16 permits since 2000 (engineer on 16 permits): 13 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2025 | Completed final sign-off Jul 2026 | 600 Montgomery St | Hathaway Dinwiddie Co. | 20th/21st floor: revision to pa#'s 202508203517 and 202808203523 - new interconnecting convenience stair between level 20 and level 21.typical details for small new penetrations and infill of existing penetrations. typical cfs framing. mep equipment anchorage.Details
20th/21st floor: revision to pa#'s 202508203517 and 202808203523 - new interconnecting convenience stair between level 20 and level 21.typical details for small new penetrations and infill of existing penetrations. typical cfs framing. mep equipment anchorage. | $25,000 |
| May 6, 2025 | Completed final sign-off Dec 2025 | 600 Montgomery St | Truebeck Construction | priority ab004 deferred review of structural scope associated with pa# 202504114225Details
priority ab004 deferred review of structural scope associated with pa# 202504114225 | |
| Feb 26, 2025 | Completed final sign-off Feb 2026 | 500 Howard St | Novo Construction Inc | 3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep includedDetails
3rd fl -ti to include new nonstructural partitions, paint, wall covering on, privacy glass film; repairs to existing conditions. mep included | $4,721,444 |
| May 23, 2024 | Completed final sign-off Jul 2025 | 517 Washington St | Hathaway Dinwiddie Co. | revise pa# 202401304918: mep deferred. structural topping slab over infill removed from project scope; add additional drains and modify drainage; add cellcrete fill layer.Details
revise pa# 202401304918: mep deferred. structural topping slab over infill removed from project scope; add additional drains and modify drainage; add cellcrete fill layer. | |
| Nov 16, 2023 | Completed final sign-off Jun 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | installation of lighting on the exterior of the shoulders of the transamerica pyramid.lighting will be connected to a steel frame that is anchored to the bldg at top of the shoulders w/thru bolts. no change to interior spaces.no alter to bldg envelope or thermal barrier. mep under separate permitDetails
installation of lighting on the exterior of the shoulders of the transamerica pyramid.lighting will be connected to a steel frame that is anchored to the bldg at top of the shoulders w/thru bolts. no change to interior spaces.no alter to bldg envelope or thermal barrier. mep under separate permit | $92,397 |
| May 16, 2023 | Completed final sign-off Oct 2023 | 375 Laguna Honda Bl | K L W Construction Inc | omnicell medication dispenser replacement with associated wall anchor; install, administrative building 400 training roomDetails
omnicell medication dispenser replacement with associated wall anchor; install, administrative building 400 training room | $34,300 |
| Nov 28, 2022 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred.Details
4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred. | $2,100,000 |
| May 16, 2022 | Completed final sign-off Oct 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | scope of work includes but not limited to: selective demolition of (e) site elements. concrete seating areas, 1 non-compliant comcrete ramp, (e) paving as needed for new work. improvement includes patching to match (e) paving, 2 (n) ramps, (n) concrete planters & planting. (n) irrigation & drainage.Details
scope of work includes but not limited to: selective demolition of (e) site elements. concrete seating areas, 1 non-compliant comcrete ramp, (e) paving as needed for new work. improvement includes patching to match (e) paving, 2 (n) ramps, (n) concrete planters & planting. (n) irrigation & drainage. | $1,260,176 |
| Apr 7, 2022 | Expired or cancelled cancelled Jan 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | lev 1-3:change of use to restaurant/spa/hotel/exercise space. t.i. including arch/struct/mep to establish commercial kitchen,restrm & office on g-1; restrms, commercial kitchen on lev 1; commercial kitchen,screening rm,bar & business meeting on lev 2; exercise space,guest rms,spa & restrm on lev 3.Details
lev 1-3:change of use to restaurant/spa/hotel/exercise space. t.i. including arch/struct/mep to establish commercial kitchen,restrm & office on g-1; restrms, commercial kitchen on lev 1; commercial kitchen,screening rm,bar & business meeting on lev 2; exercise space,guest rms,spa & restrm on lev 3. | $4,195,659 |
| Mar 8, 2022 | Completed final sign-off Jul 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | 48/f: tenant lounge: change of use from b to a2. new non-structural interior partitions, ceiling, lighting, fixtures, millwork, and finishes.Details
48/f: tenant lounge: change of use from b to a2. new non-structural interior partitions, ceiling, lighting, fixtures, millwork, and finishes. | $201,836 |
| Feb 7, 2022 | Completed final sign-off Nov 2024 | 505 Sansome St | Hathaway Dinwiddie Co. | removal of exterior building envelope and roofing, structural demolition, new curtain wall and builindg envelope; floor infill @ 2nd floor; building lobby ti and ground floor cold shell space for future retailDetails
removal of exterior building envelope and roofing, structural demolition, new curtain wall and builindg envelope; floor infill @ 2nd floor; building lobby ti and ground floor cold shell space for future retail | $745,379 |
| Feb 2, 2022 | Completed final sign-off Jun 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | new amenity fitness center on 26th fl consisting of a new non-structural interior partitions, ceiling, lighting fixtures, millwork and finishesDetails
new amenity fitness center on 26th fl consisting of a new non-structural interior partitions, ceiling, lighting fixtures, millwork and finishes | $673,736 |
| Feb 2, 2022 | Completed final sign-off Oct 2023 | 600 Montgomery St | Hathaway Dinwiddie Co. | new leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes.Details
new leasing gallery and exhibition space on 36th fl consisting of new non-structural interior partitions, ceilings lighting, fixtures, millwork & finishes. | $415,708 |
| Jan 26, 2022 | Never finaled issued Apr 2022, no final | 600 Montgomery St | Hathaway Dinwiddie Co. | base building improvement for for fl g1,1,2,3. structural and non-structural demo. construction of new communicating stair. construction of 2 elevators. all associated structural work.Details
base building improvement for for fl g1,1,2,3. structural and non-structural demo. construction of new communicating stair. construction of 2 elevators. all associated structural work. | $1,002,978 |
| Dec 14, 2021 | Completed final sign-off Oct 2025 | 600 Montgomery St | Hathaway Dinwiddie Co. | 1f: base building improvement. structural and non-structural demo. construction of new communicating stair & 1 exit stair. construction of 2 elevators. demo under pa# 2020104128342 (2nd fl)Details
1f: base building improvement. structural and non-structural demo. construction of new communicating stair & 1 exit stair. construction of 2 elevators. demo under pa# 2020104128342 (2nd fl) | $213,120 |
| Oct 4, 2021 | Never finaled issued Feb 2022, no final | 600 Montgomery St | Hathaway Dinwiddie Co. | remodel building lobby: entire ground fl storefront, structural and non structural demo, new structural fl assemblies, new roofing, relocation of fcc room. non structural partition, millwork & finishes. mep deferredDetails
remodel building lobby: entire ground fl storefront, structural and non structural demo, new structural fl assemblies, new roofing, relocation of fcc room. non structural partition, millwork & finishes. mep deferred | $6,500,000 |