | remodel retail space. includes finish changes, new non structural partitions, new mechanical work,new electrical and lighting. no change to exterior except add push buttons for automatic door opener under separate permit, new signage to be under sep. permit, sprk modifications under seperate prmt.Details
remodel retail space. includes finish changes, new non structural partitions, new mechanical work,new electrical and lighting. no change to exterior except add push buttons for automatic door opener under separate permit, new signage to be under sep. permit, sprk modifications under seperate prmt. | $110,000 |
| Dec 26, 2014 | Completed final sign-off Jul 2015 | 2 New Montgomery St | Johnson Controls Inc. | fire alarm ada room retrofit add 46 addressable smokes with low frequency bases , 17 speakers, 91 strobes, 44 sync mods, 7 power supplies, 25 monitor modules, 25 relays, 15 eol spervision relays. maher ord-ext #155-13 not req'd.Details
fire alarm ada room retrofit add 46 addressable smokes with low frequency bases , 17 speakers, 91 strobes, 44 sync mods, 7 power supplies, 25 monitor modules, 25 relays, 15 eol spervision relays. maher ord-ext #155-13 not req'd. | $188,450 |
| Nov 24, 2014 | Completed final sign-off Sep 2015 | 2 New Montgomery St | Plant Construction Co, Lp | new tiles on pool deck and inside pool and spa; demo tile file and approved under pa#201410279985. compliance with maher ordinance no. 155-13 not required.Details
new tiles on pool deck and inside pool and spa; demo tile file and approved under pa#201410279985. compliance with maher ordinance no. 155-13 not required. | $20,000 |
| Oct 27, 2014 | Never finaled issued Oct 2014, no final | 2 New Montgomery St | Plant Construction Co, Lp | 4th flr: interior non-structural demo of floor tile, around pool area on 4th flr for deck, pool interior & whirlpool, tiles will be replaced in a deferred t.i. submittal; maher n/aDetails
4th flr: interior non-structural demo of floor tile, around pool area on 4th flr for deck, pool interior & whirlpool, tiles will be replaced in a deferred t.i. submittal; maher n/a | $15,000 |
| Oct 7, 2014 | Expired or cancelled cancelled Jul 2024 | 2 New Montgomery St | installation of a verizon wireless indoor distributed antenna (idas') system. 1 dc power plant & 2-19" radio racks. 1 gps antenna & 1 donor antenna. associated utilities & wiring as needed. ** maher: compliance with ordinance no# 155-13 not required **Details
installation of a verizon wireless indoor distributed antenna (idas') system. 1 dc power plant & 2-19" radio racks. 1 gps antenna & 1 donor antenna. associated utilities & wiring as needed. ** maher: compliance with ordinance no# 155-13 not required ** | $35,000 | |
| Oct 2, 2014 | Completed final sign-off Jan 2016 | 2 New Montgomery St | Plant Construction Co, Lp | interior non structural renovatations of hotel fitness center on 4th fl only. scope also includes voluntary accessibility upgrade to existing menes and womens restrooms maher not reqDetails
interior non structural renovatations of hotel fitness center on 4th fl only. scope also includes voluntary accessibility upgrade to existing menes and womens restrooms maher not req | $225,000 |
| Aug 8, 2014 | Completed final sign-off Oct 2014 | 2 New Montgomery St | L.D. Strobel Co Ltd | revision to 201405226513 to extend the time period temporary installation to jan 31, 2015 per planning issue. n/a maher ordinanceDetails
revision to 201405226513 to extend the time period temporary installation to jan 31, 2015 per planning issue. n/a maher ordinance | $25,000 |
| Jul 10, 2014 | Never finaled issued Jul 2014, no final | 665 Market St | street space w/mtaDetails
street space w/mta | ||
| Jul 8, 2014 | Never finaled issued Jul 2014, no final | 665 Market St | Johnson Controls Inc. | adding one nac power supply, 1 smoke, 4 duct smokes, 5 speakers, 9 strobes, 1 monitor module, 1 pull stn 4 relays for duct detector shutdown, fire alarm t.i. 201401287270Details
adding one nac power supply, 1 smoke, 4 duct smokes, 5 speakers, 9 strobes, 1 monitor module, 1 pull stn 4 relays for duct detector shutdown, fire alarm t.i. 201401287270 | $25,750 |
| Jul 8, 2014 | Completed final sign-off Jul 2014 | 665 Market St | Certified Fire & Safety Co | install ul300 ansul fire systems to protect kitchen hoods and cooking equipment. ref#2014-0128-7270. n/a for the maher ordinance #155-13Details
install ul300 ansul fire systems to protect kitchen hoods and cooking equipment. ref#2014-0128-7270. n/a for the maher ordinance #155-13 | $12,000 |
| Jun 11, 2014 | Never finaled issued Jun 2014, no final | 665 Market St | street space w/mtaDetails
street space w/mta | ||
| May 27, 2014 | Never finaled filed May 2014, never issued | 665 Market St | non-structural vinyl logo graphic at door/window sign. n/a maher ordinanceDetails
non-structural vinyl logo graphic at door/window sign. n/a maher ordinance | $1,000 | |
| May 22, 2014 | Completed final sign-off Oct 2014 | 2 New Montgomery St | L.D. Strobel Co Ltd | verizon wireless is requesting permission to install 4 non-penetrating tripods on the roof of the palace hotel. three (3) of the tripods will have one (1) antenna & two (2) rru's & 1 tripod will have one two-foot microwave dish. power will come from the palace hotel from 6/1/2-14 to 6/30/2014.Details
verizon wireless is requesting permission to install 4 non-penetrating tripods on the roof of the palace hotel. three (3) of the tripods will have one (1) antenna & two (2) rru's & 1 tripod will have one two-foot microwave dish. power will come from the palace hotel from 6/1/2-14 to 6/30/2014. | $17,500 |
| Apr 9, 2014 | Completed final sign-off Jul 2014 | 665 Market St | Hilbers Inc. | revision to app#201401287270. change of duct type for kitchen exhaust duct only.n/a for the maher ordinance #155-13Details
revision to app#201401287270. change of duct type for kitchen exhaust duct only.n/a for the maher ordinance #155-13 | |
| Mar 28, 2014 | Completed final sign-off Jun 2014 | 665 Market St | Rcm Fire Protection Inc. | modify spprinkler system in new resturant adding 9 and relocating 29 sprinklers.Details
modify spprinkler system in new resturant adding 9 and relocating 29 sprinklers. | $9,000 |
| Mar 6, 2014 | Never finaled issued Mar 2014, no final | 665 Market St | street space and mta parkingDetails
street space and mta parking | ||
| Mar 4, 2014 | Never finaled issued Mar 2014, no final | 665 Market St | street spaceDetails
street space | ||
| Jan 28, 2014 | Completed final sign-off Jul 2014 | 665 Market St | Hilbers Inc. | t.i. for new restaurant, new kitchen, adding 2 new restrooms, partitions stair case, electrical, plumbing & mechanical. sprinkler & fire alarm under separate permits. no change to exterior. compliance with ord #155-13 not required.Details
t.i. for new restaurant, new kitchen, adding 2 new restrooms, partitions stair case, electrical, plumbing & mechanical. sprinkler & fire alarm under separate permits. no change to exterior. compliance with ord #155-13 not required. | $500,000 |
| Dec 31, 2013 | Completed final sign-off Sep 2015 | 2 New Montgomery St | Plant Construction Co, Lp | barrier removal, new compliant lift and ramp at entrance. maher n/a.Details
barrier removal, new compliant lift and ramp at entrance. maher n/a. | $50,000 |
| Dec 23, 2013 | Completed final sign-off Sep 2015 | 2 New Montgomery St | Plant Construction Co, Lp | no exterior work. renovation of 555 guestrms on floors 2-8 of the palace hotel. typical guestrm to receive new finishes, faucets and sinks. accessible upgrades to include path of travel, accessible and hearing impared dispension. new carpet and paint in corridors (compliance with maher ordinanceDetails
no exterior work. renovation of 555 guestrms on floors 2-8 of the palace hotel. typical guestrm to receive new finishes, faucets and sinks. accessible upgrades to include path of travel, accessible and hearing impared dispension. new carpet and paint in corridors (compliance with maher ordinance | $10,000,000 |
| Aug 21, 2013 | Completed final sign-off Feb 2014 | 2 New Montgomery St | interior remodel of 2 guestrooms (475 and 494) on th 4th fl. paint, braille plaque in corridor. includes new plumbing fixtures, furniture, finishes. mech systems to remainDetails
interior remodel of 2 guestrooms (475 and 494) on th 4th fl. paint, braille plaque in corridor. includes new plumbing fixtures, furniture, finishes. mech systems to remain | $80,000 | |
| Jul 24, 2013 | Completed final sign-off Apr 2015 | 2 New Montgomery St | Johnson Controls Inc. | voluntary head end upgrade. see approv pre appl ltr on pg fa0.01. upgrade (e)85/40 fms/fas sys to metasys bms&ifc 3030 facp.voluntary replace fire alarm control panel w/bms per sffd ab# 3.04.special insp req as per plans.Details
voluntary head end upgrade. see approv pre appl ltr on pg fa0.01. upgrade (e)85/40 fms/fas sys to metasys bms&ifc 3030 facp.voluntary replace fire alarm control panel w/bms per sffd ab# 3.04.special insp req as per plans. | $140,000 |
| Jun 14, 2013 | Completed final sign-off May 2014 | 645 Market St | San Francisco Commercial Builders Inc | finish off floor, smooth out walls, paint, handicap access security, electrical.Details
finish off floor, smooth out walls, paint, handicap access security, electrical. | $35,000 |
| Feb 28, 2013 | Completed final sign-off May 2015 | 2 New Montgomery St | Metropolitan Electrical Construction | a modification to an (e) unmanned telecommunication facility consisting of adding 5 new frp screens, paint & texture to match (e) building. maher ord n/a. interim controls per bos resolution #428-13.Details
a modification to an (e) unmanned telecommunication facility consisting of adding 5 new frp screens, paint & texture to match (e) building. maher ord n/a. interim controls per bos resolution #428-13. | $30,000 |
| Jan 7, 2013 | Completed final sign-off May 2013 | 2 New Montgomery St | Station 1 Fire Protection | ground floor, upgraded ansul fire system to ul-300.Details
ground floor, upgraded ansul fire system to ul-300. | $15,000 |
| Oct 26, 2012 | Completed final sign-off Feb 2014 | 2 New Montgomery St | Metropolitan Electrical Construction | a new unmanned telecom facility consisting of a new 17'-3"x21'6"(370 sq ft) at & t lease area with one new battery rack and one new arbus power plant. 3 new 19" equipment racks, 2 new das equipment racks, 6 new rru's, 33 new remote units, and 190 new antennas.Details
a new unmanned telecom facility consisting of a new 17'-3"x21'6"(370 sq ft) at & t lease area with one new battery rack and one new arbus power plant. 3 new 19" equipment racks, 2 new das equipment racks, 6 new rru's, 33 new remote units, and 190 new antennas. | $125,000 |
| Sep 5, 2012 | Expired or cancelled cancelled Jul 2015 | 2 New Montgomery St | 7 vinyl, non electric, window graphics applied inside of window glass.Details
7 vinyl, non electric, window graphics applied inside of window glass. | $600 | |
| Jul 18, 2012 | Never finaled issued Jul 2012, no final | 2 New Montgomery St | street spaceDetails
street space | ||
| Jul 18, 2012 | Completed final sign-off Oct 2012 | 2 New Montgomery St | Potter Fire Protection | relocate (21), add (2) and plug (5) fire sprinklers.Details
relocate (21), add (2) and plug (5) fire sprinklers. | $10,000 |
| Jun 26, 2012 | Never finaled issued Jun 2012, no final | 2 New Montgomery St | Johnson Controls Inc. | g/f ghiradelli/palace hotel - life safety add additional life/safety devices speakers/strobes, smoke detectors, pull stationDetails
g/f ghiradelli/palace hotel - life safety add additional life/safety devices speakers/strobes, smoke detectors, pull station | $7,500 |
| Jun 20, 2012 | Completed final sign-off Jun 2012 | 651 Market St | Signs America Inc Dba Sign A Rama | interior electric sign at storefrontDetails
interior electric sign at storefront | $2,000 |
| Jun 6, 2012 | Never finaled issued Jun 2012, no final | 2 New Montgomery St | Metropolitan Electrical Construction | a (n) unmanned telecom facility consisting of adding (n) rba-72 cabinet, bbu, (n) main panel, transformer, sub panel (2) (n) purcells, (5) (n) pbc-02, (14) (n) rrus. (2) (n) surge protector (2) 3578 cabinets, (8) (n) antennas, painte to match. revision to pa # 201011225443.Details
a (n) unmanned telecom facility consisting of adding (n) rba-72 cabinet, bbu, (n) main panel, transformer, sub panel (2) (n) purcells, (5) (n) pbc-02, (14) (n) rrus. (2) (n) surge protector (2) 3578 cabinets, (8) (n) antennas, painte to match. revision to pa # 201011225443. | $195,000 |
| May 10, 2012 | Completed final sign-off Oct 2012 | 2 New Montgomery St | Northern Sun Associates | non structural interior renovation of existing retail space. new lighting, plumbing, mech, ductwork, partitons, flooring, ceiling, millwork, soda foundation equipmentDetails
non structural interior renovation of existing retail space. new lighting, plumbing, mech, ductwork, partitons, flooring, ceiling, millwork, soda foundation equipment | $432,000 |
| Apr 27, 2012 | Completed final sign-off Jul 2012 | 651 Market St | Johnson Controls Inc. | street level - replace 2 smoke detectors & base with newer model, replace 3 strobe lights, add booster panel.Details
street level - replace 2 smoke detectors & base with newer model, replace 3 strobe lights, add booster panel. | $6,000 |
| Apr 25, 2012 | Never finaled issued Apr 2012, no final | 651 Market St | Potter Fire Protection | relocate (11) fire sprinklers.Details
relocate (11) fire sprinklers. | $5,000 |
| Mar 15, 2012 | Completed final sign-off Jun 2012 | 651 Market St | Northern Sun Associates | non- structural demolition, new ceiling, 2 non structural partition walls and new finishes and lighting. upgrade bathroom to ada compliance.Details
non- structural demolition, new ceiling, 2 non structural partition walls and new finishes and lighting. upgrade bathroom to ada compliance. | $140,000 |
| Feb 9, 2012 | Completed final sign-off Oct 2012 | 2 New Montgomery St | Johnson Controls Inc. | add 2 duct detectors to fan coil unitsDetails
add 2 duct detectors to fan coil units | $5,000 |
| Jan 25, 2012 | Expired or cancelled cancelled Sep 2012 | 651 Market St | Signs America Inc Dba Sign A Rama | install (1) illuminated letter on aluminum panel. install over front entrance.Details
install (1) illuminated letter on aluminum panel. install over front entrance. | $1,500 |
| Nov 18, 2011 | Expired or cancelled withdrawn Apr 2022 | 2 New Montgomery St | interior work only - new 17'3" x 21'6" lease area, 3206 (f) 3206 rbs cabinet, new battery rack, (1) new argus power plant, (3) new 19" racks, new das equipment cabients, (6) rru's, (1) new ppc, new transformer, (1) sub panel & (264)new 4" antenna nodes. all equipment to be in basement thru bldg.Details
interior work only - new 17'3" x 21'6" lease area, 3206 (f) 3206 rbs cabinet, new battery rack, (1) new argus power plant, (3) new 19" racks, new das equipment cabients, (6) rru's, (1) new ppc, new transformer, (1) sub panel & (264)new 4" antenna nodes. all equipment to be in basement thru bldg. | $125,000 | |
| Nov 15, 2011 | Completed final sign-off Dec 2011 | 2 New Montgomery St | Anderson, Rowe & Buckley, Inc. | install new type 1 hood, modify extg grease duct, install new ef for employee kitchen in basement. separate permit is required for hood and duct suppression systemDetails
install new type 1 hood, modify extg grease duct, install new ef for employee kitchen in basement. separate permit is required for hood and duct suppression system | $18,000 |
| Oct 27, 2011 | Completed final sign-off Dec 2011 | 2 New Montgomery St | International Fire Equip | basement level-install ul 300 fire system. fire alarm sparate permitDetails
basement level-install ul 300 fire system. fire alarm sparate permit | $4,500 |
| Aug 23, 2011 | Never finaled issued Aug 2011, no final | 2 New Montgomery St | Anderson, Rowe & Buckley, Inc. | 2nd floor-replace 2 (e) fan coils, add economizer & duct workDetails
2nd floor-replace 2 (e) fan coils, add economizer & duct work | $35,000 |
| Nov 22, 2010 | Completed final sign-off Sep 2012 | 2 New Montgomery St | Metropolitan Electrical Construction | a (n)unmanned telecommunication facility consisting of (8)(n) rds cabinets, (6)(n) rrun's, (12)(n) rruw's (6)(n) rrh's, and (12)(n) at&t antennas painted to match (e) penthouse.Details
a (n)unmanned telecommunication facility consisting of (8)(n) rds cabinets, (6)(n) rrun's, (12)(n) rruw's (6)(n) rrh's, and (12)(n) at&t antennas painted to match (e) penthouse. | $195,000 |
| Jan 22, 2010 | Never finaled issued Oct 2010, no final | 2 New Montgomery St | Cintas Fire Protection | 3rd floor -as builts to fire system upgrade. ref. appl. 200903134092.Details
3rd floor -as builts to fire system upgrade. ref. appl. 200903134092. | $500 |
| Mar 13, 2009 | Never finaled issued Mar 2009, no final | 2 New Montgomery St | Cintas Fire Protection | upgrade ansul fire system to ul-300 on 3rd flr.Details
upgrade ansul fire system to ul-300 on 3rd flr. | $8,650 |
| Nov 20, 2000 | Expired or cancelled expired May 2001 | 2 New Montgomery St | street spaceDetails
street space | ||
| Aug 15, 2000 | Expired or cancelled expired Feb 2004 | 645 Market St | interior tentant improvement soffit at storefront add some recps painting at ground floor locationDetails
interior tentant improvement soffit at storefront add some recps painting at ground floor location | $12,000 | |
| Jan 25, 2000 | Completed final sign-off Jan 2001 | 2 New Montgomery St | Arrow Sign Company | single-faced electrical roof signDetails
single-faced electrical roof sign | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.