Anthony John Najib Batshon
- Based in
- San Francisco
- On San Francisco permits
- Mar 2023 to Aug 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2025 | Completed final sign-off Sep 2025 | 2350 33rd Av | repair and paint siding and trim right side of the houseDetails
repair and paint siding and trim right side of the house | $3,000 |
| Jan 18, 2024 | Completed final sign-off Apr 2024 | 2644 Judah St | unit 2642: interior remodel: of kitchen replaced, bath remodel-fixtures replaced in place, new 100a electrical panel, replace 4 front windows in place.cDetails
unit 2642: interior remodel: of kitchen replaced, bath remodel-fixtures replaced in place, new 100a electrical panel, replace 4 front windows in place.c | $25,000 |
| Dec 6, 2023 | Completed final sign-off Dec 2023 | 2351 33rd Av | to comply w/nov #202315431: return dry duct to last legal conditon. dry vent termination on pipe line violation 502-2-1Details
to comply w/nov #202315431: return dry duct to last legal conditon. dry vent termination on pipe line violation 502-2-1 | $2,600 |
| May 23, 2023 | Completed final sign-off Dec 2023 | 2640 Judah St | revision to 2o damaged pocket door, relodcate w/d in existing closet area, move oven to opposite wall, relate, new elec for w/d oven,hood to roof. unit 2642 no revision to clg repair.no revision office ceiling repair 2644 scope. 2640 unit is revised in this app and damagedDetails
revision to 2o damaged pocket door, relodcate w/d in existing closet area, move oven to opposite wall, relate, new elec for w/d oven,hood to roof. unit 2642 no revision to clg repair.no revision office ceiling repair 2644 scope. 2640 unit is revised in this app and damaged | |
| Mar 24, 2023 | Completed final sign-off Dec 2023 | 2640 Judah St | fire damage repair to 2nd fl residential & 1st fl office. 1 apartment is a completed repair of all finishes, fixtures. unit 2 is new ceiling, new roofinhg, 15% of roof. 1 st fl ceiling to be replaced. to comply w/ nov 202288032Details
fire damage repair to 2nd fl residential & 1st fl office. 1 apartment is a completed repair of all finishes, fixtures. unit 2 is new ceiling, new roofinhg, 15% of roof. 1 st fl ceiling to be replaced. to comply w/ nov 202288032 | $280,000 |