Back to bathroom remodel contractors
Anthony John Najib Batshon
- Based in
- San Francisco
- On San Francisco permits
- Mar 2023 to Aug 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2024 | Completed final sign-off Apr 2024 | 2644 Judah St | unit 2642: interior remodel: of kitchen replaced, bath remodel-fixtures replaced in place, new 100a electrical panel, replace 4 front windows in place.cDetails
unit 2642: interior remodel: of kitchen replaced, bath remodel-fixtures replaced in place, new 100a electrical panel, replace 4 front windows in place.c | $25,000 |