Yunxiao Yang
- License
- C87746
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C87746 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Apr 2022 to Oct 2026
7 permits since 2000 (engineer on 7 permits): 3 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Endeavor Wireless Construction Inc (2), Metropolitan Electrical Construction, Ravig Inc Dba Salient Global Technologi, Stc Netcom Inc., Triton Tower Inc
- Architects
- Jacob Proctor
- Engineers
- Casey Millard, Eric Embick, Esrah Persellin, Jacob Proctor, Jeff Ertelt, Joel Martman, Joseph J Fitzsimons
- Authorized agents
- Brittney Vladyka
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 4
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2026 | In progress filed Oct 2026, not yet issued | 121 Steuart St | modification to an (e) wireless facitliy consisting of remove 6 rrus, install new rrus, remove and replace 3 air antennas, remove(e) antenna frame at sector c and replace w/new street beam and pipe mounts, install new pipe mounts for air antennas, relocate 1 (e) rru and 1 surge suppressor, relocateDetails
modification to an (e) wireless facitliy consisting of remove 6 rrus, install new rrus, remove and replace 3 air antennas, remove(e) antenna frame at sector c and replace w/new street beam and pipe mounts, install new pipe mounts for air antennas, relocate 1 (e) rru and 1 surge suppressor, relocate | $84,000 | |
| Jul 9, 2025 | Completed final sign-off May 2026 | 1635 Divisadero St | Triton Tower Inc | modification to an existing at&t wireless facility consisting: remove/relocate 16 antennas + 2 new r/r 32 rru's; remove extg powertrunks, cables, tray; r/r surge suppressors w/6 dc-9; h frame behind new frp screening. equipment area sow to include; r+r 32 batteries; remove 3 purcell cabinets;Details
modification to an existing at&t wireless facility consisting: remove/relocate 16 antennas + 2 new r/r 32 rru's; remove extg powertrunks, cables, tray; r/r surge suppressors w/6 dc-9; h frame behind new frp screening. equipment area sow to include; r+r 32 batteries; remove 3 purcell cabinets; | $150,000 |
| Jan 15, 2025 | In progress issued Apr 2025 | 150 Hooper St | Stc Netcom Inc. | installation of an unmanned telecomm facility, consisting of a rooftop design with anennaes concealed by frp screening. related supporting equipment included.Details
installation of an unmanned telecomm facility, consisting of a rooftop design with anennaes concealed by frp screening. related supporting equipment included. | $195,000 |
| Aug 13, 2024 | Completed final sign-off Jan 2026 | 401 03rd St | Metropolitan Electrical Construction | at&t wireless modification of an (e) roofing wireless facility consisting - remove 4 antennas, install 5 antennas, extend (e) frp screening; new 1 rectifier in (e) dcpp & 1 new xmu in (e) purcell cab; frp screening to match texture/color of (e) frp screeningDetails
at&t wireless modification of an (e) roofing wireless facility consisting - remove 4 antennas, install 5 antennas, extend (e) frp screening; new 1 rectifier in (e) dcpp & 1 new xmu in (e) purcell cab; frp screening to match texture/color of (e) frp screening | $85,000 |
| Aug 25, 2023 | Never finaled filed Aug 2023, never issued | 1801 Fulton St | remove(1)(e)antenna.remove(4)(e)) rrus(2) rrus11 b13(2) rrus112 b4. install (3)(n) antennas. install (3)(n)rrus (1)4449(2)8843. install (4)(n) diplexer. install (2)(n) antenna mounts.relocate (1)(e) 6x12 hyrbid cable.install (2)(n) 6x12 hyrbid cablles. sow at equipment. remove (1) (e) legacy 48v pp.Details
remove(1)(e)antenna.remove(4)(e)) rrus(2) rrus11 b13(2) rrus112 b4. install (3)(n) antennas. install (3)(n)rrus (1)4449(2)8843. install (4)(n) diplexer. install (2)(n) antenna mounts.relocate (1)(e) 6x12 hyrbid cable.install (2)(n) 6x12 hyrbid cablles. sow at equipment. remove (1) (e) legacy 48v pp. | $40,000 | |
| Jun 21, 2023 | Completed final sign-off Jul 2025 | 601 Van Ness Av | Endeavor Wireless Construction Inc | remove 9 (e) antennas. remove 7 (e) piplexers. install 9 (n) antennas. install 6 (n) splitters.install 6 (n) cominers.install 3 (n) antenna mounts. no new batteries proposed.Details
remove 9 (e) antennas. remove 7 (e) piplexers. install 9 (n) antennas. install 6 (n) splitters.install 6 (n) cominers.install 3 (n) antenna mounts. no new batteries proposed. | $40,000 |
| Apr 6, 2022 | Never finaled issued Nov 2023, no final | 245 South Van Ness Av | Ravig Inc Dba Salient Global Technologi, Endeavor Wireless Construction Inc | verizon wireless: remove 3 (e) rrus. remove 3 (e) dc-3315 surge protector. install 6 (n) antennas, 3 (n) rrus, 3 (n) dc surge protectors. remove 3 (e) 6x12 hybrid cables. install 3 (n) 12x24 hybrid cables. relocate 3 (e) rrus to antennas. remove 3 (e) surge protector. install 3 (e) surge protector.Details
verizon wireless: remove 3 (e) rrus. remove 3 (e) dc-3315 surge protector. install 6 (n) antennas, 3 (n) rrus, 3 (n) dc surge protectors. remove 3 (e) 6x12 hybrid cables. install 3 (n) 12x24 hybrid cables. relocate 3 (e) rrus to antennas. remove 3 (e) surge protector. install 3 (e) surge protector. | $40,000 |