Jeff Ertelt
- License
- E21680
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E21680 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Oct 2024 to Jan 2026
5 permits since 2000 (engineer on 5 permits): 3 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Diablo Telecom & Construction Inc (2), Metropolitan Electrical Construction, Triton Tower Inc
- Architects
- Jacob Proctor
- Engineers
- Joseph J Fitzsimons (2), Seung Oh (2), Yunxiao Yang
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2026 | In progress issued Sep 2026 | 4610 Mission St | Diablo Telecom & Construction Inc | at&t modification of (e) wireless facility consisting of: r/r (3) antennas w/(3) (n) mounting pipes; install 1 (n) netsure 7100 upgrade kit in (e) dcpp rack and (9) (n) vertiv converter - in (e) dcpp rack; install rf safety signage; stripping and barricades per eme rf reportDetails
at&t modification of (e) wireless facility consisting of: r/r (3) antennas w/(3) (n) mounting pipes; install 1 (n) netsure 7100 upgrade kit in (e) dcpp rack and (9) (n) vertiv converter - in (e) dcpp rack; install rf safety signage; stripping and barricades per eme rf report | $68,520 |
| Jan 29, 2026 | In progress filed Jan 2026, not yet issued | 2 New Montgomery St | at&t modification of an (e) wireless facility consisting of: remove (4) rru's & power trunks: install 1 (2) air anteannas, 2 rrus & power trunks & pipes: install 1 rectifier expansion shelf; (1) -48v rectifier; 6 power exten converter; (1) g4 bbu; install rf safety signs. stripping & barricades perDetails
at&t modification of an (e) wireless facility consisting of: remove (4) rru's & power trunks: install 1 (2) air anteannas, 2 rrus & power trunks & pipes: install 1 rectifier expansion shelf; (1) -48v rectifier; 6 power exten converter; (1) g4 bbu; install rf safety signs. stripping & barricades per | $81,500 | |
| Jul 9, 2025 | Completed final sign-off May 2026 | 1635 Divisadero St | Triton Tower Inc | modification to an existing at&t wireless facility consisting: remove/relocate 16 antennas + 2 new r/r 32 rru's; remove extg powertrunks, cables, tray; r/r surge suppressors w/6 dc-9; h frame behind new frp screening. equipment area sow to include; r+r 32 batteries; remove 3 purcell cabinets;Details
modification to an existing at&t wireless facility consisting: remove/relocate 16 antennas + 2 new r/r 32 rru's; remove extg powertrunks, cables, tray; r/r surge suppressors w/6 dc-9; h frame behind new frp screening. equipment area sow to include; r+r 32 batteries; remove 3 purcell cabinets; | $150,000 |
| Apr 8, 2025 | Completed final sign-off Feb 2026 | 1155 Harrison St | Diablo Telecom & Construction Inc | at&t wireless facility: remove 4 panel antennas; relocate 1 antenna on (n) pipe mast; add 2 panel & 3 air antennas; relocate 5 radios; remove 3 dc-6 & 1 dc6 w/ 2 power & 1 fiber cable; install 3 new dc9 surge arrestors, power & fiber trunks; remove 1 3106 rbs cabinetDetails
at&t wireless facility: remove 4 panel antennas; relocate 1 antenna on (n) pipe mast; add 2 panel & 3 air antennas; relocate 5 radios; remove 3 dc-6 & 1 dc6 w/ 2 power & 1 fiber cable; install 3 new dc9 surge arrestors, power & fiber trunks; remove 1 3106 rbs cabinet | $60,000 |
| Oct 31, 2024 | Completed final sign-off Jul 2025 | 1101 Fillmore St | Metropolitan Electrical Construction | modifications to existing att facility: r/r 5 antennas, add one new air antenna; remove 9 rrus, install 8 plus 2 mounts; remove 3 diplexer; install one 6648 bbu; 1 new fif rack; install 58v retrofit kit (neq 53008) in existing dcpp; install new rf safety signs, barricades + stripping at rooftop.Details
modifications to existing att facility: r/r 5 antennas, add one new air antenna; remove 9 rrus, install 8 plus 2 mounts; remove 3 diplexer; install one 6648 bbu; 1 new fif rack; install 58v retrofit kit (neq 53008) in existing dcpp; install new rf safety signs, barricades + stripping at rooftop. | $65,000 |