Block 0582, lot 012
2430 Pacific Ave
- City’s use
- Single Family Residential
- Built
- 1917
- Stories
- 3
- Units
- 1
- Rooms
- 6 bathrooms
- Building
- 10,320 sq ft
- Lot
- 4,726 sq ft
- Zoning
- RH1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2026 | In progress issued Apr 2026 | 2430 Pacific Av | Luminalt Energy Corporation | solar permit: installing 13 solar pv modules, 440 watts per module, total no. of rating 5.72 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | roof mounted utility iDetails
solar permit: installing 13 solar pv modules, 440 watts per module, total no. of rating 5.72 kw. mounted: roof, ballasted: n, including 2 energy storage unit, of 240 vac, with 13.5 kwh each in capacity, ess units will not be closer than 3 feet | roof mounted utility i | |
| Apr 17, 2025 | In progress issued Apr 2025 | 2430 Pacific Av | R Lowy Fire Protection Inc | new fire sprinkler system and underground service for sfd per nfpa 13r ref pa# 2024-0509-1833Details
new fire sprinkler system and underground service for sfd per nfpa 13r ref pa# 2024-0509-1833 | $57,200 |
| Jan 15, 2025 | In progress issued Mar 2025 | 2430 Pacific Av | The Toboni Group | revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes.Details
revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes. | $275,000 |
| Nov 20, 2024 | In progress issued Mar 2025 | 2430 Pacific Av | The Toboni Group | new retaining wall at east property line. all other work under 202405091833Details
new retaining wall at east property line. all other work under 202405091833 | $10,000 |
| Sep 5, 2024 | Expired or cancelled withdrawn Nov 2024 | 2430 Pacific Av | shoring for rear yard excacation, underpinning (e) masonry bearing wallDetails
shoring for rear yard excacation, underpinning (e) masonry bearing wall | $35,000 | |
| Aug 2, 2024 | In progress issued Oct 2024 | 2430 Pacific Av | The Toboni Group | interior remodel on all levels. revised stair in rear. new roof deck with operable skylightDetails
interior remodel on all levels. revised stair in rear. new roof deck with operable skylight | $250,000 |
| Mar 15, 2024 | Completed final sign-off Mar 2025 | 2430 Pacific Av | The Toboni Group | abatement of asbestos per asbestots report dated 1/15/2024. includes removal of contaminated materials & replacement wjere asbestos is present. interior finishes only entire buildingDetails
abatement of asbestos per asbestots report dated 1/15/2024. includes removal of contaminated materials & replacement wjere asbestos is present. interior finishes only entire building | $65,000 |
| Oct 29, 2012 | Completed final sign-off Jan 2013 | 2430 Pacific Av | Jemico Llc Dba Renewal By Andersen Of Sf | replace 4 windows in 3 openings. 1 bathroom window will be lowered 23" to match windows below. inclues cutting brick, lowering concree sill, and adjusting interior wood framing, 2 double hungs mulled together into 1 large opening and 1 double hung window, replaced in kind. not visible from street.Details
replace 4 windows in 3 openings. 1 bathroom window will be lowered 23" to match windows below. inclues cutting brick, lowering concree sill, and adjusting interior wood framing, 2 double hungs mulled together into 1 large opening and 1 double hung window, replaced in kind. not visible from street. | $6,442 |
| Dec 18, 2008 | Never finaled issued Dec 2008, no final | 2430 Pacific Av | street space permit only.Details
street space permit only. | ||
| Nov 10, 2008 | Completed final sign-off Jan 2009 | 2430 Pacific Av | repair fire damagetop floor n.w. corner. no structural work. replace sheet rock, electrical (interior work only. no windows.Details
repair fire damagetop floor n.w. corner. no structural work. replace sheet rock, electrical (interior work only. no windows. | $3,000 | |
| Nov 2, 2006 | Completed final sign-off Dec 2006 | 2430 Pacific Av | renew 200508099802 for final inpsection onlyDetails
renew 200508099802 for final inpsection only | ||
| Aug 9, 2005 | Expired or cancelled expired Dec 2006 | 2430 Pacific Av | construct (n) bath level 2, rework (e) bath in basement - no other workDetails
construct (n) bath level 2, rework (e) bath in basement - no other work | $10,000 | |
| Jul 7, 2005 | Completed final sign-off Oct 2006 | 2430 Pacific Av | board of appeal case #04-189. for appl #200301245818s.Details
board of appeal case #04-189. for appl #200301245818s. | $450 | |
| Jan 24, 2003 | Completed final sign-off Oct 2006 | 2430 Pacific Av | garden stair (new) see project description use state historic building codeDetails
garden stair (new) see project description use state historic building code | $3,500 | |
| Jul 6, 2000 | Completed final sign-off Oct 2000 | 2430 Pacific Av | new dead-man grade beam anchored into (e) concrete retaining waxDetails
new dead-man grade beam anchored into (e) concrete retaining wax | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- The Toboni Group (4), Jemico Llc Dba Renewal By Andersen Of Sf, Luminalt Energy Corporation, R Lowy Fire Protection Inc
- Architects
- C. Steve Swason (2), Stephen Sutro (2), Arne Halterman