Anne Fougeron
- Listed as
- architect
- Firm
- Fougeron Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2008 to Feb 2026
20 permits since 2000 (architect on 20 permits): 11 completed, 3 in progress, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 25, 2026 | In progress issued Mar 2026 | 35 Moulton St | Nima Construction | upper unit (3rd & 4th fl)- replace & repair (2) aluminum windows and (5) skylights in-kind; remodel/update (2) bathrooms & (1) kitchen in-kind; replace furnace and water heater and replace lighting in-kind; no structural work.Details
upper unit (3rd & 4th fl)- replace & repair (2) aluminum windows and (5) skylights in-kind; remodel/update (2) bathrooms & (1) kitchen in-kind; replace furnace and water heater and replace lighting in-kind; no structural work. | $492,079 |
| May 21, 2025 | In progress issued May 2025 | 585 Connecticut St | Nima Construction | revision to pa # 202103166680: update the property line retaining wall detail at gridline 1.Details
revision to pa # 202103166680: update the property line retaining wall detail at gridline 1. | |
| Jan 10, 2025 | In progress issued Jan 2025 | 585 Connecticut St | revision to 202103166680: remove fire sprinklers from project scope. sprinklers not required.Details
revision to 202103166680: remove fire sprinklers from project scope. sprinklers not required. | ||
| Oct 23, 2023 | Expired or cancelled suspend Sep 2025 | 589 Connecticut St | remodel (e) 2-unit building including a horizontal addition at the rear, conversion of the (e) unconditioned basement to habitable space, expansion of a portion of the 1st floor to accommodate a new entry for the lower unit, and upgrade of all building systems.Details
remodel (e) 2-unit building including a horizontal addition at the rear, conversion of the (e) unconditioned basement to habitable space, expansion of a portion of the 1st floor to accommodate a new entry for the lower unit, and upgrade of all building systems. | $700,000 | |
| Aug 10, 2022 | Completed final sign-off Sep 2022 | 864 Francisco St | Siteworks Landscape Inc. | revision to pa 202203170283 to add handrail to stair in rear yard to and stucco front yard brick wall.Details
revision to pa 202203170283 to add handrail to stair in rear yard to and stucco front yard brick wall. | $2,000 |
| Mar 17, 2022 | Completed final sign-off Oct 2022 | 864 Francisco St | Siteworks Landscape Inc. | rev to pa 201910316111 and 202009124076. revised layout of turf, north yard planting and details per plan.Details
rev to pa 201910316111 and 202009124076. revised layout of turf, north yard planting and details per plan. | |
| Sep 12, 2020 | Expired or cancelled expired Sep 2022 | 864 Francisco St | Siteworks Landscape Inc. | landscape revision to 201910316111. changes at the water feature, west fences, entry walkway, retaining wall at the east property line, and the cmu wall and art plinth in the north yard.Details
landscape revision to 201910316111. changes at the water feature, west fences, entry walkway, retaining wall at the east property line, and the cmu wall and art plinth in the north yard. | |
| Nov 7, 2019 | Completed final sign-off Aug 2020 | 203 Willow St | Dermot Barry Construction | unit #202: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittalsDetails
unit #202: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittals | $75,000 |
| Nov 7, 2019 | Completed final sign-off Aug 2020 | 203 Willow St | Dermot Barry Construction | unit #203: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittalsDetails
unit #203: interior renovation of (e) business. new non structural partitions, floor, & lighting. relocation of existing sprinklers & ada compliance upgrades as reasonable & feasible. mech & sprinkler to be deferred submittals | $75,000 |
| Aug 1, 2018 | Expired or cancelled withdrawn Sep 2022 | 864 Francisco St | installation so below grade retaining wall with alcoves to contain new electric and gas metersDetails
installation so below grade retaining wall with alcoves to contain new electric and gas meters | $10,000 | |
| Nov 2, 2017 | Completed final sign-off Mar 2021 | 864 Francisco St | rev to approved shoroing pa201708023669. in response to bpa suspension the applicationhas been revised to include demo plans and calculations to meet sfdcp requirements. no change to previously approved structure. maher not req. no change to previously approved structuresDetails
rev to approved shoroing pa201708023669. in response to bpa suspension the applicationhas been revised to include demo plans and calculations to meet sfdcp requirements. no change to previously approved structure. maher not req. no change to previously approved structures | ||
| Jul 12, 2017 | Completed final sign-off Oct 2021 | 864 Francisco St | Upscale Construction Inc. | revision to appln #201404102975 lower garage level, expand sw corner of garage below grade, retain wine room, relocate guardrail, misc interior changes, replace wood deck w/ stone pavers. ** maher: n/a **Details
revision to appln #201404102975 lower garage level, expand sw corner of garage below grade, retain wine room, relocate guardrail, misc interior changes, replace wood deck w/ stone pavers. ** maher: n/a ** | $25,000 |
| Jul 6, 2017 | Completed final sign-off Jan 2020 | 695 Arkansas St | Young & Burton Inc | revision to pa 2014-1219-4172 in response to nov 201787491 to include additional demo to deal with poor constructabililty &/or fire rating non-complianceDetails
revision to pa 2014-1219-4172 in response to nov 201787491 to include additional demo to deal with poor constructabililty &/or fire rating non-compliance | $1,000 |
| Mar 7, 2017 | Expired or cancelled cancelled May 2025 | 739 De Haro St | remodel of an (e) single family home with a new 2nd floor addition & garage. 1 new bedroom & 1 new bathroom. upgrade of mechanical, electrical & structural systems. addition of new fire sprinkler system.Details
remodel of an (e) single family home with a new 2nd floor addition & garage. 1 new bedroom & 1 new bathroom. upgrade of mechanical, electrical & structural systems. addition of new fire sprinkler system. | $650,000 | |
| Jul 30, 2013 | Completed final sign-off May 2014 | 140 Geary St | Dermot Barry Construction | 8th floor:interior remodel of extg office space for use as an office space removal and construction of non structural interior walls, relocation of extg lighting. no new lights, ada compliance upgrade as reasonably feasible. no exterior work. no plmg work, no mechanical work. life safety separateDetails
8th floor:interior remodel of extg office space for use as an office space removal and construction of non structural interior walls, relocation of extg lighting. no new lights, ada compliance upgrade as reasonably feasible. no exterior work. no plmg work, no mechanical work. life safety separate | $90,000 |
| Apr 26, 2013 | Completed final sign-off Apr 2016 | 1532 Cole St | Scott & Warner Builders Inc | addition of new office space in rear yard below associated patio at natural grade (demo exterior rear wall)Details
addition of new office space in rear yard below associated patio at natural grade (demo exterior rear wall) | $300,000 |
| Dec 8, 2008 | Never finaled issued Dec 2008, no final | 1294 Potrero Av | tenant improvement/remodel of office area within existing good samaritan housing and family resource center at existing 3rd dloor level in group b areaDetails
tenant improvement/remodel of office area within existing good samaritan housing and family resource center at existing 3rd dloor level in group b area | $20,000 | |
| Dec 2, 2008 | Never finaled issued Dec 2008, no final | 421 Tehama St | structural work to be done. relocation of (e) stair, new column @ ground floor and new walkway @ 2nd floor. revision to application 200809262803.Details
structural work to be done. relocation of (e) stair, new column @ ground floor and new walkway @ 2nd floor. revision to application 200809262803. | $15,000 | |
| Nov 21, 2008 | Completed final sign-off Feb 2010 | 144 Elsie St | horizontal addition, second floor work includes: replace (e) windows @ dem area & remove (e) chimney. third floor work includes: (e) bathroom converted to a walk-in closet, (e) closet converted to vanity area & new master bathroom addition to be added on ne side of (e) master bedroom.Details
horizontal addition, second floor work includes: replace (e) windows @ dem area & remove (e) chimney. third floor work includes: (e) bathroom converted to a walk-in closet, (e) closet converted to vanity area & new master bathroom addition to be added on ne side of (e) master bedroom. | $60,000 | |
| Apr 18, 2008 | Completed final sign-off Apr 2010 | 3842 26th St | H Y Construction Inc. | front exterior stair reconfiguration. kithen at 1st floor to be remodeld. basement remodel. subterranean horizontal addition, within existing req rear yard at basementDetails
front exterior stair reconfiguration. kithen at 1st floor to be remodeld. basement remodel. subterranean horizontal addition, within existing req rear yard at basement | $375,000 |