Arne Halterman
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Halterman Engineering
- Based in
- Montara
- On San Francisco permits
- Apr 2019 to Aug 2026
32 permits since 2000 (engineer on 31 permits, architect on 1 permit, authorized agent-others on 1 permit): 16 completed, 5 in progress, 5 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Aug 2026 | 4365 23rd St | Siena Pacific, Inc. | earth shoring plan as per requirement stated on pa# 202409060254.Details
earth shoring plan as per requirement stated on pa# 202409060254. | $1,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 625 Leavenworth St | Covenant Construction & Design Inc | repair facade/exterior concrete repair/sprawlingDetails
repair facade/exterior concrete repair/sprawling | $70,000 |
| May 28, 2026 | In progress issued May 2026 | 2504 Jackson St | Fahan Construction Inc | adding scope to existing job card 202605141246 adding concrete walls and base to existing sump pump pit and install catch basinDetails
adding scope to existing job card 202605141246 adding concrete walls and base to existing sump pump pit and install catch basin | $12,000 |
| Jan 14, 2026 | In progress issued Apr 2026 | 3646 21st St | Matarozzi/Pelsinger Builders Inc. | erect 4-story over basement, type vb, 2-unit residential building.Details
erect 4-story over basement, type vb, 2-unit residential building. | $2,500,000 |
| Dec 19, 2025 | Completed final sign-off Jun 2026 | 2 05th Av | Eastwood Development Incorporated | replace portion of side brick retaining wall in like kind.Details
replace portion of side brick retaining wall in like kind. | $12,000 |
| Jun 24, 2025 | In progress issued Jun 2025 | 200 Joost Av | Cs Construction Co | temporary shoring plan for permit #2024-0904-0055.Details
temporary shoring plan for permit #2024-0904-0055. | $20,000 |
| Sep 5, 2024 | Expired or cancelled withdrawn Nov 2024 | 2430 Pacific Av | shoring for rear yard excacation, underpinning (e) masonry bearing wallDetails
shoring for rear yard excacation, underpinning (e) masonry bearing wall | $35,000 | |
| May 20, 2024 | Completed final sign-off Apr 2026 | 2780 Broadway | Matarozzi/Pelsinger Builders Inc. | ref 202207118169- shoring for hand dug pits at rear of propertyDetails
ref 202207118169- shoring for hand dug pits at rear of property | $10,000 |
| Dec 15, 2023 | Completed final sign-off May 2024 | 434 Arch St | new concrete site wall in the backyard of the property along the south property line.Details
new concrete site wall in the backyard of the property along the south property line. | $50,000 | |
| Oct 18, 2023 | Completed final sign-off Feb 2024 | 335 Powell St | Marchetti Group | structural support of ceiling, wall & door assembly at hotel entrance. this new enclosure is supported by 2 floor assembly. the main structure of the assembly is made up of hss beams and columns, using ordinary steel moment frame connecting for 2 lateral support of the assembly. ref pa# 202209152520Details
structural support of ceiling, wall & door assembly at hotel entrance. this new enclosure is supported by 2 floor assembly. the main structure of the assembly is made up of hss beams and columns, using ordinary steel moment frame connecting for 2 lateral support of the assembly. ref pa# 202209152520 | $25,000 |
| Jul 12, 2023 | Completed final sign-off Feb 2024 | 1580 Masonic Av | Saturn Construction Co | replacing existing deck. add shed.Details
replacing existing deck. add shed. | $20,000 |
| Jul 11, 2023 | Completed final sign-off Sep 2025 | 2 New Montgomery St | Marchetti Group | revision to pa#202104148558, defferred structural engineering & special inspections. add exterior security fence at ground fl along annie st to enclose 855 sf of existing open sidewalk.Details
revision to pa#202104148558, defferred structural engineering & special inspections. add exterior security fence at ground fl along annie st to enclose 855 sf of existing open sidewalk. | |
| Jun 5, 2023 | Expired or cancelled cancelled Jan 2026 | 2814 Clay St | G B U Construction Development | shoring plans soliter piles. unit legalization under pa# 202106182818Details
shoring plans soliter piles. unit legalization under pa# 202106182818 | $30,000 |
| May 11, 2023 | Never finaled issued Jun 2023, no final | 3669 21st St | Moroso Construction Inc | revision to 2020122817721 s1 shorning design revisionsDetails
revision to 2020122817721 s1 shorning design revisions | |
| Mar 24, 2023 | Completed final sign-off Dec 2023 | 2640 Judah St | Anthony John Najib Batshon | fire damage repair to 2nd fl residential & 1st fl office. 1 apartment is a completed repair of all finishes, fixtures. unit 2 is new ceiling, new roofinhg, 15% of roof. 1 st fl ceiling to be replaced. to comply w/ nov 202288032Details
fire damage repair to 2nd fl residential & 1st fl office. 1 apartment is a completed repair of all finishes, fixtures. unit 2 is new ceiling, new roofinhg, 15% of roof. 1 st fl ceiling to be replaced. to comply w/ nov 202288032 | $280,000 |
| Mar 22, 2023 | Completed final sign-off Jan 2025 | 3570 21st St | Upscale Construction Inc. | new outdoor pg&e alcove with new gate for access. new relocated retaining wall.Details
new outdoor pg&e alcove with new gate for access. new relocated retaining wall. | $100,000 |
| Aug 8, 2022 | Never finaled issued Oct 2022, no final | 255 Eureka St | Francis Mullan Construction | remodel of basement level constructing w/ new interior stair to level 2 which included new media, new l/r, new office & new bath. no exterior workDetails
remodel of basement level constructing w/ new interior stair to level 2 which included new media, new l/r, new office & new bath. no exterior work | $45,732 |
| Jun 21, 2022 | Expired or cancelled cancelled Mar 2025 | 25 Woodland Av | Division Sf Inc Dba: Hawke Bldg Company | voluntary structural upgrade to provide foundation bolting and lateral strengthening at 1st fl.Details
voluntary structural upgrade to provide foundation bolting and lateral strengthening at 1st fl. | $15,000 |
| May 19, 2022 | Completed final sign-off Feb 2024 | 450 Sutter St | Derry Casey Builders Inc | 26/f provide new operating room, private pre-op/recovery room, pre-op/recovery area, soiled holding room and medgas room on the 26th floor.Details
26/f provide new operating room, private pre-op/recovery room, pre-op/recovery area, soiled holding room and medgas room on the 26th floor. | $571,360 |
| Feb 3, 2022 | Completed final sign-off Jul 2024 | 166 Woodland Av | Design Line Construction | the work illustrated herein is for the earth shoring of the subject property for the proposed excavation and building renovation.Details
the work illustrated herein is for the earth shoring of the subject property for the proposed excavation and building renovation. | $200,000 |
| Nov 17, 2021 | Completed final sign-off Jun 2022 | 2254 Union St | Arrow Builders Inc | reconstruct front balcony in kindDetails
reconstruct front balcony in kind | $5,000 |
| Oct 12, 2021 | Expired or cancelled cancelled Jan 2026 | 450 Sutter St | ste 2632 - providing a new operating room, private pre-op/recovery room, pre-op/recovery room, soiled holding and med gas roomDetails
ste 2632 - providing a new operating room, private pre-op/recovery room, pre-op/recovery room, soiled holding and med gas room | $571,360 | |
| Sep 20, 2021 | Completed final sign-off May 2025 | 457 Diamond St | Andrew Gallagher Construction, Beyond The Horizon Construction | one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1.Details
one story horizontal addition. (n) bedrooms (2) ground floor level 1. addition of interior stair from level to level 2.(n) bathroom @ level 1. | $500,000 |
| Jul 8, 2021 | Expired or cancelled withdrawn Nov 2021 | 254 32nd Av | horizontal addition at first story. relocate kitchen. new appliances, plumbing, and finishes. new 1/2 bath. new deck and stair at rear yard. excavate basement level at rear yardDetails
horizontal addition at first story. relocate kitchen. new appliances, plumbing, and finishes. new 1/2 bath. new deck and stair at rear yard. excavate basement level at rear yard | $175,000 | |
| Dec 28, 2020 | Never finaled issued Apr 2022, no final | 3669 21st St | Green Gate Energy Solutions Llc, Moroso Construction Inc | erect 3-story single family resident.Details
erect 3-story single family resident. | $1,947,900 |
| Oct 24, 2020 | Completed final sign-off Feb 2021 | 450 Sutter St | Peacock Construction | suite 2632: provide new ups inverter unit in tenant space. upgrade push plate in all-gender toilet room on the floor.Details
suite 2632: provide new ups inverter unit in tenant space. upgrade push plate in all-gender toilet room on the floor. | $100,000 |
| Sep 12, 2020 | Expired or cancelled expired Sep 2022 | 864 Francisco St | Siteworks Landscape Inc. | landscape revision to 201910316111. changes at the water feature, west fences, entry walkway, retaining wall at the east property line, and the cmu wall and art plinth in the north yard.Details
landscape revision to 201910316111. changes at the water feature, west fences, entry walkway, retaining wall at the east property line, and the cmu wall and art plinth in the north yard. | |
| Jul 21, 2020 | Completed final sign-off Mar 2023 | 2467 Pacific Av | Design Line Construction | excavatoin shoring to pa 2019-1016-4578 work includes: 1. foundation system revised to mat slab at level 2. shoring design proposed @ basement excavation.Details
excavatoin shoring to pa 2019-1016-4578 work includes: 1. foundation system revised to mat slab at level 2. shoring design proposed @ basement excavation. | |
| Feb 6, 2020 | Never finaled issued Feb 2020, no final | 3455 Washington St | Farallon General Contractors Inc. | earth shoring of the subject property for the propsed basement excavation under pa #201911086857. maher na. (maher under #201911086857)Details
earth shoring of the subject property for the propsed basement excavation under pa #201911086857. maher na. (maher under #201911086857) | |
| Dec 12, 2019 | Never finaled issued Jan 2020, no final | 2509 Pacific Av | Mrcc | soil shoring @ west property line. ref pa# 2018/05/16/9267.Details
soil shoring @ west property line. ref pa# 2018/05/16/9267. | $40,000 |
| Oct 7, 2019 | Completed final sign-off Apr 2022 | 2510 Green St | Farallon General Contractors Inc. | hand-dug piers and earth shoring for the underground excavation for the renovation at the subject property. the work illustrated herein is for the shoring of the subject property.Details
hand-dug piers and earth shoring for the underground excavation for the renovation at the subject property. the work illustrated herein is for the shoring of the subject property. | $75,000 |
| Apr 12, 2019 | Completed final sign-off Dec 2020 | 2747 Vallejo St | The Toboni Group | construct temporary earth shoring during excavation of rear elevator shaftDetails
construct temporary earth shoring during excavation of rear elevator shaft |