Block 0303, lot 002
625 Leavenworth St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 6
- Units
- 33
- Rooms
- 10 bedrooms, 33 bathrooms
- Building
- 20,630 sq ft
- Lot
- 5,156 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 625 Leavenworth St | Covenant Construction & Design Inc | repair facade/exterior concrete repair/sprawlingDetails
repair facade/exterior concrete repair/sprawling | $70,000 |
| Jun 2, 2025 | Completed final sign-off Nov 2025 | 625 Leavenworth St | Aura Fire Safety | as-builts for permit# 202407166550: add modules for elevator connection.Details
as-builts for permit# 202407166550: add modules for elevator connection. | |
| Jul 16, 2024 | Completed final sign-off Nov 2025 | 625 Leavenworth St | Aura Fire Safety | upgrade fire alarm system to comply with 1103.7.6.1 and bring alarm to 2022 sffc requirements.Details
upgrade fire alarm system to comply with 1103.7.6.1 and bring alarm to 2022 sffc requirements. | $75,438 |
| Jan 7, 2020 | Completed final sign-off Apr 2020 | 625 Leavenworth St | unit 504 kitchen 5'x10' and bathroom 5'x8' remodel, in-kindDetails
unit 504 kitchen 5'x10' and bathroom 5'x8' remodel, in-kind | $14,000 | |
| Nov 5, 2019 | Completed final sign-off Jan 2020 | 625 Leavenworth St | kitchen and bathroom remodel in like kind. work in unit #501.Details
kitchen and bathroom remodel in like kind. work in unit #501. | $4,000 | |
| Dec 12, 2018 | Completed final sign-off Jun 2019 | 625 Leavenworth St | unit # 506: remodle kitchen and bathroom in kind. like for like. apporx 8x10 and 5x8 bahtroom. no change in layout, no structural work, no other work.Details
unit # 506: remodle kitchen and bathroom in kind. like for like. apporx 8x10 and 5x8 bahtroom. no change in layout, no structural work, no other work. | $15,000 | |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 625 Leavenworth St | street spaceDetails
street space | ||
| Aug 17, 2018 | Never finaled issued Aug 2018, no final | 625 Leavenworth St | street spaceDetails
street space | ||
| Aug 9, 2018 | Never finaled issued Aug 2018, no final | 625 Leavenworth St | street spaceDetails
street space | ||
| Jul 17, 2018 | Completed final sign-off Sep 2018 | 625 Leavenworth St | #101 - rev to applicaiton 2017 0928 9858 to increase costDetails
#101 - rev to applicaiton 2017 0928 9858 to increase cost | $10,000 | |
| Sep 28, 2017 | Completed final sign-off Sep 2018 | 625 Leavenworth St | kitchen & bathroom remodel in like kind unit # 101Details
kitchen & bathroom remodel in like kind unit # 101 | $20,000 | |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 625 Leavenworth St | street spaceDetails
street space | ||
| May 24, 2012 | Completed final sign-off Aug 2012 | 625 Leavenworth St | # 206: kitchen and bathroom (in like kind) - no structural (1 bed apt): replace counters and cabinets in kitchen. replace counter in bathroom / new fixtures/ hardware.Details
# 206: kitchen and bathroom (in like kind) - no structural (1 bed apt): replace counters and cabinets in kitchen. replace counter in bathroom / new fixtures/ hardware. | $15,000 | |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 625 Leavenworth St | new kitchen cabinets, new kitchen counter, remove caprets, redo hardwood floor. new tile in bath surround and fixtures. new light fixtures,switches for existing wiring. kitchen at least 50% high eff by wattage. bath: high eff lighting. no change to exhaust system. in like kind, no structural workDetails
new kitchen cabinets, new kitchen counter, remove caprets, redo hardwood floor. new tile in bath surround and fixtures. new light fixtures,switches for existing wiring. kitchen at least 50% high eff by wattage. bath: high eff lighting. no change to exhaust system. in like kind, no structural work | $20,000 | |
| Apr 4, 2012 | Never finaled filed Apr 2012, never issued | 625 Leavenworth St | #404- new kitchen cabinets, new kitchen counter, remove carpet & redo hardwood floor, new tile in bathroom surround & fixtures, new light fixtures & switches for existing wiring. kitchen: at least 50%high efficiency lighting (by wattage) bathroom: high efficiency lighting. no change to exhaust sysDetails
#404- new kitchen cabinets, new kitchen counter, remove carpet & redo hardwood floor, new tile in bathroom surround & fixtures, new light fixtures & switches for existing wiring. kitchen: at least 50%high efficiency lighting (by wattage) bathroom: high efficiency lighting. no change to exhaust sys | $20,000 | |
| Feb 7, 2012 | Completed final sign-off Mar 2012 | 625 Leavenworth St | # 103:addition to scope of work for permit #201201232716. one kitchen remodel. all new plumbing and electrical. new tile flooring. new cabinets and counter. new light fixtures. lighting to comply with cec 150 ck. no change to exhaust system.Details
# 103:addition to scope of work for permit #201201232716. one kitchen remodel. all new plumbing and electrical. new tile flooring. new cabinets and counter. new light fixtures. lighting to comply with cec 150 ck. no change to exhaust system. | $15,000 | |
| Jan 23, 2012 | Completed final sign-off Mar 2012 | 625 Leavenworth St | unit #103: bathrm remodel in like kind, new plumbing & electrical in bathrm, new energy efficient light fixtures with high efficency occupancy sensor, all new plumbign fixtures, lighting to comply with cec 150(k)Details
unit #103: bathrm remodel in like kind, new plumbing & electrical in bathrm, new energy efficient light fixtures with high efficency occupancy sensor, all new plumbign fixtures, lighting to comply with cec 150(k) | $15,000 | |
| Dec 12, 2011 | Completed final sign-off Feb 2012 | 625 Leavenworth St | #406 - renovate kitchen & bathroom in like, upgrade apartment electrical wiring & plumbing, new bathroom tile surround & fixtures. high efficency occupancy sensor, new kitchen counter, refinish hardwood floors, no change to existing walls & exhaust system. lighting to comply with cec150(k)Details
#406 - renovate kitchen & bathroom in like, upgrade apartment electrical wiring & plumbing, new bathroom tile surround & fixtures. high efficency occupancy sensor, new kitchen counter, refinish hardwood floors, no change to existing walls & exhaust system. lighting to comply with cec150(k) | $25,000 | |
| May 26, 2011 | Completed final sign-off Jul 2011 | 625 Leavenworth St | #605- update kitchen cabinets & counter. (n) bathroom surround, remove carpet & refinish hardwood flrs. (n) light fixtures, no rough plumbing only finish plumbing. kitchen 50% high efficacy lights. bathroo; high efficacy occupancy sensor, no change to exhaust system.Details
#605- update kitchen cabinets & counter. (n) bathroom surround, remove carpet & refinish hardwood flrs. (n) light fixtures, no rough plumbing only finish plumbing. kitchen 50% high efficacy lights. bathroo; high efficacy occupancy sensor, no change to exhaust system. | $20,000 | |
| Apr 26, 2011 | Completed final sign-off Jun 2011 | 625 Leavenworth St | #402- new kitchen cabinets, new kitchen counter & bathroom surround, remove carpet & re-finish hardwood floors, new light fixtures, no rough plumbing work, only finish plumbing. kitchen: 50% high efficeacy lighting. bathroom: high efficacy occupancy sensor to be installed. no change to exhaust sys.Details
#402- new kitchen cabinets, new kitchen counter & bathroom surround, remove carpet & re-finish hardwood floors, new light fixtures, no rough plumbing work, only finish plumbing. kitchen: 50% high efficeacy lighting. bathroom: high efficacy occupancy sensor to be installed. no change to exhaust sys. | $20,000 | |
| Apr 26, 2011 | Completed final sign-off Jun 2011 | 625 Leavenworth St | #303- new kitchen cabinets, new kitchen counters & bathroom surround. remove carpet & re-finish hardwood floors. new light fixtures. no rough plumbing work, only finish plumbing. kitchen: 50% high efficacy lighting. b athroom: high efficacy occupancy sensor to be installed. no change to exhaust sys.Details
#303- new kitchen cabinets, new kitchen counters & bathroom surround. remove carpet & re-finish hardwood floors. new light fixtures. no rough plumbing work, only finish plumbing. kitchen: 50% high efficacy lighting. b athroom: high efficacy occupancy sensor to be installed. no change to exhaust sys. | $20,000 | |
| Sep 9, 2010 | Completed final sign-off Feb 2011 | 625 Leavenworth St | unit#502: (n) kitchen cabinets, countertops, remove carpet & redo hardwood floors, (n) tile in bathroom surround. (n) light fixtures. kitchen @ least 50% high efficiency lighting(by wattage). bathroom: high efficiency occupancy sensor. no change to exhaust system. no window, door & wall work.Details
unit#502: (n) kitchen cabinets, countertops, remove carpet & redo hardwood floors, (n) tile in bathroom surround. (n) light fixtures. kitchen @ least 50% high efficiency lighting(by wattage). bathroom: high efficiency occupancy sensor. no change to exhaust system. no window, door & wall work. | $20,000 | |
| Aug 26, 2010 | Completed final sign-off Feb 2011 | 625 Leavenworth St | unit #403 on the 4th fl. new kitchen cabinet and counter. new tiles in bathrm, new light fixtures and switches, eexisting wiring. kitchen: at least 50% high efficiency lighting by wattage. bathrm: high efficiency on occupancy sensor. no change to (e) wexhausr systemDetails
unit #403 on the 4th fl. new kitchen cabinet and counter. new tiles in bathrm, new light fixtures and switches, eexisting wiring. kitchen: at least 50% high efficiency lighting by wattage. bathrm: high efficiency on occupancy sensor. no change to (e) wexhausr system | $20,000 | |
| Apr 6, 2010 | Completed final sign-off Apr 2010 | 625 Leavenworth St | work @ unit# 606 only. to comply with bid nov# 200901941; cosmetic remodel, new cabinets, new counters, built-ins to stay, no plumbing or electrical, new tile behind bath. no structural.Details
work @ unit# 606 only. to comply with bid nov# 200901941; cosmetic remodel, new cabinets, new counters, built-ins to stay, no plumbing or electrical, new tile behind bath. no structural. | $5,000 | |
| Apr 6, 2010 | Completed final sign-off Apr 2010 | 625 Leavenworth St | work @ unit# 602 only. to comply with bid nov# 200901941; cosmetic remodel, new cabinets, new counters, built-ins to stay, no plumbing or electrical, new tile behind bath. no structural.Details
work @ unit# 602 only. to comply with bid nov# 200901941; cosmetic remodel, new cabinets, new counters, built-ins to stay, no plumbing or electrical, new tile behind bath. no structural. | $5,000 | |
| Feb 11, 2010 | Completed final sign-off Jul 2010 | 625 Leavenworth St | unit# 306 on 3rd floor. new plumbing and electrical through out entire unit. ne abathrm floor, tub and surround and vanity. new kitchen fl and counter tops, cabs, new light fixtures and receptacle. kitchen and bath remodel in kind. no wall removal.Details
unit# 306 on 3rd floor. new plumbing and electrical through out entire unit. ne abathrm floor, tub and surround and vanity. new kitchen fl and counter tops, cabs, new light fixtures and receptacle. kitchen and bath remodel in kind. no wall removal. | $20,000 | |
| Feb 11, 2010 | Completed final sign-off Jul 2010 | 625 Leavenworth St | unit 401 on 4th floor. re do hardwood floors, new tile floor in kitchen, new light fixtures, new counter tops, new tile at bathroom surround. no wall removal/Details
unit 401 on 4th floor. re do hardwood floors, new tile floor in kitchen, new light fixtures, new counter tops, new tile at bathroom surround. no wall removal/ | $10,000 | |
| May 19, 2009 | Completed final sign-off May 2010 | 625 Leavenworth St | to obtain final inspection for work approved under pa#200707237500. all work is complete.Details
to obtain final inspection for work approved under pa#200707237500. all work is complete. | ||
| May 19, 2009 | Completed final sign-off May 2010 | 625 Leavenworth St | to obtain final inspection for work approved under pa#200707096310. all work is complete.Details
to obtain final inspection for work approved under pa#200707096310. all work is complete. | ||
| Sep 19, 2008 | Completed final sign-off Mar 2009 | 625 Leavenworth St | work on unit#304 only. replace kitchen and work on unit#304 only. bathroom-remodel in like kind.Details
work on unit#304 only. replace kitchen and work on unit#304 only. bathroom-remodel in like kind. | $15,000 | |
| Jul 23, 2007 | Completed final sign-off May 2010 | 625 Leavenworth St | unit #205 & 603: remodel 1 kitchen 1 bath in each unit. no structural, (e) lighting to remain & plumbing (e) built in to stay. built in shower units @ bath.Details
unit #205 & 603: remodel 1 kitchen 1 bath in each unit. no structural, (e) lighting to remain & plumbing (e) built in to stay. built in shower units @ bath. | $10,000 | |
| Jul 9, 2007 | Completed final sign-off May 2010 | 625 Leavenworth St | unit #405 & #604. new cabinets/counter tops in kitchen built-in to stay - no plumbing/electrical, new tile behind tub in bath. no structural work.Details
unit #405 & #604. new cabinets/counter tops in kitchen built-in to stay - no plumbing/electrical, new tile behind tub in bath. no structural work. | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aura Fire Safety (2), Covenant Construction & Design Inc
- Engineers
- Arne Halterman
- Designers
- Lauren (Lo) Alayne Choe