Back to bathroom remodel contractors
Cs Construction Co
- Based in
- San Rafael
- On San Francisco permits
- Jul 2019 to Oct 2026
- Last 24 months
- 13 permits filed
33 permits since 2000: 20 completed, 9 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 11 completed, 2 in progress, 2 expired or cancelled. Typically 72 days from filing to permit and 343 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room.Details
remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room. | $249,069 |
| Apr 24, 2025 | Completed final sign-off Jun 2026 | 225 Teresita Bl | basement level - primary bath & laundry room addition. 1st fl - no work; 2nd fl - no workDetails
basement level - primary bath & laundry room addition. 1st fl - no work; 2nd fl - no work | $74,408 |
| Oct 7, 2024 | In progress issued Apr 2025 | 200 Joost Av | 2/f: interior remodel, add new street side window and (2) new dormer windows, new skylight at rear. (2) new bathrooms, convert attic space to conditional space. 1/f: replace one street side window and one not visible from street. add new exterior door to the backyard. basement: (2) new windows visibDetails
2/f: interior remodel, add new street side window and (2) new dormer windows, new skylight at rear. (2) new bathrooms, convert attic space to conditional space. 1/f: replace one street side window and one not visible from street. add new exterior door to the backyard. basement: (2) new windows visib | $185,200 |
| Dec 12, 2023 | Completed final sign-off Nov 2024 | 2471 35th Av | 1/f: reconfigure room at 1/f, remodel bathroom. 2/f: no work. rear window reconfiguration.Details
1/f: reconfigure room at 1/f, remodel bathroom. 2/f: no work. rear window reconfiguration. | $184,352 |
| Aug 24, 2023 | Expired or cancelled expired Jul 2026 | 257 Joost Av | 2nd floor - horizontal addition add stairs from 2nd floor to 1st floor at east (right) side of house. convert 1st floor storage to bedroom and bathroom. no work within 22.5ft front right of wayDetails
2nd floor - horizontal addition add stairs from 2nd floor to 1st floor at east (right) side of house. convert 1st floor storage to bedroom and bathroom. no work within 22.5ft front right of way | $25,000 |
| Nov 4, 2022 | Completed final sign-off Jul 2026 | 257 Joost Av | 1/f: interior remodel, add shower to (e) bath. relocate sump pump. 2/f: kitchen remodel, add powder room. 3/f: bathroom remodel. add laundry closet.Details
1/f: interior remodel, add shower to (e) bath. relocate sump pump. 2/f: kitchen remodel, add powder room. 3/f: bathroom remodel. add laundry closet. | $125,000 |
| Jul 29, 2022 | Completed final sign-off Feb 2024 | 641 Victoria St | 1st/f: replace (e) interior stair connecting 1stst & 2nd fl. remodel full bath, replace portion of concrete slab, (n) beams, extend hydronic heat. 2nd/f: remodel kitchen, relocate powder rm, window replace. 3rd/f: remodel bath, add new bath.Details
1st/f: replace (e) interior stair connecting 1stst & 2nd fl. remodel full bath, replace portion of concrete slab, (n) beams, extend hydronic heat. 2nd/f: remodel kitchen, relocate powder rm, window replace. 3rd/f: remodel bath, add new bath. | $192,095 |
| Feb 22, 2022 | Expired or cancelled cancelled Jan 2026 | 571 Wildwood Wy | interior remodel of 2 bathrooms and the addition of a powder room. kitchen and bedrooms remodel. revised back exterior deck shape and size.Details
interior remodel of 2 bathrooms and the addition of a powder room. kitchen and bedrooms remodel. revised back exterior deck shape and size. | $275,000 |
| Feb 14, 2022 | Completed final sign-off Jul 2023 | 220 San Marcos Av | 2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505.Details
2/f: remodel (e) kitchen and 2 bathrooms. replace window and remove wall at kitchen. add recessed lighting and replace wood flooring. construct new cabinet at dining room. work to repair/comply with nov 202183505. | $200,000 |
| Sep 9, 2021 | Completed final sign-off Sep 2023 | 1343 39th Av | 1/f: infill south lightwell and convert portion of garage to master suite and family room, new rear yard deck and stairs to grade. 2/f: extend covered porch at south lightwell, infill north lightwell, remodel (e) kitchen and (e) bathroom.Details
1/f: infill south lightwell and convert portion of garage to master suite and family room, new rear yard deck and stairs to grade. 2/f: extend covered porch at south lightwell, infill north lightwell, remodel (e) kitchen and (e) bathroom. | $179,613 |
| Aug 27, 2021 | Completed final sign-off Feb 2022 | 114 Moffitt St | 1 bathroom remodel in kind. demo existing drywall, electrical, plumbing. install tile, drywall and paint. guest room on ground floor lights per cec 150.0 (k)Details
1 bathroom remodel in kind. demo existing drywall, electrical, plumbing. install tile, drywall and paint. guest room on ground floor lights per cec 150.0 (k) | $20,000 |
| Feb 16, 2021 | Completed final sign-off Aug 2022 | 500 Upland Dr | family room and bathroom addition - convert portions of (e) garage to family room and bathroom, convert (e) window to double french door, add (n) windows and install recess lightsDetails
family room and bathroom addition - convert portions of (e) garage to family room and bathroom, convert (e) window to double french door, add (n) windows and install recess lights | $45,000 |
| Jan 26, 2021 | Completed final sign-off Apr 2022 | 251 Harvard St | kitchen remodel - remodel & replace existing cabinets, sink, dishwasher, stove, add island & install recessed lights. remodel & update 2 existing bathrooms. add recessed lights.Details
kitchen remodel - remodel & replace existing cabinets, sink, dishwasher, stove, add island & install recessed lights. remodel & update 2 existing bathrooms. add recessed lights. | $60,000 |
| Sep 14, 2020 | Completed final sign-off Mar 2021 | 1671 47th Av | remodel upstairs bathroom in plan. no change of layout.Details
remodel upstairs bathroom in plan. no change of layout. | $10,000 |
| Sep 5, 2020 | Completed final sign-off Sep 2021 | 17 Greenview Ct | 1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window.Details
1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window. | $88,941 |