Esrah Persellin
- License
- C88844
- Civil engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up C88844 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Leaf Communications
- On San Francisco permits
- Sep 2021 to Apr 2022
6 permits since 2000 (engineer on 6 permits): 2 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Endeavor Wireless Construction Inc (2), Ravig Inc Dba Salient Global Technologi (2), Quality Telecom Consultants, Unlimited Communications, Xclusive Wireless Resources Llc.
- Engineers
- Yunxiao Yang
- Authorized agents
- Jacob Williams
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 5
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 6, 2022 | Never finaled issued Nov 2023, no final | 245 South Van Ness Av | Ravig Inc Dba Salient Global Technologi, Endeavor Wireless Construction Inc | verizon wireless: remove 3 (e) rrus. remove 3 (e) dc-3315 surge protector. install 6 (n) antennas, 3 (n) rrus, 3 (n) dc surge protectors. remove 3 (e) 6x12 hybrid cables. install 3 (n) 12x24 hybrid cables. relocate 3 (e) rrus to antennas. remove 3 (e) surge protector. install 3 (e) surge protector.Details
verizon wireless: remove 3 (e) rrus. remove 3 (e) dc-3315 surge protector. install 6 (n) antennas, 3 (n) rrus, 3 (n) dc surge protectors. remove 3 (e) 6x12 hybrid cables. install 3 (n) 12x24 hybrid cables. relocate 3 (e) rrus to antennas. remove 3 (e) surge protector. install 3 (e) surge protector. | $40,000 |
| Apr 6, 2022 | Completed final sign-off Jul 2023 | 270 Mcallister St | Ravig Inc Dba Salient Global Technologi, Endeavor Wireless Construction Inc | modif to (e) verizon wireless site; remove (1)(e) antenna, (2)(e)rrus, (1)rrus11 b13, (1) rrus12bu, (1)(e) radone; install (2) new antennas, (2) new rrus, (1) uuu9, (1)8863, (2) new diplexers, (1) new radone 8-0" x 4'-4" ocDetails
modif to (e) verizon wireless site; remove (1)(e) antenna, (2)(e)rrus, (1)rrus11 b13, (1) rrus12bu, (1)(e) radone; install (2) new antennas, (2) new rrus, (1) uuu9, (1)8863, (2) new diplexers, (1) new radone 8-0" x 4'-4" oc | $40,000 |
| Apr 4, 2022 | Never finaled issued Jul 2022, no final | 20 Heron St | Quality Telecom Consultants | verizon wireless: remove 3 (e) antennas. install 3 (n) antennas. install 3 (n) integrated units.Details
verizon wireless: remove 3 (e) antennas. install 3 (n) antennas. install 3 (n) integrated units. | $40,000 |
| Mar 2, 2022 | Completed final sign-off Mar 2023 | 50 08th St | Xclusive Wireless Resources Llc. | multifunctional to an extg verizon site: remove 2 extg antennas. remove 4 extg rrus11 b13+a2. remove 4 extg dc-3315 surge protectors. install 2 new antennas. install 4 new rru 4449. install 4 new dc-6627 surge protectors.Details
multifunctional to an extg verizon site: remove 2 extg antennas. remove 4 extg rrus11 b13+a2. remove 4 extg dc-3315 surge protectors. install 2 new antennas. install 4 new rru 4449. install 4 new dc-6627 surge protectors. | $40,000 |
| Jan 20, 2022 | Expired or cancelled cancelled Jan 2026 | 601 Van Ness Av | verizon wireless: antenna modification to (e) wireless site. remove 9 (e) antennas. remove 7 (e) diplexers. install 9 (n) antennas. install 6 (n) splitters. install 6 (n) combiners. install 3 (n) antenna mounts. no proposed batteries.Details
verizon wireless: antenna modification to (e) wireless site. remove 9 (e) antennas. remove 7 (e) diplexers. install 9 (n) antennas. install 6 (n) splitters. install 6 (n) combiners. install 3 (n) antenna mounts. no proposed batteries. | $40,000 | |
| Sep 16, 2021 | Never finaled issued Mar 2023, no final | 1650 Owens St | Unlimited Communications | modification to (e) wireless site. remove 9 antennas, remove 6 rru, remove 1 dc-3315 sure protector, install 12 antennas, 6 rrus, 1 surge protector, remove 2 hybrid cables, install 2 hybrid cables, remove 3 rulo1 b13, remove 1 sure protector, install 1 sure protectorDetails
modification to (e) wireless site. remove 9 antennas, remove 6 rru, remove 1 dc-3315 sure protector, install 12 antennas, 6 rrus, 1 surge protector, remove 2 hybrid cables, install 2 hybrid cables, remove 3 rulo1 b13, remove 1 sure protector, install 1 sure protector | $40,000 |