Block 3715, lot 003
132 The Embarcadero
41 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2026 | In progress | 132 The Embarcadero | proposed pergola. | $62,253 | |
| May 5, 2025 | In progress | 121 Steuart St | Capitol Electric Const | replace existing electrical main service in (e) location. relocate fire pump feed | $50,000 |
| Aug 28, 2024 | In progress | 121 Steuart St | dish: install (3)(n) antennas + (1)(n) equipment platform roof top; no proposed batteries; install (n) electrical panel | $150,000 | |
| Apr 8, 2022 | Completed | 121 Steuart St | Potter Fire Protection | replace fire pump meter. | $25,000 |
| Dec 21, 2021 | Completed | 121 Steuart St | Metropolitan Electrical Construction | at&t: replace 10 antennas, remove 3 rru's, relocate 4 rru's, install 3 diplexers, remove 2 cabinets, remove 1 dus41, remove 12 batteries, install 2 rectifiers, install 1 battery rack with 8 strings of batteries, install 12 batteries. | $25,000 |
| Nov 9, 2021 | Never finaled | 132 The Embarcadero | American Chiller Service Inc. | hot water heater and cooling tower replacement. like for like | $167,658 |
| Jun 14, 2021 | Completed | 121 Steuart St | Pioneer Fire Inc. | replace existing pre-action risers. | $8,800 |
| Mar 15, 2021 | Completed | 121 Steuart St | Acco Engineered Systems Inc. Dba Acco En | installation of 2 bard units in neigboring building elevator machine rooms with associated condensate piping. 1-ton bard unit. | $32,000 |
| Dec 21, 2020 | Completed | 121 Steuart St | Citadel Systems Inc. | as built for 2019-1204-8598 | $2,500 |
| Dec 11, 2020 | Completed | 121 Steuart St | Pioneer Fire Inc. | remove sprinkler head from machine room & hoist ways. | $6,000 |
| Sep 28, 2020 | Completed | 121 Steuart St | Sabah International Incorporated | voluntary replace existing fire alarm system on like for like basis. ** maher: n/a ** | $68,500 |
| Aug 19, 2020 | Completed | 121 Steuart St | Freestone Reconstruction Inc | ground flr. light construction, floor coring, switch light fixtures, add electrical. all work at first flr. ground flr to remain publically accessible community space accessory to office use above. | $20,500 |
| Dec 4, 2019 | Never finaled | 121 Steuart St | Citadel Systems Inc. | fire alarm for 2nd fl ti. ref pa #201810011840. | $4,000 |
| Nov 8, 2019 | Completed | 121 Steuart St | Walschon Fire Protection Inc | recut & rlocate 20 pendents in conference room area (koret boardroom). add branch line & 5 pendent in corridor area. demo 4 cold solderes uprights. convert 3 uprights into pendents. raise sprinkler branch line above electrical/lobby/ add 6 new pendent in living room area. add 2 in storage closet. | $24,178 |
| Sep 27, 2019 | Completed | 121 Steuart St | Pioneer Contractors Inc | reroofing | $236,105 |
| Sep 26, 2019 | Completed | 121 Steuart St | Bay Area Builders Inc. | revision to app#201810011840 to modify exterior elevation to one single span window on 2nd floor. n/a for maher | |
| Jul 5, 2019 | Expired or cancelled | 132 The Embarcadero | alteration to kitchen makeup air system ductwork only. | $8,900 | |
| Oct 23, 2018 | Completed | 121 Steuart St | Ericsson Inc Dba E U S Inc | at&t swap 5 antennas & relocate 1 antenna; install 3 rru's & swap 3 rrus, & relocate 2 rrus; install 1 power plant & 4 power trunks; install 1 back-up battery cabinet and install 2 strings of 115ah batteries | $15,000 |
| Oct 1, 2018 | Completed | 121 Steuart St | Bay Area Builders Inc. | remodel 5,000 sfff of a-3 space. move non-bearing walls, electrical, plumbing & finishes. add (n) windows on 2nd level at embarcadero facade. | $450,000 |
| Aug 1, 2018 | Never finaled | 132 The Embarcadero | Pan Sign Co | install (1) single faced electric wall sign "angler" | $7,000 |
| May 9, 2018 | Never finaled | 132 The Embarcadero | Aegis Enterprises Inc | fire sprinklers for first floor for application number 201712217066-add (1) and relocate (23) fire sprinklers to accomodate new tenant improvement changes. | $12,500 |
| Sep 21, 2017 | Never finaled | 132 The Embarcadero | M G Demolition | dismantle metal and glass awning above restaurant door entry. n/a for maher. | $1,500 |
| Mar 16, 2017 | Expired or cancelled | 121 Steuart St | Oliver & Company Inc. | install expansion joint to exterior of the building. n/a ordinance #155-13 | $2,500 |
| Aug 16, 2016 | Completed | 121 Steuart St | Electric Tech Construction Inc | att modification: r&r 3 (e) antennas, w/3new antennas. r&r 3(e) rrus-11 w/3(new) rrus-32; install 3new rrus-11 & 3 new rrus-e2; install 4new cable shrouds, paint to match; install other minor equip maher na | $21,000 |
| Oct 16, 2015 | Completed | 121 Steuart St | Electric Tech Construction Inc | at&t mobility modification to (e) telecommunication facility & install (1) (n) xmu inside (e) 19" rack; install (3) (n) rrus-32 units; install (n) 2" innerduct for fiber & dc cables; r&r (4) (e) antennas w/(4) (n) antennas. n/a maher ordinance | $12,500 |
| Mar 9, 2015 | Completed | 121 Steuart St | Electric Tech Construction Inc | modify an (e) unmanned att tele facility consist of install (3) new rrus-12units w/3 a2 modules, install 3 new 2" innerducts for new fiber & dc cables inside (e) cable trays, remove & replace 3 e) att antennas w/3 new anntennas, dc suppressors, duw unit, add xmu unit, remove unused cable.maher na | $25,000 |
| Mar 24, 2014 | Completed | 132 The Embarcadero | Bernardini Construction | field inspection requested as built revision to 201401166459 to clarify ada employee access to remodeled service bar. maher 155-13 not required. | |
| Feb 27, 2014 | Completed | 121 Steuart St | Nu Rev Communications Inc. | a modification to an existing unmanned at&t telecommunication facility consisting of removing three existing dc-2 surge suppressors & adding three new rrus-11 units, three new a-2 modules & three new dc-6 surge suppressors. compliance with ordinance #155-13 not required | $10,000 |
| Jan 16, 2014 | Completed | 132 The Embarcadero | Bernardini Construction | remodel existing service bar in existing restaurant, area of work approx. 20 sq.ft., seperate electrical & plumbing trade permit will be applied for. no change of use, building is fully sprinklered. compliance with ordinance #155-13 not required. | $30,000 |
| Jun 26, 2012 | Completed | 121 Steuart St | Matrix Hg Inc | remove extg a/c package unit and replace with new same like and kind. | $115,000 |
| May 14, 2012 | Never finaled | 121 Steuart St | street space and mta parking | ||
| Oct 7, 2011 | Completed | 121 Steuart St | Buchanan General Contracting Co | at&t . revision to pa# 2011.08.16.2569 to relocate 4 antennas from roof to facade. | $125,000 |
| Aug 16, 2011 | Never finaled | 121 Steuart St | Metropolitan Electrical Construction | at&t. installation of 1 new equipment cabinet and 12 panel antennas within a frp screen enclosure. | $125,000 |
| Aug 18, 2009 | Never finaled | 121 Steuart St | Tyco Integrated Security | to obtain final inspection for work approved under app #200606164248 all work is complete | |
| Nov 20, 2006 | Expired or cancelled | 121 Steuart St | Tyco Integrated Security | connecting and proframming of two devices installed on 5/f by others to house panel monitor alarm and trouble condition by nfpa72 remote system monitoring | $1,785 |
| Nov 9, 2006 | Never finaled | 121 Steuart St | Pribuss Engineering Inc | 5 th floor - 6 heads, pre-action system. | $14,500 |
| Oct 16, 2006 | Expired or cancelled | 121 Steuart St | Novo Construction Inc | replacement of entry storefront. full replacement of frames and glass. | $18,000 |
| Jun 16, 2006 | Expired or cancelled | 121 Steuart St | Sabah International Incorporated | install, final & test one fm200 fire suppression system to protect the it room; 1 control panel, 2 pull staion, 3 strobe, 3 photo det. 2, abort, 1 2oo lb. fm200 cylinder, 3 ion det, 2 horn/strobe, 1 nozzle. (work to be done on 5th floor. ) 133lb fn200 agent. | $16,650 |
| Apr 27, 2005 | Expired or cancelled | 121 Steuart St | Tyco Integrated Security | install new unimode 200 control panel on g/f in control room for monitoring 2 (e)fire control panels | $6,474 |
| Apr 26, 2004 | Completed | 121 Steuart St | int remodel. selective demo of non loadbearing partitions, door relocations, shelves, workstations. | $50,000 | |
| Jan 7, 2000 | Completed | 132 The Embarcadero | revision to app #9907605 |