Patric Darren Mcmurtrie
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Kohlmyer Designs
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Sep 2026
143 permits since 2000 (architect on 134 permits, authorized agent-others on 8 permits, engineer on 2 permits): 107 completed, 5 in progress, 10 never finaled, 21 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 143.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 266 Flournoy St | demo (e) type vb 1-story detached garage in frontDetails
demo (e) type vb 1-story detached garage in front | $8,000 | |
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 266 Flournoy St | new 2 story addition: new garage at the 1/f level w/ new living room at the 2/f. demolish (e) garage structure under separate permit.Details
new 2 story addition: new garage at the 1/f level w/ new living room at the 2/f. demolish (e) garage structure under separate permit. | $175,000 | |
| Sep 9, 2026 | In progress issued Sep 2026 | 1452 Clement St | Bao Hengda Inc | new infill building addition at existing first floor level. new sitting room, new windows. renovate existing first floor living room. renovate existing first floor bathroom.Details
new infill building addition at existing first floor level. new sitting room, new windows. renovate existing first floor living room. renovate existing first floor bathroom. | $150,000 |
| Jan 14, 2026 | Completed final sign-off Mar 2026 | 423 33rd Av | Armour Construction | revision to pa#202502120178. relocate access 45-min rated door from lightwell to corridor. change configuration of new elevator equipment roomDetails
revision to pa#202502120178. relocate access 45-min rated door from lightwell to corridor. change configuration of new elevator equipment room | $2,000 |
| Jan 6, 2026 | Completed final sign-off Jun 2026 | 2460 Francisco St | Jfieco | revision to 202310138648. remove existing exterior deck at east property line to comply with nov 202312133Details
revision to 202310138648. remove existing exterior deck at east property line to comply with nov 202312133 | $7,500 |
| Oct 27, 2025 | Completed final sign-off Feb 2026 | 323 Church St | Mrcc | scope of work at (e) third fl level (323 church). new interior wall system to create new home office nook, new built in desk and cabinetry, (e) bedroom 03 to remain.Details
scope of work at (e) third fl level (323 church). new interior wall system to create new home office nook, new built in desk and cabinetry, (e) bedroom 03 to remain. | $7,500 |
| Oct 17, 2025 | Completed final sign-off Apr 2026 | 426 Holloway Av | Olmec Builders Inc | notice of violation 2024-18795 for compliance. demolish existing bathroom. new storage room at demolished bathroom. no work at 2nd fl level.Details
notice of violation 2024-18795 for compliance. demolish existing bathroom. new storage room at demolished bathroom. no work at 2nd fl level. | $2,000 |
| Sep 22, 2025 | In progress issued Aug 2026 | 54 Sussex St | Mrcc | new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovationsDetails
new two story horizontal addition at rear yard, new media room and bathroom at basement level, new second story vertical addition: primary bedroom and bathroom, new exterior finishes at existing front facade, new main entry front door system at existing location, new interior renovations | $750,000 |
| Jun 24, 2025 | In progress issued Jul 2025 | 475 Gates St | J Z Construction | legalization of unwarranted living space at existing first floor, level 419 sf conditioned space, new media living room, new bath, new wet bar, new closet.Details
legalization of unwarranted living space at existing first floor, level 419 sf conditioned space, new media living room, new bath, new wet bar, new closet. | $30,000 |
| May 2, 2025 | Completed final sign-off Aug 2026 | 1623 Noe St | revision to pa #2024-0913-0713 & 2025-0418-4746 new conditined fl area at (e) first fl (unit 1625) two new bathrooms, one bedroom and one office.Details
revision to pa #2024-0913-0713 & 2025-0418-4746 new conditined fl area at (e) first fl (unit 1625) two new bathrooms, one bedroom and one office. | $40,000 | |
| Apr 18, 2025 | Completed final sign-off Aug 2026 | 1623 Noe St | revision to pa 202409130713 new foundations, new skylight, new infill (window); exterior wall @ new kitchenDetails
revision to pa 202409130713 new foundations, new skylight, new infill (window); exterior wall @ new kitchen | $25,000 | |
| Mar 14, 2025 | Completed final sign-off Jan 2026 | 423 33rd Av | Armour Construction | revision to pa 2025-0212-0178 renovate (e) 3rd fl (423). prior permit 202502120178 indicated third floor address incorrectly as 425.Details
revision to pa 2025-0212-0178 renovate (e) 3rd fl (423). prior permit 202502120178 indicated third floor address incorrectly as 425. | |
| Feb 26, 2025 | Completed final sign-off Jul 2025 | 166 Hartford St | Mrcc | new skylight @ main level existing parlor. replace kitchen windows, replace exterior door, new kitchen exhauset hood, (n) washer & dryer.not visible from streetDetails
new skylight @ main level existing parlor. replace kitchen windows, replace exterior door, new kitchen exhauset hood, (n) washer & dryer.not visible from street | $75,000 |
| Feb 12, 2025 | Completed final sign-off Aug 2026 | 423 33rd Av | Armour Construction | unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights.Details
unit 425- (n) 3 level elevator, renovate (e) third floor level; relocate (e) kitchen and remodel (e) primary bathroom . add (n) bathroom, (n) den, and new opening for (5) roof skylights. | $175,000 |
| Jan 28, 2025 | Completed final sign-off Aug 2025 | 293 Coso Av | Kohlmyer | to obtain final inspection for work approved under pa# 201801229139. all work is complete.Details
to obtain final inspection for work approved under pa# 201801229139. all work is complete. | |
| Jan 28, 2025 | Completed final sign-off Aug 2025 | 295 Coso Av | Kohlmyer | to obtain final inspection for work approved under pa# 201710201854 and 202003136983. all work is complete.Details
to obtain final inspection for work approved under pa# 201710201854 and 202003136983. all work is complete. | |
| Sep 13, 2024 | Completed final sign-off Aug 2026 | 1623 Noe St | notice of violation 202417784: remove exterior stairs at rear yard (two locations) infill exterior wall at two removed exterior doors, new interiror stair at 1625 noe st. 1625 demolish (e) interior walls and kitchen, new (relocated) kitchen, new hallwaly closet and new bedroom closetDetails
notice of violation 202417784: remove exterior stairs at rear yard (two locations) infill exterior wall at two removed exterior doors, new interiror stair at 1625 noe st. 1625 demolish (e) interior walls and kitchen, new (relocated) kitchen, new hallwaly closet and new bedroom closet | $25,000 | |
| Dec 15, 2023 | Completed final sign-off Apr 2024 | 3928 Geary Bl | Cairn Construction | barrier removal - new accessible unisex toilet room @ ground floor level. interior work onlyDetails
barrier removal - new accessible unisex toilet room @ ground floor level. interior work only | $20,000 |
| Oct 13, 2023 | Completed final sign-off Jun 2026 | 2460 Francisco St | comply w/ nov #202312133. pa #8404861. no new work. legalize (e) condition: no deck flr access hatch, no exterior stair under (e) deck, (e) guardrail 76" highDetails
comply w/ nov #202312133. pa #8404861. no new work. legalize (e) condition: no deck flr access hatch, no exterior stair under (e) deck, (e) guardrail 76" high | ||
| May 19, 2023 | Completed final sign-off May 2023 | 332 27th St | Kohlmyer | revision to bpa#202106162534, stair railings to have glass panels/not metal pickets, handrail to be oak, top rail/posts to remain as metalDetails
revision to bpa#202106162534, stair railings to have glass panels/not metal pickets, handrail to be oak, top rail/posts to remain as metal | |
| May 10, 2023 | Completed final sign-off May 2023 | 555 33rd Av | Yellow Zone Construction | 1/f: renovate existing interior entry foyer. no structural alterations.Details
1/f: renovate existing interior entry foyer. no structural alterations. | $15,000 |
| Apr 4, 2023 | Completed final sign-off Jun 2026 | 742 Elizabeth St | Kohlmyer | 2-story rear addition. depth is 8'-1". includes relocating (1) bathroom, remodel 3rd fl bathroom #2; kitchen remodel. (n) windows & doors @ rear addition only. no work visible from street.Details
2-story rear addition. depth is 8'-1". includes relocating (1) bathroom, remodel 3rd fl bathroom #2; kitchen remodel. (n) windows & doors @ rear addition only. no work visible from street. | $245,000 |
| Mar 17, 2023 | Completed final sign-off Mar 2026 | 56 Hartford St | Mrcc | (n) horizontal building addition @ rear yard. basement level only, under (e) deck & under (e) building envelope. (n) bedroom & bathroom. (n) roof deck to match (e)g (first floor level).Details
(n) horizontal building addition @ rear yard. basement level only, under (e) deck & under (e) building envelope. (n) bedroom & bathroom. (n) roof deck to match (e)g (first floor level). | $125,000 |
| Feb 24, 2023 | Completed final sign-off Jun 2023 | 999 Green St | Mrcc | #1704: new kitchen cabinets at kitchen/breakfast area. partially demolish existing non-load bearing interior partition at kitchen, reconfigure closets at primary suite (non-load bearing partition walls), new range ventilation at kitchen (recirc.).Details
#1704: new kitchen cabinets at kitchen/breakfast area. partially demolish existing non-load bearing interior partition at kitchen, reconfigure closets at primary suite (non-load bearing partition walls), new range ventilation at kitchen (recirc.). | $75,000 |
| Jan 24, 2023 | Completed final sign-off Aug 2024 | 1215 Vallejo St | Kohlmyer | (p) project of top floor unit (1215).relocate kitchen,remove central rear wall & remodel of 2 bathrooms;conversion of 2 rear bedrms into a primary suite @ 2nd fl (1217) w/ the relocationof laundry rm on this fl;all work w/in (e) envelope.(n)insulation,sheetrock,(n) systems.replace in-kind 4 front wdDetails
(p) project of top floor unit (1215).relocate kitchen,remove central rear wall & remodel of 2 bathrooms;conversion of 2 rear bedrms into a primary suite @ 2nd fl (1217) w/ the relocationof laundry rm on this fl;all work w/in (e) envelope.(n)insulation,sheetrock,(n) systems.replace in-kind 4 front wd | $115,000 |
| Sep 6, 2022 | Completed final sign-off Apr 2023 | 2519 Pacific Av | Lyne Construction | referencing 202008222433, 202106102133 change to location of therapy spa and adjustments to structural detailsDetails
referencing 202008222433, 202106102133 change to location of therapy spa and adjustments to structural details | |
| Jun 30, 2022 | Completed final sign-off Aug 2024 | 1215 Vallejo St | Kohlmyer | creation of finished space on the g/f, connect to lower unit (1217) w/open connection interior staircase, all work w/in (e) envelope. new living room, bathroom, and office. relocate kitchen to 1/f, relocate 2/f bathroom, add stoarge to the 1/f accessed at the exterior walkway.Details
creation of finished space on the g/f, connect to lower unit (1217) w/open connection interior staircase, all work w/in (e) envelope. new living room, bathroom, and office. relocate kitchen to 1/f, relocate 2/f bathroom, add stoarge to the 1/f accessed at the exterior walkway. | $80,000 |
| Apr 1, 2022 | Completed final sign-off May 2023 | 30 Saint Elmo Wy | Christopher Gate Construction Inc | renovate extg exterior main entry stair(east side). renovate extg exterior side entry stair(west side) all new work is replacement in kind.Details
renovate extg exterior main entry stair(east side). renovate extg exterior side entry stair(west side) all new work is replacement in kind. | $50,000 |
| Aug 5, 2021 | Completed final sign-off Feb 2023 | 635 Broderick St | Cairn Construction | new exterior doors and windows throughout. infill (e) lightwell. relocate new kitchen & laundry, (e) living room to bedroom 2 and (e) bedroom 3 to become new living room. rev 20210205054166.Details
new exterior doors and windows throughout. infill (e) lightwell. relocate new kitchen & laundry, (e) living room to bedroom 2 and (e) bedroom 3 to become new living room. rev 20210205054166. | $20,000 |
| Aug 5, 2021 | Completed final sign-off Feb 2023 | 633 Broderick St | Cairn Construction | new exterior doors and windows throughout. infill (e) lightwell. relocate new kitchen, (e) living room to be droom 1 and new living room adj to kitchen.rev 20210205054165.Details
new exterior doors and windows throughout. infill (e) lightwell. relocate new kitchen, (e) living room to be droom 1 and new living room adj to kitchen.rev 20210205054165. | $20,000 |
| Jun 16, 2021 | Completed final sign-off May 2023 | 332 27th St | Kohlmyer | creation of a garage, set back to be in plane w/ (e) stairs and below the grade (e) walkway. interior stairs to connect the garage to the 1st flr, (n) interior stairs between all floors, creation of finished conditioned space on the 1st floor & recreation rm on 3rd flr w/ 2 dormersDetails
creation of a garage, set back to be in plane w/ (e) stairs and below the grade (e) walkway. interior stairs to connect the garage to the 1st flr, (n) interior stairs between all floors, creation of finished conditioned space on the 1st floor & recreation rm on 3rd flr w/ 2 dormers | $175,000 |
| Jun 10, 2021 | Completed final sign-off Apr 2023 | 2519 Pacific Av | Lyne Construction, Doherty Restoration, Inc. | ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only.Details
ref pa# 202008222433. new concrete floor slab and new concrete wall & footing at (e) basement level: (e) bathroom & (e) office area only. | $15,000 |
| Apr 20, 2021 | Completed final sign-off Feb 2023 | 633 Broderick St | Cairn Construction | first/ground floor level: foundation replacement, seismic upgrade of ground level and removal of centerline posts.Details
first/ground floor level: foundation replacement, seismic upgrade of ground level and removal of centerline posts. | $70,000 |
| Apr 8, 2021 | Completed final sign-off Jun 2022 | 2010 Eddy St | Mrcc | apt b(2nd flr) - kitchen & bthroom remodel. all (n) plumbing & (n) appliance at (e) location, no change to interior walls, (n) high efficiency lighting.Details
apt b(2nd flr) - kitchen & bthroom remodel. all (n) plumbing & (n) appliance at (e) location, no change to interior walls, (n) high efficiency lighting. | $45,000 |
| Mar 10, 2021 | Never finaled issued Oct 2021, no final | 755 Corbett Av | Mrcc | (n) exterior door system @ (n) first floor deck area. (n) exterior deck (infill) within req'd rear yard setback (reference to 2020-005528var variance). (n) exterior deck guardrails & handrails to replace (e) (1/f & 1/f stair to grade only)Details
(n) exterior door system @ (n) first floor deck area. (n) exterior deck (infill) within req'd rear yard setback (reference to 2020-005528var variance). (n) exterior deck guardrails & handrails to replace (e) (1/f & 1/f stair to grade only) | $20,000 |
| Feb 20, 2021 | Completed final sign-off Jan 2023 | 2511 Pacific Av | Mrcc | reference bpa 201805169267 for 2509 pacific ave, 2509/2511 pacific easement agreement at basement & first floor levels only. new re-roofing as necessary at garageroof.Details
reference bpa 201805169267 for 2509 pacific ave, 2509/2511 pacific easement agreement at basement & first floor levels only. new re-roofing as necessary at garageroof. | |
| Feb 5, 2021 | Completed final sign-off Feb 2023 | 635 Broderick St | Cairn Construction | (unit 635). 3rd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. (e) office to be (n) bedroom.Details
(unit 635). 3rd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. (e) office to be (n) bedroom. | $55,000 |
| Feb 5, 2021 | Completed final sign-off Feb 2023 | 633 Broderick St | Cairn Construction | (unit 633). 2nd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. 2 (e) rooms to be (n) bedrooms.Details
(unit 633). 2nd fl renovate (e) kitchen & laundry. (n) lighting, appliances & finishes. remove wall between kitchen & laundry. renovate (e) bathroom to (n) 3/4 bath. renovate (e) toilet room to 3/4 bath. 2 (e) rooms to be (n) bedrooms. | $55,000 |
| Aug 22, 2020 | Completed final sign-off Apr 2023 | 2519 Pacific Av | Lyne Construction, Doherty Restoration, Inc., Mrcc | renovate existing exterior deck system at rear yard area. new therapy spa at exterior deck. new exterior stairs on grade at rear yard. new exterior doors and window system to replace existing at basement and 1st fl(rear elevation).Details
renovate existing exterior deck system at rear yard area. new therapy spa at exterior deck. new exterior stairs on grade at rear yard. new exterior doors and window system to replace existing at basement and 1st fl(rear elevation). | $75,000 |
| Mar 13, 2020 | Expired or cancelled expired Aug 2025 | 295 Coso Av | Kohlmyer | revision to 201710201854 modification to foundation. removal of new walls at 3rd fl from scope of work, minot changes to 2nd fl plan, new mech roof screen.Details
revision to 201710201854 modification to foundation. removal of new walls at 3rd fl from scope of work, minot changes to 2nd fl plan, new mech roof screen. | $10,000 |
| Dec 12, 2019 | Never finaled issued Jan 2020, no final | 2509 Pacific Av | Mrcc | soil shoring @ west property line. ref pa# 2018/05/16/9267.Details
soil shoring @ west property line. ref pa# 2018/05/16/9267. | $40,000 |
| Sep 24, 2019 | Completed final sign-off Jan 2023 | 2509 Pacific Av | Mrcc | revision to 201805169267. scope revised to include all work is to occur within property boundaries only, specifically revised at west property boundry within e proposed garage area.Details
revision to 201805169267. scope revised to include all work is to occur within property boundaries only, specifically revised at west property boundry within e proposed garage area. | $8,000 |
| May 13, 2019 | Expired or cancelled withdrawn Sep 2019 | 2511 Pacific Av | ref. bpa #201805169267 for 2509 pacific ave, detach from existing party wall. lot line adjustment to be filed separately. new re-roofing & new exterior finishes as part of 2509 detachment from existing party wall. maher naDetails
ref. bpa #201805169267 for 2509 pacific ave, detach from existing party wall. lot line adjustment to be filed separately. new re-roofing & new exterior finishes as part of 2509 detachment from existing party wall. maher na | $8,000 | |
| Apr 26, 2019 | Completed final sign-off Feb 2020 | 1220 18th St | Mrcc | unit 1220, 1st flr. relocate kitchen, install (n) laundry and pantry, (n) sink at (e) powder room. units 1220 & 1222: renovation of (e) baths at 1st and 2nd flr.Details
unit 1220, 1st flr. relocate kitchen, install (n) laundry and pantry, (n) sink at (e) powder room. units 1220 & 1222: renovation of (e) baths at 1st and 2nd flr. | $45,000 |
| Mar 6, 2019 | Completed final sign-off Jan 2020 | 546 Alvarado St | Kohlmyer | reconfiguring of lower level rooms, removal of wall on 2nd fl; partition walls for a new pantry on 2nd fl. new stairs to lower level. new closets on 3rd fl work only.Details
reconfiguring of lower level rooms, removal of wall on 2nd fl; partition walls for a new pantry on 2nd fl. new stairs to lower level. new closets on 3rd fl work only. | $75,000 |
| Jul 19, 2018 | Completed final sign-off Mar 2019 | 379 Staples Av | Stonebridge Construction Inc | legalization of existing conditions; renovation of (e) first floor family room, move door for code compliance, lower floor elevation for code compliance, new exterior door and windows, new exterior pation and retaining wallsDetails
legalization of existing conditions; renovation of (e) first floor family room, move door for code compliance, lower floor elevation for code compliance, new exterior door and windows, new exterior pation and retaining walls | $50,000 |
| Jun 25, 2018 | Completed final sign-off Jul 2020 | 15 Prospect Av | Kohlmyer | remodel residence, convert mech rm to habitable space, (n) stair location, reconfigure 2nd/3rd flrs. remodel restroom w/ (n) roof deck. (3)(n) dormers, restore (e) wood painted siding & trim. remodel majority of front wood deck & supports. rear wood deck removed, (n) rated walls on 2nd flr deck.Details
remodel residence, convert mech rm to habitable space, (n) stair location, reconfigure 2nd/3rd flrs. remodel restroom w/ (n) roof deck. (3)(n) dormers, restore (e) wood painted siding & trim. remodel majority of front wood deck & supports. rear wood deck removed, (n) rated walls on 2nd flr deck. | $150,000 |
| Jun 14, 2018 | Expired or cancelled expired Nov 2023 | 2509 Pacific Av | Mrcc | new elevator to extend from existing basement to existing 3rd floor; new roof dormer to accomodate new elevator.Details
new elevator to extend from existing basement to existing 3rd floor; new roof dormer to accomodate new elevator. | $100,000 |
| May 16, 2018 | Expired or cancelled expired Nov 2023 | 2509 Pacific Av | Mrcc | (n) horizontal addition @ rear yard under (e) deck @ garage (no change in perceived building envelope), interior renovations throughout. no cfc shall be issued until easement is approved, notarized & recorded.Details
(n) horizontal addition @ rear yard under (e) deck @ garage (no change in perceived building envelope), interior renovations throughout. no cfc shall be issued until easement is approved, notarized & recorded. | $300,000 |
| Jan 22, 2018 | Expired or cancelled expired Aug 2025 | 293 Coso Av | unit legalization per ordinance 43-14. (n) high efficiancy kitchen lighting, (n) bicycle parking, (n) street tree.Details
unit legalization per ordinance 43-14. (n) high efficiancy kitchen lighting, (n) bicycle parking, (n) street tree. | $2,900 | |
| Oct 20, 2017 | Expired or cancelled expired Aug 2025 | 295 Coso Av | Kohlmyer | new interior renovations throughtout existing structure, new exterior doors adn windows throughout, new exterior finish renovations, new 3rd fl, vertical addition (new living room, new dining room, new kitchen, new powder)Details
new interior renovations throughtout existing structure, new exterior doors adn windows throughout, new exterior finish renovations, new 3rd fl, vertical addition (new living room, new dining room, new kitchen, new powder) | $350,000 |
| Sep 27, 2017 | Completed final sign-off May 2018 | 999 Green St | Mrcc | new kitchen cabinetry, appliances, & lighting, new unit entry door, replacement of extg windows in kind, new plmg fixtures(no change in location/quantity). new interior finishes. new windows 136 sq. ft.Details
new kitchen cabinetry, appliances, & lighting, new unit entry door, replacement of extg windows in kind, new plmg fixtures(no change in location/quantity). new interior finishes. new windows 136 sq. ft. | $60,000 |
| Mar 22, 2017 | Completed final sign-off Jan 2019 | 104 Collins St | Kohlmyer | conversion of (e) office to (n) bedroom & (n) bathroom by relocating (e) furnace and washer/dryer. (n) egress door at (e) opening. (n) dual-pane window at (e) opening. (n) electrical at bedroom, bathroom and hallway.Details
conversion of (e) office to (n) bedroom & (n) bathroom by relocating (e) furnace and washer/dryer. (n) egress door at (e) opening. (n) dual-pane window at (e) opening. (n) electrical at bedroom, bathroom and hallway. | $18,000 |
| Mar 3, 2017 | Completed final sign-off Aug 2017 | 915 Columbus Av | Brascia Builders Inc | replacement of (e) hvac rooftop equipment, mechanical under separate permit; new hvac rooftop equipment platforms (two locations)Details
replacement of (e) hvac rooftop equipment, mechanical under separate permit; new hvac rooftop equipment platforms (two locations) | $20,000 |
| Dec 8, 2016 | Never finaled issued Dec 2016, no final | 249 Randall St | Kohlmyer | convert extg office to bedroom by adding egress window and closet. nfpa 13r sprinkler previously installed permit app#201404082659Details
convert extg office to bedroom by adding egress window and closet. nfpa 13r sprinkler previously installed permit app#201404082659 | $1,000 |
| Nov 21, 2016 | Completed final sign-off Apr 2017 | 915 Columbus Av | Timber-Rock Craftsmen | barrier removal - new accessible unisex toilet room at existing ground floor level in area of a-1 occupancy, nightclub entertainment. n/a maher ordinanceDetails
barrier removal - new accessible unisex toilet room at existing ground floor level in area of a-1 occupancy, nightclub entertainment. n/a maher ordinance | $30,000 |
| May 9, 2016 | Completed final sign-off Oct 2016 | 266 15th Av | Snyder Construction | permeation grouting beneath (e) foundation. approximately 27 linear feet on rear north foundation side.Details
permeation grouting beneath (e) foundation. approximately 27 linear feet on rear north foundation side. | $4,500 |
| Feb 10, 2016 | Never finaled issued Feb 2016, no final | 1220 18th St | Mrcc | new window systems throughout (all wood), new exterior doors (all wood & wood with glass), new natural stone exterior landing & treads/risers at main exterior entry, new painted steel partial height (6-0 max) decorative fence at front facade (75/open min)Details
new window systems throughout (all wood), new exterior doors (all wood & wood with glass), new natural stone exterior landing & treads/risers at main exterior entry, new painted steel partial height (6-0 max) decorative fence at front facade (75/open min) | $30,000 |
| Jan 27, 2016 | Completed final sign-off Apr 2016 | 2010 Eddy St | Mascheroni Construction | apt #d - renovate existing bathroom, new insert window at existing window @ bathroom.Details
apt #d - renovate existing bathroom, new insert window at existing window @ bathroom. | $20,000 |
| Jan 14, 2016 | Completed final sign-off May 2017 | 704 Junipero Serra Bl | Mrcc | new residential elevator @ side (south) yard. approximately 5'-8" x 6'-0" x 28'-6" tall. (5'-8" x 11'-1" @ ground floor level)Details
new residential elevator @ side (south) yard. approximately 5'-8" x 6'-0" x 28'-6" tall. (5'-8" x 11'-1" @ ground floor level) | $60,000 |
| Jan 8, 2016 | Never finaled issued Jan 2016, no final | 249 Randall St | Kohlmyer | revision to 201509046242 to update dimension of new retaiing wall off of rear wall of houseDetails
revision to 201509046242 to update dimension of new retaiing wall off of rear wall of house | |
| Dec 14, 2015 | Completed final sign-off Oct 2016 | 262 15th Av | Snyder Construction | renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar.Details
renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar. | $50,000 |
| Nov 17, 2015 | Never finaled issued Dec 2015, no final | 2909 Folsom St | Armour Construction | new interior renovations thrughout (e) 1st floor level, new conditioned space including: 1 bedroom, 1 office, 1 living rm, 2 bathrooms. new int stair to connect 1st & 2nd flrs, new (enlarged) windows at front facade, new window at rear facade & lightwell area.Details
new interior renovations thrughout (e) 1st floor level, new conditioned space including: 1 bedroom, 1 office, 1 living rm, 2 bathrooms. new int stair to connect 1st & 2nd flrs, new (enlarged) windows at front facade, new window at rear facade & lightwell area. | $75,000 |
| Sep 4, 2015 | Never finaled issued Dec 2015, no final | 249 Randall St | Kohlmyer | the proposed project is the relocation & replacement of a rear yard retaining wall & enlargement of (e) patio, including new catch basin for drainage.Details
the proposed project is the relocation & replacement of a rear yard retaining wall & enlargement of (e) patio, including new catch basin for drainage. | $5,000 |
| Mar 25, 2015 | Expired or cancelled cancelled Feb 2020 | 1306 04th Av | legalization of dwelling unit installed without a permit. reference bpa 2006-04-19-9300. new hight efficacy kitchen lighting, new bedroom egress window, new bicycle parking. unit legalization ord 43-14.Details
legalization of dwelling unit installed without a permit. reference bpa 2006-04-19-9300. new hight efficacy kitchen lighting, new bedroom egress window, new bicycle parking. unit legalization ord 43-14. | $12,000 | |
| Dec 22, 2014 | Completed final sign-off Dec 2015 | 2757 Green St | Snyder Construction | exterior stair and landing renovation; new stair structure and new stair treads and risers. new landing finish material, structure to remain. new treads and risers and landing finish material to be precast concrete tiles in lieu of painted wood.Details
exterior stair and landing renovation; new stair structure and new stair treads and risers. new landing finish material, structure to remain. new treads and risers and landing finish material to be precast concrete tiles in lieu of painted wood. | $8,000 |
| Nov 21, 2014 | Completed final sign-off Feb 2017 | 305 Juanita Wy | Kohlmyer | horizontal addition @ westside of property; relocate kitchen & add family rm @ 2nd fl; convert unfinished basement to habitable space including 2-bedrooms, 1 bathroom & laundry rm @ 1st fl.Details
horizontal addition @ westside of property; relocate kitchen & add family rm @ 2nd fl; convert unfinished basement to habitable space including 2-bedrooms, 1 bathroom & laundry rm @ 1st fl. | $160,000 |
| Oct 17, 2014 | Completed final sign-off Jan 2019 | 4276 26th St | Devlin/Mcnally Construction | horizontal & vertical addition. complete interior renovations, new habitable area at (e) 1st floor. new horizontal rear yard addition at existing 1st & 2nd floors, new vertical 3rd floor addition. three bedrooms, three & a half baths.Details
horizontal & vertical addition. complete interior renovations, new habitable area at (e) 1st floor. new horizontal rear yard addition at existing 1st & 2nd floors, new vertical 3rd floor addition. three bedrooms, three & a half baths. | $400,000 |
| Sep 23, 2014 | Completed final sign-off Oct 2016 | 300 Sussex St | Kohlmyer | relocation of 2 interior flights of stairs. the relocation of bathrooms, interior wall relocations & legalization of ground floor space including family room. bedroom & bathroom. no exterior work.Details
relocation of 2 interior flights of stairs. the relocation of bathrooms, interior wall relocations & legalization of ground floor space including family room. bedroom & bathroom. no exterior work. | $85,000 |
| Sep 9, 2014 | Never finaled issued Sep 2014, no final | 1940 Bush St | Timber-Rock Craftsmen | 1/f level only: partially renovate existing kitchen, new bathroom at existing powder (add shower), relocate existing washer/dryer and hot water heater at existing exterior patio area.Details
1/f level only: partially renovate existing kitchen, new bathroom at existing powder (add shower), relocate existing washer/dryer and hot water heater at existing exterior patio area. | $15,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2017 | 135 Ulloa St | Oak Park Construction | new interior renovations throughout the existing structure, new exterior door and window systems throughout, new skylights, new half bathDetails
new interior renovations throughout the existing structure, new exterior door and window systems throughout, new skylights, new half bath | $150,000 |
| Jul 25, 2014 | Expired or cancelled expired Feb 2020 | 54 Naples St | Kohlmyer, Bay Building Structures Inc | unit legalization per ordinance 43-14. comply with nov 201467981. rebuild in kind rear deck with pressure-treated lumber. install carbon monoxide and smoke detector alram in sleeping room and hallway at 1st and 2nd fl. install new kitchen at 1st floor per plan.Details
unit legalization per ordinance 43-14. comply with nov 201467981. rebuild in kind rear deck with pressure-treated lumber. install carbon monoxide and smoke detector alram in sleeping room and hallway at 1st and 2nd fl. install new kitchen at 1st floor per plan. | $10,000 |
| Jul 23, 2014 | Completed final sign-off Dec 2014 | 2583 47th Av | Jared Johnson Construction | new bathroom within existing building envelope at 1st fl level. new window at rear, west facade. new conditioned space 67 square feetDetails
new bathroom within existing building envelope at 1st fl level. new window at rear, west facade. new conditioned space 67 square feet | $16,000 |
| May 21, 2014 | Completed final sign-off Mar 2017 | 26 Rossi Av | Kohlmyer | the proposed project is a horizontal & vertical addition, with light well to match neighbors, at rear of property to add a family room at the first floor, sunroom at the second floor, and bedroom at the 3rd floor.Details
the proposed project is a horizontal & vertical addition, with light well to match neighbors, at rear of property to add a family room at the first floor, sunroom at the second floor, and bedroom at the 3rd floor. | $65,000 |
| Apr 24, 2014 | Completed final sign-off Sep 2019 | 527 Valley St | Kohlmyer | vertical & horizontal addition include a master bedroom & bathroom @ 3rd floor. 2 story rear addition include a family room & 2 bedrooms & remodel of (e) kitchen & bathrooms.Details
vertical & horizontal addition include a master bedroom & bathroom @ 3rd floor. 2 story rear addition include a family room & 2 bedrooms & remodel of (e) kitchen & bathrooms. | $275,000 |
| Apr 8, 2014 | Never finaled issued Mar 2015, no final | 249 Randall St | Kohlmyer | the proposed projec is a vertical & horizontal addition including a new third story addition, a two story rear addition & remodel of (e) spaces.third floor addition includes 3 new bedrooms, & 2 new bathrooms, second floor remodel & expansion includes family room, laundry room, study & (n) stairs.Details
the proposed projec is a vertical & horizontal addition including a new third story addition, a two story rear addition & remodel of (e) spaces.third floor addition includes 3 new bedrooms, & 2 new bathrooms, second floor remodel & expansion includes family room, laundry room, study & (n) stairs. | $150,000 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 120 Fernwood Dr | to obtain final inspection for work approved under pa#200902232571 all work is complete.Details
to obtain final inspection for work approved under pa#200902232571 all work is complete. | ||
| Mar 7, 2014 | Completed final sign-off Jul 2014 | 1944 Bush St | Appling Construction | 3/f: renovate existing kitchen, renovate existing bathroom, expand existing 1/2 bath to become full bath, new interior finishes throughout.Details
3/f: renovate existing kitchen, renovate existing bathroom, expand existing 1/2 bath to become full bath, new interior finishes throughout. | $50,000 |
| Mar 6, 2014 | Completed final sign-off Oct 2014 | 1812 Lyon St | Kohlmyer | conversion of e storage space to garage, driveway ramp, replace (e) window and door with new garage door, new retaining walls at driveway ramp, new curb cut. add landscaping at front yardDetails
conversion of e storage space to garage, driveway ramp, replace (e) window and door with new garage door, new retaining walls at driveway ramp, new curb cut. add landscaping at front yard | $10,000 |
| Feb 25, 2014 | Completed final sign-off Mar 2022 | 1148 Dolores St | Cairn Construction | revision to appl #2014.01.29.7334 - demolish existing two windows at 3rd floor west (rear) facade & enlarge for new, wider single fixed window.Details
revision to appl #2014.01.29.7334 - demolish existing two windows at 3rd floor west (rear) facade & enlarge for new, wider single fixed window. | $5,000 |
| Feb 6, 2014 | Completed final sign-off Jul 2014 | 140 Saint Germain Av | Cairn Construction | exploratory demo & renovate (e) 1st fl powder rm & media rm. construct new wine room at (e) 1st fl crawl space. renovate (e) 2nd fl study room, (e) master bathrm. renovate (e) family room, (e) powder room & upper tr @ 3rd fl. (n) landscaping at entry courtyard.Details
exploratory demo & renovate (e) 1st fl powder rm & media rm. construct new wine room at (e) 1st fl crawl space. renovate (e) 2nd fl study room, (e) master bathrm. renovate (e) family room, (e) powder room & upper tr @ 3rd fl. (n) landscaping at entry courtyard. | $88,000 |
| Jan 29, 2014 | Completed final sign-off Mar 2022 | 1148 Dolores St | Cairn Construction | new 351 sq ft conditioned space (hallway) at 1st fl level, renovate existing bathroom at 1st fl., renovate 2 baths and mster bath at 3rd fl, new skylightDetails
new 351 sq ft conditioned space (hallway) at 1st fl level, renovate existing bathroom at 1st fl., renovate 2 baths and mster bath at 3rd fl, new skylight | $75,000 |
| Nov 26, 2013 | Completed final sign-off Jul 2014 | 29 Delmar St | Cairn Construction | 2nd and 3rd fls: enovate existing kitchens, renovate existing bathrooms, new bath at 2nd and 3rd floorsDetails
2nd and 3rd fls: enovate existing kitchens, renovate existing bathrooms, new bath at 2nd and 3rd floors | $75,000 |
| Nov 26, 2013 | Completed final sign-off Feb 2014 | 390 09th St | Delta Contracting Inc. | new break area, new accessible bathroom, renovate retail area, new lighting, new 2nd means of egress, new storefront entryDetails
new break area, new accessible bathroom, renovate retail area, new lighting, new 2nd means of egress, new storefront entry | $75,000 |
| Nov 21, 2013 | Completed final sign-off Apr 2014 | 835 Howard St | Modern Construction Inc | new interior floor finish throughout, new interior painting throughout, new break area, new office & new large conference room, new interior lighting & hvac. ref pa#2013.0909.6244.Details
new interior floor finish throughout, new interior painting throughout, new break area, new office & new large conference room, new interior lighting & hvac. ref pa#2013.0909.6244. | $130,000 |
| Oct 4, 2013 | Completed final sign-off Jan 2014 | 390 09th St | Delta Contracting Inc. | 1st floor:exploratory demo, soft demo only. all life safety infrastructure to remain, demolish extg non structural partition walls, demollish extg acoustical ceiling tiles, future t.i. under seperate permit.Details
1st floor:exploratory demo, soft demo only. all life safety infrastructure to remain, demolish extg non structural partition walls, demollish extg acoustical ceiling tiles, future t.i. under seperate permit. | $3,000 |
| Sep 9, 2013 | Completed final sign-off Mar 2014 | 835 Howard St | Modern Construction Inc | 2nd floor-explortory demo , soft demo only (ab-017). all life safety infrastructure to remain, demolish non structural interior partition walls, demo t-bar acousitcal ceiling tiles, future t.i under seperate permitDetails
2nd floor-explortory demo , soft demo only (ab-017). all life safety infrastructure to remain, demolish non structural interior partition walls, demo t-bar acousitcal ceiling tiles, future t.i under seperate permit | $5,000 |
| Sep 6, 2013 | Completed final sign-off May 2014 | 1231 19th St | Hive Builds Inc. | renovate existing detached accessory use structure, no expansion beyond existing envelope, new full bathroom.Details
renovate existing detached accessory use structure, no expansion beyond existing envelope, new full bathroom. | $25,000 |
| Aug 22, 2013 | Completed final sign-off Dec 2013 | 1774 Church St | Kohlmyer | the proposed project is the replacement of a concrete retaining wall, footing, stairway and slab in kind. new rataining wall, footing, stairway and slab reinforced with rebar.Details
the proposed project is the replacement of a concrete retaining wall, footing, stairway and slab in kind. new rataining wall, footing, stairway and slab reinforced with rebar. | $1,000 |
| Aug 14, 2013 | Completed final sign-off Sep 2013 | 4547 18th St | new/renovated exterior roof deck at 2nd floor level, rear new 1 hour rated property line walls at 2nd floor level. rear new glass guardrails at non rated perimeter of new deck areaDetails
new/renovated exterior roof deck at 2nd floor level, rear new 1 hour rated property line walls at 2nd floor level. rear new glass guardrails at non rated perimeter of new deck area | $15,000 | |
| Jun 18, 2013 | Completed final sign-off Oct 2015 | 168 Jersey St | Kohlmyer | vertical and horizontal addition including: a new 3rd story addition, a two story rear addition, conversion of storage space to garage and remodel of (e) space. addition of 3 bedrooms and 3 bathrooms on (n) 3rd story.maher- compliance w/ordinance no. 155-13 not required.Details
vertical and horizontal addition including: a new 3rd story addition, a two story rear addition, conversion of storage space to garage and remodel of (e) space. addition of 3 bedrooms and 3 bathrooms on (n) 3rd story.maher- compliance w/ordinance no. 155-13 not required. | $375,000 |
| Apr 18, 2013 | Completed final sign-off Dec 2013 | 1774 Church St | Kohlmyer | conversion of (e) storage space to livable space including bedroom, tv room, wine room & bathroom. remodel of (e) kitchen, bathrooms & other (e) space, install new dual pane windows at rear of house.Details
conversion of (e) storage space to livable space including bedroom, tv room, wine room & bathroom. remodel of (e) kitchen, bathrooms & other (e) space, install new dual pane windows at rear of house. | $250,000 |
| Mar 1, 2013 | Completed final sign-off Jan 2014 | 3104 24th St | Seagren General Contracting Inc | change of use from retail to limited restaurant. new ada restroom, kitchen, limited seating area. no demolition, no exterior work.Details
change of use from retail to limited restaurant. new ada restroom, kitchen, limited seating area. no demolition, no exterior work. | $50,000 |
| Oct 31, 2012 | Completed final sign-off Dec 2012 | 1414 Van Ness Av | Csrw Inc Dba Allied Construction Service | change of use of the existing ground floor retail space to an institutional (business) use, "the miami ad school", new accessible men's bathroom, (2) new classrooms.mep under seperate permitDetails
change of use of the existing ground floor retail space to an institutional (business) use, "the miami ad school", new accessible men's bathroom, (2) new classrooms.mep under seperate permit | $35,000 |
| Oct 30, 2012 | Completed final sign-off Sep 2013 | 2047 10th Av | Mrcc | partial excavation at first floor to create new laundry room. new interior renovations throughout existing first floor level including new bathroom & new bedroom, new exterior window systems & new exterior door at first floor level.Details
partial excavation at first floor to create new laundry room. new interior renovations throughout existing first floor level including new bathroom & new bedroom, new exterior window systems & new exterior door at first floor level. | $45,000 |
| Sep 7, 2012 | Completed final sign-off Jan 2013 | 835 Howard St | B Bilt Contruction Inc | new interior finishes, new offices, new conference rooms, new break area & new reception. hvac & lighting seperate permitDetails
new interior finishes, new offices, new conference rooms, new break area & new reception. hvac & lighting seperate permit | $60,000 |
| Jun 25, 2012 | Expired or cancelled expired Apr 2022 | 2 Mercato Ct | Conroy Builders | horizontal addition. new habitable/conditioned floor area at existing second floor level above garage. (new playroom and office area.)Details
horizontal addition. new habitable/conditioned floor area at existing second floor level above garage. (new playroom and office area.) | $40,000 |
| May 3, 2012 | Completed final sign-off Jan 2013 | 565 Jersey St | Custom 6 Builders | excavate existing basement to create new habitable space including 2 bedrooms & 2 baths. new interior stair to connect new habitable space, partially excavate rear yard for new exterior aptio (demo existing deck), new structural renovations throughout basement level.Details
excavate existing basement to create new habitable space including 2 bedrooms & 2 baths. new interior stair to connect new habitable space, partially excavate rear yard for new exterior aptio (demo existing deck), new structural renovations throughout basement level. | $75,000 |
| Jan 30, 2012 | Expired or cancelled suspend Feb 2016 | 284 Roosevelt Wy | Kohlmyer, Barrera & Associates Construction Inc | new permits-no planning hold. this permit superseded. 3-story vert & horiz. add. @ front of the property. 1-story vert. addition @ rear of the property at the average neighbor depth. rem. portion of the rear bdrm, conversion of (e) garage/storage to living space. interior remodel of (e) 2nd floor.Details
new permits-no planning hold. this permit superseded. 3-story vert & horiz. add. @ front of the property. 1-story vert. addition @ rear of the property at the average neighbor depth. rem. portion of the rear bdrm, conversion of (e) garage/storage to living space. interior remodel of (e) 2nd floor. | $375,000 |
| Oct 17, 2011 | Completed final sign-off Mar 2014 | 530 Day St | to comply w/ nov 200670115 (abatement order). horizontal & vertical addition. 3rd story vertical addi't. horiz'l 2 story addi't at rear. conversion of storage space to living space @ 1st fl & remodel of 2nd fl (e) space. new garage at (e) front facade. incorporate correct of complaint 200006778.Details
to comply w/ nov 200670115 (abatement order). horizontal & vertical addition. 3rd story vertical addi't. horiz'l 2 story addi't at rear. conversion of storage space to living space @ 1st fl & remodel of 2nd fl (e) space. new garage at (e) front facade. incorporate correct of complaint 200006778. | $250,000 |