Block 3808, lot 016

150 Hooper St

City’s use
Industrial
Lot
23,759 sq ft
Zoning
NA
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

33 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 29, 2026In progress
issued Aug 2026
150 Hooper StErrc Systems Inc (Former Dishnet Direct)provide design to upgrade bda & bbu for erces systems.
Details
Permit
202607295773
Status
issued
Filed
Jul 29, 2026
Permit issued
Aug 25, 2026
Declared cost
$35,000
Address
150 Hooper St

provide design to upgrade bda & bbu for erces systems.

Open the permit page

$35,000
Jan 15, 2025In progress
issued Apr 2025
150 Hooper StStc Netcom Inc.installation of an unmanned telecomm facility, consisting of a rooftop design with anennaes concealed by frp screening. related supporting equipment included.
Details
Permit
202501158398
Status
issued
Filed
Jan 15, 2025
Permit issued
Apr 23, 2025
Declared cost
$195,000
Address
150 Hooper St

installation of an unmanned telecomm facility, consisting of a rooftop design with anennaes concealed by frp screening. related supporting equipment included.

Open the permit page

$195,000
Dec 23, 2021Completed
final sign-off Aug 2022
150 Hooper StCochran Inc Dba Cochran Electric Co Incfire only: revision to pa# 201410239755. errcs upgrade.
Details
Permit
202112234977
Status
complete
Filed
Dec 23, 2021
Permit issued
Dec 23, 2021
Final sign-off
Aug 1, 2022
Declared cost
$5,000
Address
150 Hooper St

fire only: revision to pa# 201410239755. errcs upgrade.

Open the permit page

$5,000
Jan 13, 2020Never finaled
issued Jan 2020, no final
150 Hooper StBcci Construction Companyto obtain a final inspection for work approved under previous permits 201807104093 & 201811065091. all work is complete.
Details
Permit
202001131765
Status
issued
Filed
Jan 13, 2020
Permit issued
Jan 13, 2020
Declared cost
$10
Address
150 Hooper St

to obtain a final inspection for work approved under previous permits 201807104093 & 201811065091. all work is complete.

Open the permit page

$10
Jul 9, 2019Completed
final sign-off May 2021
150 Hooper StSiemens Industry, Inc.fire alarm work the linamar remodel on floor 2, additions are 3 duct detectors, 1 horn/strobe, 1 strobe ref 201905080084
Details
Permit
201907095355
Status
complete
Filed
Jul 9, 2019
Permit issued
Jul 9, 2019
Final sign-off
May 25, 2021
Declared cost
$5,935
Address
150 Hooper St

fire alarm work the linamar remodel on floor 2, additions are 3 duct detectors, 1 horn/strobe, 1 strobe ref 201905080084

Open the permit page

$5,935
Jun 3, 2019Completed
final sign-off Jan 2020
150 Hooper StGci, Inc212 & 214 - mechanical - install 3 fan coil units & duct work
Details
Permit
201906032245
Status
complete
Filed
Jun 3, 2019
Permit issued
Jun 5, 2019
Final sign-off
Jan 22, 2020
Declared cost
$88,000
Address
150 Hooper St

212 & 214 - mechanical - install 3 fan coil units & duct work

Open the permit page

$88,000
May 8, 2019Completed
final sign-off Sep 2020
150 Hooper StGci, Incti - unit 212 & 214 on 2nd flr. partition & door for conference room, a sound-rated door btwn units, relocattion of plumbing for utility sink & misc finishes
Details
Permit
201905080084
Status
complete
Filed
May 8, 2019
Permit issued
May 10, 2019
Final sign-off
Sep 29, 2020
Declared cost
$300,000
Address
150 Hooper St

ti - unit 212 & 214 on 2nd flr. partition & door for conference room, a sound-rated door btwn units, relocattion of plumbing for utility sink & misc finishes

Open the permit page

$300,000
Feb 26, 2019Never finaled
issued Mar 2019, no final
150 Hooper StAcrat Plumbing & Heatingsuite # 211: interior t.i. for r&d tenant wtth new non-structural partitons and finishes , fire life safety & sprinkler under separate permit.
Details
Permit
201902263816
Status
issued
Filed
Feb 26, 2019
Permit issued
Mar 20, 2019
Declared cost
$100,000
Address
150 Hooper St

suite # 211: interior t.i. for r&d tenant wtth new non-structural partitons and finishes , fire life safety & sprinkler under separate permit.

Open the permit page

$100,000
Jan 10, 2019Completed
final sign-off Jan 2019
150 Hooper StSiemens Industry, Inc.4th flr - fire alarm - add 2 smk dets, 4 duct dets, 4 horn/strobes and 1 strobe. for "human made" ref 201809180668
Details
Permit
201901109992
Status
complete
Filed
Jan 10, 2019
Permit issued
Jan 10, 2019
Final sign-off
Jan 23, 2019
Declared cost
$10,690
Address
150 Hooper St

4th flr - fire alarm - add 2 smk dets, 4 duct dets, 4 horn/strobes and 1 strobe. for "human made" ref 201809180668

Open the permit page

$10,690
Jan 9, 2019Expired or cancelled
cancelled Jan 2026
150 Hooper Stconstruction of partition wall, 29'long and 18' 1/4" tall with one door and three windows.
Details
Permit
201901099943
Status
cancelled
Filed
Jan 9, 2019
Declared cost
$20,000
Address
150 Hooper St

construction of partition wall, 29'long and 18' 1/4" tall with one door and three windows.

Open the permit page

$20,000
Dec 28, 2018Completed
final sign-off Jul 2020
150 Hooper StBcci Construction Company4th floor: revision to app#201809180668: to change to rating on wall. n/a for maher
Details
Permit
201812289308
Status
complete
Filed
Dec 28, 2018
Permit issued
Jan 7, 2019
Final sign-off
Jul 27, 2020
Declared cost
$1,000
Address
150 Hooper St

4th floor: revision to app#201809180668: to change to rating on wall. n/a for maher

Open the permit page

$1,000
Nov 16, 2018Never finaled
issued Nov 2018, no final
150 Hooper St2nd fl - new sink and casework in existing breakroom. existing electrical and rough in plumbing
Details
Permit
201811166135
Status
issued
Filed
Nov 16, 2018
Permit issued
Nov 21, 2018
Declared cost
$5,000
Address
150 Hooper St

2nd fl - new sink and casework in existing breakroom. existing electrical and rough in plumbing

Open the permit page

$5,000
Nov 13, 2018Never finaled
issued Jan 2019, no final
150 Hooper StBcci Construction Company4th fl: mech to support appproved arch for office/workshop project. new fsds. ref pa #201809180668.
Details
Permit
201811135644
Status
issued
Filed
Nov 13, 2018
Permit issued
Jan 7, 2019
Declared cost
$75,000
Address
150 Hooper St

4th fl: mech to support appproved arch for office/workshop project. new fsds. ref pa #201809180668.

Open the permit page

$75,000
Nov 6, 2018Expired or cancelled
expired Jul 2020
150 Hooper StBcci Construction Companyunit 211. add a demising wall in order to create unit 215
Details
Permit
201811065091
Status
expired
Filed
Nov 6, 2018
Permit issued
Nov 8, 2018
Declared cost
$5,000
Address
150 Hooper St

unit 211. add a demising wall in order to create unit 215

Open the permit page

$5,000
Nov 1, 2018Completed
final sign-off Dec 2018
150 Hooper StR L H Fire Protection Incfire sprinkler add 12 and delete 1 upright sprinkler on the 4th fl ref 201809180668
Details
Permit
201811014780
Status
complete
Filed
Nov 1, 2018
Permit issued
Nov 6, 2018
Final sign-off
Dec 4, 2018
Declared cost
$6,500
Address
150 Hooper St

fire sprinkler add 12 and delete 1 upright sprinkler on the 4th fl ref 201809180668

Open the permit page

$6,500
Oct 3, 2018Completed
final sign-off Nov 2018
150 Hooper StJohn A Lehman Dba Lehman Constructiont.i. new interior partition
Details
Permit
201810032189
Status
complete
Filed
Oct 3, 2018
Permit issued
Oct 11, 2018
Final sign-off
Nov 5, 2018
Declared cost
$728
Address
150 Hooper St

t.i. new interior partition

Open the permit page

$728
Sep 26, 2018Completed
final sign-off Oct 2018
150 Hooper StBcci Construction Company3rd fl: architectural drawings of construction of demising wall in unit 3a to create unit 3g. mep submittals deferred.
Details
Permit
201809261431
Status
complete
Filed
Sep 26, 2018
Permit issued
Sep 26, 2018
Final sign-off
Oct 24, 2018
Declared cost
$15,000
Address
150 Hooper St

3rd fl: architectural drawings of construction of demising wall in unit 3a to create unit 3g. mep submittals deferred.

Open the permit page

$15,000
Sep 18, 2018Completed
final sign-off Jul 2020
150 Hooper StBcci Construction Companytenant build out of 4th fl suite for manufacturing studio including machine shop, wood shop, office and conference space, breakroom. no changes to e lighting, defered mep, sprinkler, alarm
Details
Permit
201809180668
Status
complete
Filed
Sep 18, 2018
Permit issued
Sep 24, 2018
Final sign-off
Jul 27, 2020
Declared cost
$600,000
Address
150 Hooper St

tenant build out of 4th fl suite for manufacturing studio including machine shop, wood shop, office and conference space, breakroom. no changes to e lighting, defered mep, sprinkler, alarm

Open the permit page

$600,000
Aug 2, 2018Completed
final sign-off Aug 2018
150 Hooper StSiemens Industry, Inc.2nd flr - fire alarm work "placemade" add 3 duct det, 16 horn/strobes and 5 strobes ref 201803163925
Details
Permit
201808026319
Status
complete
Filed
Aug 2, 2018
Permit issued
Aug 6, 2018
Final sign-off
Aug 13, 2018
Declared cost
$17,660
Address
150 Hooper St

2nd flr - fire alarm work "placemade" add 3 duct det, 16 horn/strobes and 5 strobes ref 201803163925

Open the permit page

$17,660
Aug 2, 2018Completed
final sign-off Aug 2018
150 Hooper StSiemens Industry, Inc.1st fl. f/a. alarm work for the "placemade". additions are 1 duct det, 1 horn/strobe power supply & 8 horn/strobes. ref#201803163916. n/a for maher.
Details
Permit
201808026322
Status
complete
Filed
Aug 2, 2018
Permit issued
Aug 3, 2018
Final sign-off
Aug 9, 2018
Declared cost
$8,250
Address
150 Hooper St

1st fl. f/a. alarm work for the "placemade". additions are 1 duct det, 1 horn/strobe power supply & 8 horn/strobes. ref#201803163916. n/a for maher.

Open the permit page

$8,250
Aug 2, 2018Completed
final sign-off Aug 2018
150 Hooper StSiemens Industry, Inc.4th flr - fire alarm work "placemade" add 10 duct det, 7 horn/strobes and 3 strobes ref 201803163921
Details
Permit
201808026321
Status
complete
Filed
Aug 2, 2018
Permit issued
Aug 6, 2018
Final sign-off
Aug 13, 2018
Declared cost
$21,940
Address
150 Hooper St

4th flr - fire alarm work "placemade" add 10 duct det, 7 horn/strobes and 3 strobes ref 201803163921

Open the permit page

$21,940
Aug 2, 2018Completed
final sign-off Aug 2018
150 Hooper StSiemens Industry, Inc.3rd flr - fire alarm work "placemade" add 1 duct det, 1 horn/strobe power supply, 14 horn/strobes and 3 strobes ref 201803163914. n/a for maher.
Details
Permit
201808026323
Status
complete
Filed
Aug 2, 2018
Permit issued
Aug 3, 2018
Final sign-off
Aug 9, 2018
Declared cost
$13,700
Address
150 Hooper St

3rd flr - fire alarm work "placemade" add 1 duct det, 1 horn/strobe power supply, 14 horn/strobes and 3 strobes ref 201803163914. n/a for maher.

Open the permit page

$13,700
Jul 10, 2018Expired or cancelled
expired Jul 2020
150 Hooper StBcci Construction Companyrev to pa# 201803163925; to omit door at non-rated corridor & break rm.
Details
Permit
201807104096
Status
expired
Filed
Jul 10, 2018
Permit issued
Jul 17, 2018
Address
150 Hooper St

rev to pa# 201803163925; to omit door at non-rated corridor & break rm.

Open the permit page

Jun 26, 2018Completed
final sign-off Aug 2018
150 Hooper StR L H Fire Protection Inc1st flr - fire sprinkler - relocate 1, add 1 penden.t ti# 201803163921 maher na
Details
Permit
201806263043
Status
complete
Filed
Jun 26, 2018
Permit issued
Jul 2, 2018
Final sign-off
Aug 3, 2018
Declared cost
$1,000
Address
150 Hooper St

1st flr - fire sprinkler - relocate 1, add 1 penden.t ti# 201803163921 maher na

Open the permit page

$1,000
Jun 26, 2018Completed
final sign-off May 2025
150 Hooper StR L H Fire Protection Inc3rd flr - fire sprinkler - add 15 uprights. ti #201803163916 maher na
Details
Permit
201806263046
Status
complete
Filed
Jun 26, 2018
Permit issued
Jul 2, 2018
Final sign-off
May 28, 2025
Declared cost
$8,000
Address
150 Hooper St

3rd flr - fire sprinkler - add 15 uprights. ti #201803163916 maher na

Open the permit page

$8,000
Jun 26, 2018Completed
final sign-off Jun 2025
150 Hooper StR L H Fire Protection Inc2nd flr - fire sprinkler - relocate 23 and delete 8 uprights ti # 201803163914 maher na
Details
Permit
201806263045
Status
complete
Filed
Jun 26, 2018
Permit issued
Jul 2, 2018
Final sign-off
Jun 17, 2025
Declared cost
$12,500
Address
150 Hooper St

2nd flr - fire sprinkler - relocate 23 and delete 8 uprights ti # 201803163914 maher na

Open the permit page

$12,500
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyt.i. to 1 suite (full floor) om 4th level in new building. work includes, power, lighting, plumbing & hvac systems. 12785 sf. maher na
Details
Permit
201803163921
Status
issued
Filed
Mar 16, 2018
Permit issued
Apr 25, 2018
Declared cost
$882,000
Address
150 Hooper St

t.i. to 1 suite (full floor) om 4th level in new building. work includes, power, lighting, plumbing & hvac systems. 12785 sf. maher na

Open the permit page

$882,000
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyti to 3 ground level suites in new building. work includes partitions, lighting, plumbing & exhaust system. 8430 sf
Details
Permit
201803163916
Status
issued
Filed
Mar 16, 2018
Permit issued
Apr 25, 2018
Declared cost
$707,000
Address
150 Hooper St

ti to 3 ground level suites in new building. work includes partitions, lighting, plumbing & exhaust system. 8430 sf

Open the permit page

$707,000
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyti to create 4 light industrial workshop suites on 3rd level in new building. work includes pratitions, lighting, plumbing & ventilation system. 12785 sf, fire alarm and sprinklers under separate permits.
Details
Permit
201803163914
Status
issued
Filed
Mar 16, 2018
Permit issued
Apr 25, 2018
Declared cost
$747,500
Address
150 Hooper St

ti to create 4 light industrial workshop suites on 3rd level in new building. work includes pratitions, lighting, plumbing & ventilation system. 12785 sf, fire alarm and sprinklers under separate permits.

Open the permit page

$747,500
Mar 16, 2018Never finaled
issued Apr 2018, no final
150 Hooper StBcci Construction Companyt.i. to 4 suite on 2nd fl in new building. work includes partitions, lighting, plumbing & ventilation systems. 12775 sf. maher na sprinkler nad fire alarm separte permit
Details
Permit
201803163925
Status
issued
Filed
Mar 16, 2018
Permit issued
Apr 25, 2018
Declared cost
$853,000
Address
150 Hooper St

t.i. to 4 suite on 2nd fl in new building. work includes partitions, lighting, plumbing & ventilation systems. 12775 sf. maher na sprinkler nad fire alarm separte permit

Open the permit page

$853,000
Nov 6, 2017Completed
final sign-off Oct 2018
150 Hooper StDpr Construction Incall floors: evacuation signage for 150 hooper fire permit only. n/a for maher
Details
Permit
201711063233
Status
complete
Filed
Nov 6, 2017
Permit issued
Nov 6, 2017
Final sign-off
Oct 9, 2018
Declared cost
$2,000
Address
150 Hooper St

all floors: evacuation signage for 150 hooper fire permit only. n/a for maher

Open the permit page

$2,000
Oct 25, 2017Completed
final sign-off Jun 2020
150 Hooper StDpr Constructionrevision to 201410239755 s3 add outdoor rated access panel at elevator penthouse
Details
Permit
201710252209
Status
complete
Filed
Oct 25, 2017
Permit issued
Nov 9, 2017
Final sign-off
Jun 23, 2020
Declared cost
$1,000
Address
150 Hooper St

revision to 201410239755 s3 add outdoor rated access panel at elevator penthouse

Open the permit page

$1,000
Aug 18, 2017Completed
final sign-off Jun 2020
150 Hooper StDpr Constructionrev to superstructure addendum pa#201410239755-s2: changes to roof p1 slab for new mep equipment changes. changes to misc details. add elevator guardrail support & roof top davitts.
Details
Permit
201708185286
Status
complete
Filed
Aug 18, 2017
Permit issued
Sep 25, 2017
Final sign-off
Jun 23, 2020
Declared cost
$10,000
Address
150 Hooper St

rev to superstructure addendum pa#201410239755-s2: changes to roof p1 slab for new mep equipment changes. changes to misc details. add elevator guardrail support & roof top davitts.

Open the permit page

$10,000

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.

Filter the results