Cs Construction Co
- Based in
- San Rafael
- On San Francisco permits
- Jul 2019 to Oct 2026
- Last 24 months
- 13 permits filed
33 permits since 2000: 20 completed, 9 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room.Details
remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room. | $249,069 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | replace windows at front and rear facades. new sliding glass doors at 1st and 2nd floors. new garage door in (e) opening. replace roof shingles with standing seam metal roof.Details
replace windows at front and rear facades. new sliding glass doors at 1st and 2nd floors. new garage door in (e) opening. replace roof shingles with standing seam metal roof. | $26,233 |
| Sep 1, 2026 | In progress issued Sep 2026 | 58 Greenview Ct | remove rotten subfloor and sleepers over concrete and replace with gypcrete at first floor in one of the bedrooms.Details
remove rotten subfloor and sleepers over concrete and replace with gypcrete at first floor in one of the bedrooms. | $10,000 |
| Aug 28, 2026 | In progress issued Aug 2026 | 207 Juanita Wy | new exterior windows - north elev - replace w/n (e) openings w/ fiberglass windows. south elev: relocation of two windows, replace door w/ window & one new window.Details
new exterior windows - north elev - replace w/n (e) openings w/ fiberglass windows. south elev: relocation of two windows, replace door w/ window & one new window. | $9,410 |
| Aug 28, 2026 | In progress issued Aug 2026 | 207 Juanita Wy | 1st fl: reconfigure layout of ground fl rooms, excavate for 7'6 min clg height, connect portion of utility area, crawl space and garage to conditioned space (134 sf total) 2nd fl: new interior stairsDetails
1st fl: reconfigure layout of ground fl rooms, excavate for 7'6 min clg height, connect portion of utility area, crawl space and garage to conditioned space (134 sf total) 2nd fl: new interior stairs | $289,176 |
| Jul 21, 2026 | In progress issued Jul 2026 | 257 Joost Av | to obtain final inspection for work approved under pa#202308245209 & 202311080392, all work is completeDetails
to obtain final inspection for work approved under pa#202308245209 & 202311080392, all work is complete | |
| Dec 16, 2025 | In progress issued Mar 2026 | 581 Belvedere St | 1st floor / basement:convert (e)rooms to adu per state adu program (gov't code 66323): adu sq. ft. if 656 total (180 of that is new); new 37 sq. ft. deck at rear yard for ladder pathway.1st flr voluntary lateral strengthening. no work on 2nd & 3rd floors (e)building not sprinklered & does not have aDetails
1st floor / basement:convert (e)rooms to adu per state adu program (gov't code 66323): adu sq. ft. if 656 total (180 of that is new); new 37 sq. ft. deck at rear yard for ladder pathway.1st flr voluntary lateral strengthening. no work on 2nd & 3rd floors (e)building not sprinklered & does not have a | $120,234 |
| Oct 27, 2025 | Completed final sign-off Dec 2025 | 414 36th Av | replace 4 windows and reapit minor rot. back of home, non street visible.Details
replace 4 windows and reapit minor rot. back of home, non street visible. | $16,000 |
| Jun 26, 2025 | Completed final sign-off Feb 2026 | 72 Burlwood Dr | kitchen remodel, open wall to dining room, relocate powder room to garageDetails
kitchen remodel, open wall to dining room, relocate powder room to garage | $93,615 |
| Jun 24, 2025 | In progress issued Jun 2025 | 200 Joost Av | temporary shoring plan for permit #2024-0904-0055.Details
temporary shoring plan for permit #2024-0904-0055. | $20,000 |
| Jun 23, 2025 | Completed final sign-off Jan 2026 | 836 Lombard St | less than 50% rebuild of exterior stairs in back/rear of houseDetails
less than 50% rebuild of exterior stairs in back/rear of house | $10,000 |
| Apr 24, 2025 | Completed final sign-off Jun 2026 | 225 Teresita Bl | basement level - primary bath & laundry room addition. 1st fl - no work; 2nd fl - no workDetails
basement level - primary bath & laundry room addition. 1st fl - no work; 2nd fl - no work | $74,408 |
| Oct 7, 2024 | In progress issued Apr 2025 | 200 Joost Av | 2/f: interior remodel, add new street side window and (2) new dormer windows, new skylight at rear. (2) new bathrooms, convert attic space to conditional space. 1/f: replace one street side window and one not visible from street. add new exterior door to the backyard. basement: (2) new windows visibDetails
2/f: interior remodel, add new street side window and (2) new dormer windows, new skylight at rear. (2) new bathrooms, convert attic space to conditional space. 1/f: replace one street side window and one not visible from street. add new exterior door to the backyard. basement: (2) new windows visib | $185,200 |
| Jul 25, 2024 | Completed final sign-off Feb 2025 | 1536 Pacific Av | unit 6- remodel bexisting primary athroom, replace in-kind. no wall removalDetails
unit 6- remodel bexisting primary athroom, replace in-kind. no wall removal | $35,000 |
| Dec 12, 2023 | Completed final sign-off Nov 2024 | 2471 35th Av | 1/f: reconfigure room at 1/f, remodel bathroom. 2/f: no work. rear window reconfiguration.Details
1/f: reconfigure room at 1/f, remodel bathroom. 2/f: no work. rear window reconfiguration. | $184,352 |
| Nov 8, 2023 | Expired or cancelled expired Jul 2026 | 257 Joost Av | revision to approved drawings for pa#: 202211045955; add new beam to 1st floorDetails
revision to approved drawings for pa#: 202211045955; add new beam to 1st floor | $4,000 |
| Aug 24, 2023 | Expired or cancelled expired Jul 2026 | 257 Joost Av | 2nd floor - horizontal addition add stairs from 2nd floor to 1st floor at east (right) side of house. convert 1st floor storage to bedroom and bathroom. no work within 22.5ft front right of wayDetails
2nd floor - horizontal addition add stairs from 2nd floor to 1st floor at east (right) side of house. convert 1st floor storage to bedroom and bathroom. no work within 22.5ft front right of way | $25,000 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 115 San Felipe Av | repair dryrot on south facing exterior wall (not street visible) 150 sq approxDetails
repair dryrot on south facing exterior wall (not street visible) 150 sq approx | $6,000 |
| Nov 4, 2022 | Completed final sign-off Jul 2026 | 257 Joost Av | 1/f: interior remodel, add shower to (e) bath. relocate sump pump. 2/f: kitchen remodel, add powder room. 3/f: bathroom remodel. add laundry closet.Details
1/f: interior remodel, add shower to (e) bath. relocate sump pump. 2/f: kitchen remodel, add powder room. 3/f: bathroom remodel. add laundry closet. | $125,000 |
| Jul 29, 2022 | Completed final sign-off Feb 2024 | 641 Victoria St | 1st/f: replace (e) interior stair connecting 1stst & 2nd fl. remodel full bath, replace portion of concrete slab, (n) beams, extend hydronic heat. 2nd/f: remodel kitchen, relocate powder rm, window replace. 3rd/f: remodel bath, add new bath.Details
1st/f: replace (e) interior stair connecting 1stst & 2nd fl. remodel full bath, replace portion of concrete slab, (n) beams, extend hydronic heat. 2nd/f: remodel kitchen, relocate powder rm, window replace. 3rd/f: remodel bath, add new bath. | $192,095 |
| Mar 4, 2022 | Completed final sign-off Jul 2022 | 114 Moffitt St | repair water damaged kitchen (drywall + misc cabinets)Details
repair water damaged kitchen (drywall + misc cabinets) | $12,000 |
| Feb 22, 2022 | Expired or cancelled cancelled Jan 2026 | 571 Wildwood Wy | interior remodel of 2 bathrooms and the addition of a powder room. kitchen and bedrooms remodel. revised back exterior deck shape and size.Details
interior remodel of 2 bathrooms and the addition of a powder room. kitchen and bedrooms remodel. revised back exterior deck shape and size. | $275,000 |
| Feb 14, 2022 | Completed final sign-off Jul 2023 | 220 San Marcos Av | 2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505.Details
2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505. | $200,000 |
| Nov 12, 2021 | Completed final sign-off Sep 2023 | 1343 39th Av | this permit is revision to permit #2021/0909/8028, portion of ground floor previously designed to be a raised floor, now will be a new slab-on-grade. add wet bar.Details
this permit is revision to permit #2021/0909/8028, portion of ground floor previously designed to be a raised floor, now will be a new slab-on-grade. add wet bar. | $5,020 |
| Sep 9, 2021 | Completed final sign-off Sep 2023 | 1343 39th Av | 1/f: infill south lightwell and convert portion of garage to master suite and family room, new rear yard deck and stairs to grade. 2/f: extend covered porch at south lightwell, infill north lightwell, remodel (e) kitchen and (e) bathroom.Details
1/f: infill south lightwell and convert portion of garage to master suite and family room, new rear yard deck and stairs to grade. 2/f: extend covered porch at south lightwell, infill north lightwell, remodel (e) kitchen and (e) bathroom. | $179,613 |
| Aug 27, 2021 | Completed final sign-off Feb 2022 | 114 Moffitt St | 1 bathroom remodel in kind. demo existing drywall, electrical, plumbing. install tile, drywall and paint. guest room on ground floor lights per cec 150.0 (k)Details
1 bathroom remodel in kind. demo existing drywall, electrical, plumbing. install tile, drywall and paint. guest room on ground floor lights per cec 150.0 (k) | $20,000 |
| Feb 16, 2021 | Completed final sign-off Aug 2022 | 500 Upland Dr | family room and bathroom addition - convert portions of (e) garage to family room and bathroom, convert (e) window to double french door, add (n) windows and install recess lightsDetails
family room and bathroom addition - convert portions of (e) garage to family room and bathroom, convert (e) window to double french door, add (n) windows and install recess lights | $45,000 |
| Jan 26, 2021 | Completed final sign-off Apr 2022 | 251 Harvard St | kitchen remodel - remodel & replace existing cabinets, sink, dishwasher, stove, add island & install recessed lights. remodel & update 2 existing bathrooms. add recessed lights.Details
kitchen remodel - remodel & replace existing cabinets, sink, dishwasher, stove, add island & install recessed lights. remodel & update 2 existing bathrooms. add recessed lights. | $60,000 |
| Sep 14, 2020 | Completed final sign-off Mar 2021 | 1671 47th Av | remodel upstairs bathroom in plan. no change of layout.Details
remodel upstairs bathroom in plan. no change of layout. | $10,000 |
| Sep 14, 2020 | Completed final sign-off Jan 2022 | 1671 47th Av | revision to pa# 201907035100: reduction in scope of work. extend 1st fl 134 sf into rear yard under (e) 2nd fl 525 sf accessory dewlling unit added in conformance with ordinance 95-17. work to include plumbing, electrical & structural.Details
revision to pa# 201907035100: reduction in scope of work. extend 1st fl 134 sf into rear yard under (e) 2nd fl 525 sf accessory dewlling unit added in conformance with ordinance 95-17. work to include plumbing, electrical & structural. | |
| Sep 5, 2020 | Completed final sign-off Sep 2021 | 17 Greenview Ct | 1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window.Details
1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window. | $88,941 |
| Jun 4, 2020 | Completed final sign-off Sep 2020 | 1858 Green St | replace waterproofing on rear patio. replace in kindDetails
replace waterproofing on rear patio. replace in kind | $6,000 |
| Jul 3, 2019 | Completed final sign-off Jan 2022 | 1671 47th Av | add units per ord 162-16. horizontal addition. extend 1st fl into rear yard for new 550 sq ft. accessory dwelling unit. work to include plumbing, electrical & structural work.Details
add units per ord 162-16. horizontal addition. extend 1st fl into rear yard for new 550 sq ft. accessory dwelling unit. work to include plumbing, electrical & structural work. | $85,000 |