Tansy M. Bowermaster
- License
- C30446
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- The Stinnett Group Llp
- On San Francisco permits
- Oct 2020 to Feb 2023
5 permits since 2000 (architect on 5 permits): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Derry Casey Builders Inc (2), Peacock Construction (2)
- Engineers
- Matthew Denny (4), Arne Halterman (3), David Johnson (3)
- Authorized agents
- James Mccann (2)
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2023 | Completed final sign-off Feb 2024 | 450 Sutter St | Derry Casey Builders Inc | 26/f: revision to pa# 202205194637. new exam room, new restroom, new utility room. reorganize pre-op room layout.Details
26/f: revision to pa# 202205194637. new exam room, new restroom, new utility room. reorganize pre-op room layout. | $50,000 |
| May 19, 2022 | Completed final sign-off Feb 2024 | 450 Sutter St | Derry Casey Builders Inc | 26/f provide new operating room, private pre-op/recovery room, pre-op/recovery area, soiled holding room and medgas room on the 26th floor.Details
26/f provide new operating room, private pre-op/recovery room, pre-op/recovery area, soiled holding room and medgas room on the 26th floor. | $571,360 |
| Oct 12, 2021 | Expired or cancelled cancelled Jan 2026 | 450 Sutter St | ste 2632 - providing a new operating room, private pre-op/recovery room, pre-op/recovery room, soiled holding and med gas roomDetails
ste 2632 - providing a new operating room, private pre-op/recovery room, pre-op/recovery room, soiled holding and med gas room | $571,360 | |
| Dec 8, 2020 | Completed final sign-off Dec 2021 | 450 Sutter St | Peacock Construction | suite (#1212): new ups inverter unit & scrub sink. replacing sink to medical gas cabinet, providing new flooring; updated scope to eliminate portion of work related to previously propose medical gas cabinet work, dmj 03/12/2021;Details
suite (#1212): new ups inverter unit & scrub sink. replacing sink to medical gas cabinet, providing new flooring; updated scope to eliminate portion of work related to previously propose medical gas cabinet work, dmj 03/12/2021; | $179,000 |
| Oct 24, 2020 | Completed final sign-off Feb 2021 | 450 Sutter St | Peacock Construction | suite 2632: provide new ups inverter unit in tenant space. upgrade push plate in all-gender toilet room on the floor.Details