Permit GraphShortlistSan Francisco building permits since 2000

Tim Murphy

License
C27780
Look the license up with the state
Listed as
architect, authorized agent-others, engineer
Firm
Tmda
Based in
San Francisco
On San Francisco permits
Nov 2002 to Sep 2026

159 permits since 2000 (architect on 153 permits, engineer on 4 permits, authorized agent-others on 3 permits): 109 completed, 15 in progress, 16 never finaled, 19 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 159.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 24, 2026In progress
issued Sep 2026
145 New Montgomery StPrincipal Builders Inc.ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit.
Details
Permit
202609248578
Status
issued
Filed
Sep 24, 2026
Permit issued
Sep 30, 2026
Declared cost
$842,811
Address
145 New Montgomery St

ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit.

Open the permit page

$842,811
Jul 17, 2026In progress
issued Aug 2026
145 New Montgomery StPrincipal Builders Inc.minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork.
Details
Permit
202607175229
Status
issued
Filed
Jul 17, 2026
Permit issued
Aug 5, 2026
Declared cost
$750,000
Address
145 New Montgomery St

minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork.

Open the permit page

$750,000
Jul 13, 2026In progress
issued Aug 2026
298 Alabama StBrennan Strong Hold Construction Incnon-structural improvements @ 2nd fl including new partitions and glazing, new finishes, doors and hardware. no exterior work. no change in use, occupancy or exiting.
Details
Permit
202607134922
Status
issued
Filed
Jul 13, 2026
Permit issued
Aug 12, 2026
Declared cost
$180,000
Address
298 Alabama St

non-structural improvements @ 2nd fl including new partitions and glazing, new finishes, doors and hardware. no exterior work. no change in use, occupancy or exiting.

Open the permit page

$180,000
Dec 15, 2025Completed
final sign-off Mar 2026
600 Montgomery StTruebeck Constructionstructural revision to pa# 202504245130 and pa# 202504144304, to reassign engineer of record for the coil unit anchorage.
Details
Permit
202512151786
Status
complete
Filed
Dec 15, 2025
Permit issued
Dec 22, 2025
Final sign-off
Mar 30, 2026
Address
600 Montgomery St

structural revision to pa# 202504245130 and pa# 202504144304, to reassign engineer of record for the coil unit anchorage.

Open the permit page

Jul 31, 2025In progress
issued Sep 2025
4 Embarcadero CenterBcci Construction Company13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred.
Details
Permit
202507312035
Status
issued
Filed
Jul 31, 2025
Permit issued
Sep 10, 2025
Declared cost
$300,000
Address
4 Embarcadero Center

13t/14th. interconnecting stair between floors 13&14 as part of office t.i. mep deferred.

Open the permit page

$300,000
Jun 27, 2025Completed
final sign-off Aug 2026
345 California StGci, Inc30/f: tenant improvement.
Details
Permit
202506279639
Status
complete
Filed
Jun 27, 2025
Permit issued
Jul 17, 2025
Final sign-off
Aug 6, 2026
Declared cost
$400,000
Address
345 California St

30/f: tenant improvement.

Open the permit page

$400,000
Jun 24, 2025Completed
final sign-off Nov 2025
35 South ParkNovo Construction Inc1st fl tenant improvement, new non structural partition, ceilings, door and hardware, glazing and frames. modifcation to existing floor, wall ceiling finishes for new layout.
Details
Permit
202506249355
Status
complete
Filed
Jun 24, 2025
Permit issued
Jun 26, 2025
Final sign-off
Nov 19, 2025
Declared cost
$136,968
Address
35 South Park

1st fl tenant improvement, new non structural partition, ceilings, door and hardware, glazing and frames. modifcation to existing floor, wall ceiling finishes for new layout.

Open the permit page

$136,968
Jun 23, 2025Completed
final sign-off Nov 2025
3 Embarcadero CenterPrincipal Builders Inc.26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space.
Details
Permit
202506239229
Status
complete
Filed
Jun 23, 2025
Permit issued
Jul 18, 2025
Final sign-off
Nov 21, 2025
Declared cost
$957,720
Address
3 Embarcadero Center

26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space.

Open the permit page

$957,720
May 14, 2025In progress
issued May 2025
405 Howard StSkyline Construction8th/f: revision to 202412126728 (no work to be done). update restroom plans per existing conditions. no fixture count changes, measurement correction only
Details
Permit
202505146466
Status
issued
Filed
May 14, 2025
Permit issued
May 14, 2025
Address
405 Howard St

8th/f: revision to 202412126728 (no work to be done). update restroom plans per existing conditions. no fixture count changes, measurement correction only

Open the permit page

May 7, 2025In progress
issued May 2025
405 Howard StSkyline Construction1st fl: ti for 1,777 sq ft installation of non structural partitions, millwork, doors & hardware. partial replacement of mep distribution: new supply fan, distribution duct, power + signal, lighting & controls
Details
Permit
202505075995
Status
issued
Filed
May 7, 2025
Permit issued
May 22, 2025
Declared cost
$251,766
Address
405 Howard St

1st fl: ti for 1,777 sq ft installation of non structural partitions, millwork, doors & hardware. partial replacement of mep distribution: new supply fan, distribution duct, power + signal, lighting & controls

Open the permit page

$251,766
May 6, 2025Completed
final sign-off Dec 2025
600 Montgomery StTruebeck Constructionpriority ab004 deferred review of structural scope associated with pa# 202504114225
Details
Permit
202504245130
Status
complete
Filed
May 6, 2025
Permit issued
Jul 23, 2025
Final sign-off
Dec 24, 2025
Address
600 Montgomery St

priority ab004 deferred review of structural scope associated with pa# 202504114225

Open the permit page

Apr 24, 2025In progress
issued May 2025
405 Howard StSkyline Construction7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring.
Details
Permit
202504245172
Status
issued
Filed
Apr 24, 2025
Permit issued
May 15, 2025
Declared cost
$172,000
Address
405 Howard St

7/f: interior tenant improvement. infill stair opening with pan decking/structural support/concrete. patch back raised access flooring.

Open the permit page

$172,000
Apr 14, 2025Completed
final sign-off Jun 2026
600 Montgomery StTruebeck Constructioninterior alterations of new tenant fit out of levels 10,12, and 13 levels. to include conference rooms, and storage areas.
Details
Permit
202504144304
Status
complete
Filed
Apr 14, 2025
Permit issued
Jul 14, 2025
Final sign-off
Jun 1, 2026
Declared cost
$9,800,000
Address
600 Montgomery St

interior alterations of new tenant fit out of levels 10,12, and 13 levels. to include conference rooms, and storage areas.

Open the permit page

$9,800,000
Apr 14, 2025Completed
final sign-off Jun 2026
600 Montgomery StTruebeck Construction9th & 11th fl t.i. interior alteration of new tenant fit out included conference rooms, storag aeras, enclosed offices, lan rooms w/ associated mep & structural work
Details
Permit
202504144336
Status
complete
Filed
Apr 14, 2025
Permit issued
Jul 14, 2025
Final sign-off
Jun 1, 2026
Declared cost
$6,500,000
Address
600 Montgomery St

9th & 11th fl t.i. interior alteration of new tenant fit out included conference rooms, storag aeras, enclosed offices, lan rooms w/ associated mep & structural work

Open the permit page

$6,500,000
Apr 11, 2025Completed
final sign-off Mar 2026
600 Montgomery StTruebeck Construction23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130)
Details
Permit
202504114225
Status
complete
Filed
Apr 11, 2025
Permit issued
Jul 8, 2025
Final sign-off
Mar 30, 2026
Declared cost
$5,500,000
Address
600 Montgomery St

23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130)

Open the permit page

$5,500,000
Mar 10, 2025In progress
issued Mar 2025
345 California StGci, Inc31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical work
Details
Permit
202503101898
Status
issued
Filed
Mar 10, 2025
Permit issued
Mar 21, 2025
Address
345 California St

31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical work

Open the permit page

Jan 24, 2025Completed
final sign-off Jul 2025
35 South ParkNovo Construction Incnew interior partition, door hardware; glazing and frames. modification of existing floor,wall and ceiling finishes for new layout
Details
Permit
202501249023
Status
complete
Filed
Jan 24, 2025
Permit issued
Jan 28, 2025
Final sign-off
Jul 1, 2025
Declared cost
$116,545
Address
35 South Park

new interior partition, door hardware; glazing and frames. modification of existing floor,wall and ceiling finishes for new layout

Open the permit page

$116,545
Jan 3, 2025Completed
final sign-off Aug 2025
405 Howard StSkyline Construction10/fl-ref 202410223482- partial ti to install non structural partitions and ceilings no change of use mep fire alarm system and sprinkler under separte permit
Details
Permit
202501037683
Status
complete
Filed
Jan 3, 2025
Permit issued
Jan 15, 2025
Final sign-off
Aug 8, 2025
Declared cost
$852,000
Address
405 Howard St

10/fl-ref 202410223482- partial ti to install non structural partitions and ceilings no change of use mep fire alarm system and sprinkler under separte permit

Open the permit page

$852,000
Dec 12, 2024In progress
issued Jan 2025
405 Howard StSkyline Construction8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit.
Details
Permit
202412126728
Status
issued
Filed
Dec 12, 2024
Permit issued
Jan 30, 2025
Declared cost
$1,704,000
Address
405 Howard St

8/f: partial interior tenant improvement. installation of non structural partitions and ceilings. addition of patio millwork. no change of use. fire alarm system, sprinkler, mep under separate permit.

Open the permit page

$1,704,000
Dec 12, 2024In progress
issued Jan 2025
405 Howard StSkyline Constructionpartial interior t.i. on 9th fl. installation of non structural partitions and ceilings (improvement area 7,900 sq) no change of use mep deferred
Details
Permit
202412126726
Status
issued
Filed
Dec 12, 2024
Permit issued
Jan 10, 2025
Declared cost
$1,212,800
Address
405 Howard St

partial interior t.i. on 9th fl. installation of non structural partitions and ceilings (improvement area 7,900 sq) no change of use mep deferred

Open the permit page

$1,212,800
Oct 22, 2024In progress
issued Dec 2024
405 Howard StSkyline Construction8-10/fl- partial interior demo of non structural partitions (e) lightings, ceilings, millwork. removal of (e) furniture systems. fire sprinkler plans will be under separate permit by fire protection contractor.
Details
Permit
202410223482
Status
issued
Filed
Oct 22, 2024
Permit issued
Dec 2, 2024
Declared cost
$170,000
Address
405 Howard St

8-10/fl- partial interior demo of non structural partitions (e) lightings, ceilings, millwork. removal of (e) furniture systems. fire sprinkler plans will be under separate permit by fire protection contractor.

Open the permit page

$170,000
Oct 10, 2024In progress
issued Nov 2024
140 New Montgomery StPrincipal Builders Inc.21/fl- demo (e) non structural partitions ceilings finsihes (n) non structural partitions (n) millwork furniture glazing repair (e) finishes
Details
Permit
202410102764
Status
issued
Filed
Oct 10, 2024
Permit issued
Nov 7, 2024
Declared cost
$300,000
Address
140 New Montgomery St

21/fl- demo (e) non structural partitions ceilings finsihes (n) non structural partitions (n) millwork furniture glazing repair (e) finishes

Open the permit page

$300,000
Aug 7, 2024Completed
final sign-off Jan 2025
1088 Sansome StBrennan Strong Hold Construction Incminor ti on the basement level only. new interior non structural partition, new door, and hardware. new glazing and frame. minor alteration to floor finish and ceiling finish. no change to mechanical or plumbing.
Details
Permit
202408078163
Status
complete
Filed
Aug 7, 2024
Permit issued
Aug 7, 2024
Final sign-off
Jan 9, 2025
Declared cost
$30,000
Address
1088 Sansome St

minor ti on the basement level only. new interior non structural partition, new door, and hardware. new glazing and frame. minor alteration to floor finish and ceiling finish. no change to mechanical or plumbing.

Open the permit page

$30,000
Dec 13, 2023In progress
issued Jan 2024
345 California StGci, Inc31/f: demo of no structural partitions, ceilings, finhses & hardware. new interior non structural partitions & glazing, new doors, lighting & ceilings. new 36 vav boxes 1-new heat pump, 2-new fsds in lobby, new power lighting, new plumbing.
Details
Permit
202312132454
Status
issued
Filed
Dec 13, 2023
Permit issued
Jan 5, 2024
Declared cost
$3,000,000
Address
345 California St

31/f: demo of no structural partitions, ceilings, finhses & hardware. new interior non structural partitions & glazing, new doors, lighting & ceilings. new 36 vav boxes 1-new heat pump, 2-new fsds in lobby, new power lighting, new plumbing.

Open the permit page

$3,000,000
Sep 5, 2023Completed
final sign-off May 2024
345 California StGci, Incstructural support and details for skyfold partition ceiling panel. ref 202305228283 and 202212218840.
Details
Permit
202309055872
Status
complete
Filed
Sep 5, 2023
Permit issued
Sep 11, 2023
Final sign-off
May 20, 2024
Declared cost
$15,000
Address
345 California St

structural support and details for skyfold partition ceiling panel. ref 202305228283 and 202212218840.

Open the permit page

$15,000
Aug 1, 2023Completed
final sign-off Feb 2024
1 Embarcadero CenterGci, Inc35th fl - ti to include new non structural partitions, doors, hardware glazing and frmaes. new flooring finishes. mep & fire like safety under separate permit
Details
Permit
202308013434
Status
complete
Filed
Aug 1, 2023
Permit issued
Aug 24, 2023
Final sign-off
Feb 28, 2024
Declared cost
$100,000
Address
1 Embarcadero Center

35th fl - ti to include new non structural partitions, doors, hardware glazing and frmaes. new flooring finishes. mep & fire like safety under separate permit

Open the permit page

$100,000
Jul 17, 2023Never finaled
issued Jul 2023, no final
600 Montgomery StPrincipal Builders Inc.revision to 202304246334 to provide exacct product specification for concealed automatic rolled down smoke curtain at elevator doors
Details
Permit
202307172347
Status
issued
Filed
Jul 17, 2023
Permit issued
Jul 21, 2023
Address
600 Montgomery St

revision to 202304246334 to provide exacct product specification for concealed automatic rolled down smoke curtain at elevator doors

Open the permit page

May 22, 2023Completed
final sign-off May 2024
345 California StGci, Increv pa202109077835.resized the conference room 3004 and removed the banquet.removel a phone room and changed another phone room to a print room.changed the furntiure layout. added floor are to all offices. changed finish specs in misc design. maher n/a.
Details
Permit
202305228283
Status
complete
Filed
May 22, 2023
Permit issued
Jun 6, 2023
Final sign-off
May 20, 2024
Address
345 California St

rev pa202109077835.resized the conference room 3004 and removed the banquet.removel a phone room and changed another phone room to a print room.changed the furntiure layout. added floor are to all offices. changed finish specs in misc design. maher n/a.

Open the permit page

May 22, 2023In progress
issued Jan 2024
345 California StGci, Increv pa202103086103: rev to design/details of stairs and removal of fire door at 31/32 flrs; interior improvements on the 30/31/32 flrs. 30/31/32 demo of (e) stairs from floors 31-32. new communicating stairs through floors 30-32. maher n/a.
Details
Permit
202305228281
Status
issued
Filed
May 22, 2023
Permit issued
Jan 22, 2024
Address
345 California St

rev pa202103086103: rev to design/details of stairs and removal of fire door at 31/32 flrs; interior improvements on the 30/31/32 flrs. 30/31/32 demo of (e) stairs from floors 31-32. new communicating stairs through floors 30-32. maher n/a.

Open the permit page

May 3, 2023Completed
final sign-off Mar 2025
298 Alabama StBrennan Strong Hold Construction Incminor interior improvement on 2nd fl, new non-structural partitions & glazings, add 4 new doors and hardware, add new finishes to rooms, casings , basebaord & paint. replace (e) countertop @ island. mo exteropr work, mep/life safety deferred.
Details
Permit
202305037011
Status
complete
Filed
May 3, 2023
Permit issued
May 8, 2023
Final sign-off
Mar 18, 2025
Declared cost
$75,000
Address
298 Alabama St

minor interior improvement on 2nd fl, new non-structural partitions & glazings, add 4 new doors and hardware, add new finishes to rooms, casings , basebaord & paint. replace (e) countertop @ island. mo exteropr work, mep/life safety deferred.

Open the permit page

$75,000
Apr 14, 2023Never finaled
issued Apr 2023, no final
35 South ParkNovo Construction Incroof trellis and associated structural and penthouse deck. deferred submittal associated with prev approved permit 202008222419
Details
Permit
202304145730
Status
issued
Filed
Apr 14, 2023
Permit issued
Apr 25, 2023
Address
35 South Park

roof trellis and associated structural and penthouse deck. deferred submittal associated with prev approved permit 202008222419

Open the permit page

Jan 24, 2023Completed
final sign-off Jul 2023
35 South ParkNovo Construction Incadministrative permit to remove rooftop trellis scope of work from pa#202008222419. trellis owrk to be under seperate permit w/ structural design.
Details
Permit
202301240613
Status
complete
Filed
Jan 24, 2023
Permit issued
Jan 27, 2023
Final sign-off
Jul 18, 2023
Address
35 South Park

administrative permit to remove rooftop trellis scope of work from pa#202008222419. trellis owrk to be under seperate permit w/ structural design.

Open the permit page

Dec 21, 2022Completed
final sign-off Jun 2024
345 California StGci, Increvision to pa# 202109077835 to reconfigure office space and add one new all gender restroom. new millwork added, remove conference room 3022 from scope, remove millwork in breakroom.
Details
Permit
202212218840
Status
complete
Filed
Dec 21, 2022
Permit issued
Jan 13, 2023
Final sign-off
Jun 11, 2024
Address
345 California St

revision to pa# 202109077835 to reconfigure office space and add one new all gender restroom. new millwork added, remove conference room 3022 from scope, remove millwork in breakroom.

Open the permit page

Nov 18, 2022In progress
issued May 2024
720 Montgomery Stnew drink preparation and servery counter.
Details
Permit
202211186897
Status
issued
Filed
Nov 18, 2022
Permit issued
May 17, 2024
Declared cost
$18,000
Address
720 Montgomery St

new drink preparation and servery counter.

Open the permit page

$18,000
Jan 12, 2022Completed
final sign-off Apr 2022
150 California StM C S Construction Servicesdemo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems.
Details
Permit
202201125845
Status
complete
Filed
Jan 12, 2022
Permit issued
Jan 12, 2022
Final sign-off
Apr 15, 2022
Declared cost
$24,000
Address
150 California St

demo of non-structural partition & misc built in millwork. construct new partition to patch opening. patch & replace adjacent finishes/ceilings as needed. no impact to mep system or life/fire safety/sprinkler systems.

Open the permit page

$24,000
Jan 10, 2022Expired or cancelled
cancelled May 2024
2229 Webster StHutan Constructionnew foundation and voluntary seismic retrofit. new interior renovations second and third floors. new partitions, new millwork, new fixtures.
Details
Permit
202201105686
Status
cancelled
Filed
Jan 10, 2022
Permit issued
Aug 18, 2022
Declared cost
$360,000
Address
2229 Webster St

new foundation and voluntary seismic retrofit. new interior renovations second and third floors. new partitions, new millwork, new fixtures.

Open the permit page

$360,000
Nov 5, 2021Completed
final sign-off Mar 2022
2860 Sacramento StD3 Constructioninterior improvements on the 3rd fl includes a new non-structural partitions, new door, hardware, new lighting and ceiling, new finishes, new flooring, new plumbing, fixture & refinemant of a structural work
Details
Permit
202111051932
Status
complete
Filed
Nov 5, 2021
Permit issued
Nov 22, 2021
Final sign-off
Mar 28, 2022
Declared cost
$80,000
Address
2860 Sacramento St

interior improvements on the 3rd fl includes a new non-structural partitions, new door, hardware, new lighting and ceiling, new finishes, new flooring, new plumbing, fixture & refinemant of a structural work

Open the permit page

$80,000
Nov 5, 2021Completed
final sign-off Feb 2022
2856 Sacramento StD3 Constructionrevision to pa# 2021-0609-2024; refinement of structural wall on the 1st floor
Details
Permit
202111051924
Status
complete
Filed
Nov 5, 2021
Permit issued
Nov 15, 2021
Final sign-off
Feb 14, 2022
Declared cost
$2,000
Address
2856 Sacramento St

revision to pa# 2021-0609-2024; refinement of structural wall on the 1st floor

Open the permit page

$2,000
Sep 10, 2021Completed
final sign-off Dec 2021
535 Mission StSkyline Construction24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling.
Details
Permit
202109108195
Status
complete
Filed
Sep 10, 2021
Permit issued
Sep 28, 2021
Final sign-off
Dec 22, 2021
Declared cost
$165,000
Address
535 Mission St

24th fl: ti add two (2) new conference rooms and reception area. demolition of non-structural partitions. new non-structural partitions /glazing new lighting and ceiling.

Open the permit page

$165,000
Sep 7, 2021Completed
final sign-off Jun 2024
345 California St30th fl: demo of non-structural partitions, ceilings, finishes & hardwarre. new interior non-structural partitions & glazing, new doors & hardware, new lighting & ceiling, walls finishes & floor, new mep.
Details
Permit
202109077835
Status
complete
Filed
Sep 7, 2021
Permit issued
Oct 20, 2021
Final sign-off
Jun 11, 2024
Declared cost
$2,750,000
Address
345 California St

30th fl: demo of non-structural partitions, ceilings, finishes & hardwarre. new interior non-structural partitions & glazing, new doors & hardware, new lighting & ceiling, walls finishes & floor, new mep.

Open the permit page

$2,750,000
Jun 10, 2021Completed
final sign-off Mar 2022
21 South ParkNovo Construction Inc1st fl t.i.- new non structural partitions. revision to (e) mep distribution new finishies, flooring and furnitures. mep under sep permit
Details
Permit
202106102086
Status
complete
Filed
Jun 10, 2021
Permit issued
Aug 18, 2021
Final sign-off
Mar 2, 2022
Declared cost
$15,000
Address
21 South Park

1st fl t.i.- new non structural partitions. revision to (e) mep distribution new finishies, flooring and furnitures. mep under sep permit

Open the permit page

$15,000
May 24, 2021Completed
final sign-off Oct 2021
2858 Sacramento StD3 Constructioninterior improvements on the basement and 1st fl includes new structural footings and posts. 2nd fl new structural posts, non structural partitions, new door and hardware, new lighting, ceilings, new finishes, new flooring, new plumbing fixtures, new furniture.
Details
Permit
202105240902
Status
complete
Filed
May 24, 2021
Permit issued
May 26, 2021
Final sign-off
Oct 4, 2021
Declared cost
$50,000
Address
2858 Sacramento St

interior improvements on the basement and 1st fl includes new structural footings and posts. 2nd fl new structural posts, non structural partitions, new door and hardware, new lighting, ceilings, new finishes, new flooring, new plumbing fixtures, new furniture.

Open the permit page

$50,000
Apr 21, 2021Completed
final sign-off Nov 2021
1 Embarcadero CenterM C S Construction Servicesnew non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada compliance
Details
Permit
202104219049
Status
complete
Filed
Apr 21, 2021
Permit issued
May 24, 2021
Final sign-off
Nov 4, 2021
Declared cost
$285,000
Address
1 Embarcadero Center

new non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada compliance

Open the permit page

$285,000
Mar 8, 2021Never finaled
issued May 2021, no final
345 California StGci, Increvision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support.
Details
Permit
202103086103
Status
issued
Filed
Mar 8, 2021
Permit issued
May 12, 2021
Declared cost
$50,000
Address
345 California St

revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support.

Open the permit page

$50,000
Jan 6, 2021Completed
final sign-off Oct 2023
27 Maiden LnNovo Construction Incroof deck improvements: additional prefabricated pergola.
Details
Permit
202101062120
Status
complete
Filed
Jan 6, 2021
Permit issued
Jan 18, 2022
Final sign-off
Oct 10, 2023
Declared cost
$15,000
Address
27 Maiden Ln

roof deck improvements: additional prefabricated pergola.

Open the permit page

$15,000
Dec 24, 2020Completed
final sign-off Jul 2023
35 South ParkNovo Construction Incvoluntary structural upgrade for seismic strengthening. work is limited to new shotcrete walls and supporting foundations.
Details
Permit
202012241728
Status
complete
Filed
Dec 24, 2020
Permit issued
Feb 4, 2021
Final sign-off
Jul 18, 2023
Declared cost
$250,000
Address
35 South Park

voluntary structural upgrade for seismic strengthening. work is limited to new shotcrete walls and supporting foundations.

Open the permit page

$250,000
Sep 23, 2020Never finaled
issued Dec 2020, no final
345 California StGci, Inc30-31/f: new communicating stair on 30-31st floor: new non-structurual partitions m, new doors & hardware. new structural support.
Details
Permit
202009234825
Status
issued
Filed
Sep 23, 2020
Permit issued
Dec 1, 2020
Declared cost
$350,000
Address
345 California St

30-31/f: new communicating stair on 30-31st floor: new non-structurual partitions m, new doors & hardware. new structural support.

Open the permit page

$350,000
Sep 2, 2020Completed
final sign-off Sep 2021
27 Maiden LnNovo Construction Incinterior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck.
Details
Permit
202009023296
Status
complete
Filed
Sep 2, 2020
Permit issued
Feb 12, 2021
Final sign-off
Sep 30, 2021
Declared cost
$200,000
Address
27 Maiden Ln

interior improvements to incl new structural stair, new flooring and finishes. new flooring and furniture at roof deck.

Open the permit page

$200,000
Sep 2, 2020Completed
final sign-off Feb 2021
27 Maiden LnNovo Construction Inctenant improvement on 7th fl to include new non-structural patitions. new mep distribution, new lighting & ceiling. new millwork, finishes, flooring & furniture.
Details
Permit
202009023293
Status
complete
Filed
Sep 2, 2020
Permit issued
Dec 3, 2020
Final sign-off
Feb 26, 2021
Declared cost
$1,750,000
Address
27 Maiden Ln

tenant improvement on 7th fl to include new non-structural patitions. new mep distribution, new lighting & ceiling. new millwork, finishes, flooring & furniture.

Open the permit page

$1,750,000
Sep 2, 2020Completed
final sign-off Apr 2021
747 Front StNovo Construction Incinterior improvement on 1st fl to include demolition of non-structural patitions. revision to mep distribution. new electrical & plumbing. new lighting, ceilings, finishes, flooring & furniture.
Details
Permit
202009023288
Status
complete
Filed
Sep 2, 2020
Permit issued
Mar 1, 2021
Final sign-off
Apr 23, 2021
Declared cost
$1,013,000
Address
747 Front St

interior improvement on 1st fl to include demolition of non-structural patitions. revision to mep distribution. new electrical & plumbing. new lighting, ceilings, finishes, flooring & furniture.

Open the permit page

$1,013,000
Aug 31, 2020Completed
final sign-off Nov 2020
3 Embarcadero CenterM C S Construction Servicessuite #1420: new interior improvements. new inteiror non-structural partitions, new door & hardware, new glazing & frames, new wall & floor finishes.
Details
Permit
202008312999
Status
complete
Filed
Aug 31, 2020
Permit issued
Oct 14, 2020
Final sign-off
Nov 17, 2020
Declared cost
$8,000
Address
3 Embarcadero Center

suite #1420: new interior improvements. new inteiror non-structural partitions, new door & hardware, new glazing & frames, new wall & floor finishes.

Open the permit page

$8,000
Aug 22, 2020Never finaled
issued Mar 2022, no final
35 South ParkNovo Construction Inctenant improvement; new penthouse level, new non-structural partitions, new lighting and ceilings, new finishes, new flooring, and new furniture systems, maher n/a. deferred submittal for mep scope of work.
Details
Permit
202008222419
Status
reinstated
Filed
Aug 22, 2020
Permit issued
Mar 21, 2022
Final sign-off
Jul 18, 2023
Declared cost
$1,500,000
Address
35 South Park

tenant improvement; new penthouse level, new non-structural partitions, new lighting and ceilings, new finishes, new flooring, and new furniture systems, maher n/a. deferred submittal for mep scope of work.

Open the permit page

$1,500,000
Mar 16, 2020Completed
final sign-off Jan 2021
1 Embarcadero CenterGci, Inc35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferred
Details
Permit
202003167121
Status
complete
Filed
Mar 16, 2020
Permit issued
Mar 16, 2020
Final sign-off
Jan 8, 2021
Declared cost
$25,000
Address
1 Embarcadero Center

35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferred

Open the permit page

$25,000
Mar 5, 2020Completed
final sign-off Jul 2020
345 California StGci, Incti on 25th & 26th fl: new interior non-structural partition to enclose (e) communicating stair, new non-structural partial height wall at reception.
Details
Permit
202003056254
Status
complete
Filed
Mar 5, 2020
Permit issued
Mar 9, 2020
Final sign-off
Jul 15, 2020
Declared cost
$12,000
Address
345 California St

ti on 25th & 26th fl: new interior non-structural partition to enclose (e) communicating stair, new non-structural partial height wall at reception.

Open the permit page

$12,000
Feb 6, 2020Completed
final sign-off Aug 2020
345 California StGci, Incinterior improvements on the 11th floor. n/a
Details
Permit
202002063714
Status
complete
Filed
Feb 6, 2020
Permit issued
Feb 19, 2020
Final sign-off
Aug 4, 2020
Declared cost
$95,000
Address
345 California St

interior improvements on the 11th floor. n/a

Open the permit page

$95,000
Nov 12, 2019Completed
final sign-off Aug 2020
4 Embarcadero CenterGci, Incnew interior improvements noin structural partitions, new wall and flooring finishes, new millwork, plumbing fixtures, dfh, glazing and frames, meps fire alarm deferred maher not req
Details
Permit
201911127069
Status
complete
Filed
Nov 12, 2019
Permit issued
Nov 13, 2019
Final sign-off
Aug 10, 2020
Declared cost
$2,500,000
Address
4 Embarcadero Center

new interior improvements noin structural partitions, new wall and flooring finishes, new millwork, plumbing fixtures, dfh, glazing and frames, meps fire alarm deferred maher not req

Open the permit page

$2,500,000
Oct 7, 2019Completed
final sign-off Dec 2019
1088 Sansome StBrennan Strong Hold Construction Incto show exact layout of office conversion.
Details
Permit
201910073788
Status
complete
Filed
Oct 7, 2019
Permit issued
Oct 22, 2019
Final sign-off
Dec 30, 2019
Address
1088 Sansome St

to show exact layout of office conversion.

Open the permit page

Jul 23, 2019Completed
final sign-off Dec 2019
4 Embarcadero CenterSource Planning And Construction Increvision to pa 2018-1203-7203 and 2019-0312-4971. reconfigure office space
Details
Permit
201907236645
Status
complete
Filed
Jul 23, 2019
Permit issued
Jul 25, 2019
Final sign-off
Dec 5, 2019
Address
4 Embarcadero Center

revision to pa 2018-1203-7203 and 2019-0312-4971. reconfigure office space

Open the permit page

Mar 12, 2019Completed
final sign-off Dec 2019
4 Embarcadero CenterSource Planning And Construction Inc25th flr- revision to 201812037203 maher na
Details
Permit
201903124971
Status
complete
Filed
Mar 12, 2019
Permit issued
Mar 12, 2019
Final sign-off
Dec 5, 2019
Address
4 Embarcadero Center

25th flr- revision to 201812037203 maher na

Open the permit page

Jan 23, 2019Completed
final sign-off May 2019
1 Embarcadero CenterSkyline Construction38th floor: t.i. to include new partitions, doors and hardware, glazing and frames, millwork, ceiling. mep, life safety and fire sprinkler under seperate permit. n/a for maher
Details
Permit
201901230964
Status
complete
Filed
Jan 23, 2019
Permit issued
Jan 28, 2019
Final sign-off
May 17, 2019
Declared cost
$600,000
Address
1 Embarcadero Center

38th floor: t.i. to include new partitions, doors and hardware, glazing and frames, millwork, ceiling. mep, life safety and fire sprinkler under seperate permit. n/a for maher

Open the permit page

$600,000
Dec 3, 2018Completed
final sign-off Dec 2019
4 Embarcadero CenterSource Planning And Construction Inc25th fl - demo of (e) non structural partitions. (n) non-structural paritions, meps, life safety & sprinkler under separate permit
Details
Permit
201812037203
Status
complete
Filed
Dec 3, 2018
Permit issued
Dec 20, 2018
Final sign-off
Dec 5, 2019
Declared cost
$272,000
Address
4 Embarcadero Center

25th fl - demo of (e) non structural partitions. (n) non-structural paritions, meps, life safety & sprinkler under separate permit

Open the permit page

$272,000
Aug 23, 2018Completed
final sign-off Jan 2019
1 Embarcadero CenterSkyline Construction36th flr. interior tenant improvement, demo of non-structural partitions, new partitions, new doors and hardware, millwork & finishes
Details
Permit
201808238154
Status
complete
Filed
Aug 23, 2018
Permit issued
Aug 30, 2018
Final sign-off
Jan 15, 2019
Declared cost
$1,003,145
Address
1 Embarcadero Center

36th flr. interior tenant improvement, demo of non-structural partitions, new partitions, new doors and hardware, millwork & finishes

Open the permit page

$1,003,145
Jul 10, 2018Completed
final sign-off Nov 2019
160 Spear StNovo Construction Inc14th fl - demo of non-structural partitions doors & millwork. new non-structural partitions, new doors, flooring, finishes, new break area. mep & fire life safety under separate permit
Details
Permit
201807104079
Status
complete
Filed
Jul 10, 2018
Permit issued
Jul 25, 2018
Final sign-off
Nov 20, 2019
Declared cost
$86,250
Address
160 Spear St

14th fl - demo of non-structural partitions doors & millwork. new non-structural partitions, new doors, flooring, finishes, new break area. mep & fire life safety under separate permit

Open the permit page

$86,250
Apr 20, 2018Completed
final sign-off Oct 2018
2060 Divisadero StLarkspur Builders Inc.demo of non structural walls, doors in response to planning enforcement 201800279 enf to re-establish 2 dwelling units and 1 business space; new walls, doors, plumbingm, ceiling, stairs.
Details
Permit
201804206942
Status
complete
Filed
Apr 20, 2018
Permit issued
Jul 6, 2018
Final sign-off
Oct 3, 2018
Declared cost
$25,000
Address
2060 Divisadero St

demo of non structural walls, doors in response to planning enforcement 201800279 enf to re-establish 2 dwelling units and 1 business space; new walls, doors, plumbingm, ceiling, stairs.

Open the permit page

$25,000
Dec 8, 2017Completed
final sign-off Aug 2020
2602 Pacific Avrevision to 2016-0513-7389. replace (e) skylights with (n) skylights. extent terrace deck to align with flat roof below.
Details
Permit
201712085983
Status
complete
Filed
Dec 8, 2017
Permit issued
Jan 24, 2018
Final sign-off
Aug 4, 2020
Declared cost
$15,000
Address
2602 Pacific Av

revision to 2016-0513-7389. replace (e) skylights with (n) skylights. extent terrace deck to align with flat roof below.

Open the permit page

$15,000
Aug 7, 2017Never finaled
issued Aug 2017, no final
140 New Montgomery StSkyline Construction20th fl - interior non-structural partitions, ceilings, doors & hardware. mep under separate permit. n/a ordinance #155-13
Details
Permit
201708074050
Status
issued
Filed
Aug 7, 2017
Permit issued
Aug 9, 2017
Declared cost
$340,000
Address
140 New Montgomery St

20th fl - interior non-structural partitions, ceilings, doors & hardware. mep under separate permit. n/a ordinance #155-13

Open the permit page

$340,000
Jun 30, 2017Completed
final sign-off May 2018
65 Alpine TrPinkowski Constructiondeck extension and new stair to grade, reconfiguration of 1st floor, install new french doors, replace extg door with window, new lighting, plumbing fixtures and finishes.
Details
Permit
201706300878
Status
complete
Filed
Jun 30, 2017
Permit issued
Aug 31, 2017
Final sign-off
May 24, 2018
Declared cost
$65,000
Address
65 Alpine Tr

deck extension and new stair to grade, reconfiguration of 1st floor, install new french doors, replace extg door with window, new lighting, plumbing fixtures and finishes.

Open the permit page

$65,000
May 1, 2017Completed
final sign-off Dec 2017
2060 Divisadero StD3 Constructionunit 2: renovation of (e) apts on 2nd and 3rd fl. work includes new partitions, fixtures, ceilings, doors, finishes, 1 new bathroom. no work gr fl. no exterior work
Details
Permit
201705015337
Status
complete
Filed
May 1, 2017
Permit issued
May 10, 2017
Final sign-off
Dec 21, 2017
Declared cost
$40,000
Address
2060 Divisadero St

unit 2: renovation of (e) apts on 2nd and 3rd fl. work includes new partitions, fixtures, ceilings, doors, finishes, 1 new bathroom. no work gr fl. no exterior work

Open the permit page

$40,000
Apr 12, 2017Completed
final sign-off Jan 2018
2060 Divisadero StD3 Constructiondemo of (e) slab & post for new voluntary structural foundation upgrade. new stair & ramps for level change, new ceiling, light fixtures & floor finishes maher na
Details
Permit
201704123828
Status
complete
Filed
Apr 12, 2017
Permit issued
Apr 18, 2017
Final sign-off
Jan 2, 2018
Declared cost
$30,000
Address
2060 Divisadero St

demo of (e) slab & post for new voluntary structural foundation upgrade. new stair & ramps for level change, new ceiling, light fixtures & floor finishes maher na

Open the permit page

$30,000
Apr 4, 2017Completed
final sign-off Dec 2017
2060 Divisadero StD3 Constructionchange of use of ground floor bar to office. no construction under this permit, no change upper units.
Details
Permit
201704043152
Status
complete
Filed
Apr 4, 2017
Permit issued
Apr 18, 2017
Final sign-off
Dec 29, 2017
Address
2060 Divisadero St

change of use of ground floor bar to office. no construction under this permit, no change upper units.

Open the permit page

Dec 30, 2016Completed
final sign-off Nov 2017
150 Spear StPrincipal Builders Inc.14th: ti- to demo and construct new partitions, millwork, doors and finishing mep/fire/life safety will be submitted sep. maher na
Details
Permit
201612306308
Status
complete
Filed
Dec 30, 2016
Permit issued
Feb 21, 2017
Final sign-off
Nov 22, 2017
Declared cost
$250,000
Address
150 Spear St

14th: ti- to demo and construct new partitions, millwork, doors and finishing mep/fire/life safety will be submitted sep. maher na

Open the permit page

$250,000
May 13, 2016Completed
final sign-off Nov 2018
2602 Pacific Avrevison to approved site permit & addendum under 2014-11-24-2346. changes include horizontal expansion on 3rd floor, exterior walls & siding (in rear), (n) terrace, interior changes.
Details
Permit
201605137389
Status
complete
Filed
May 13, 2016
Permit issued
Apr 13, 2017
Final sign-off
Nov 20, 2018
Declared cost
$65,000
Address
2602 Pacific Av

revison to approved site permit & addendum under 2014-11-24-2346. changes include horizontal expansion on 3rd floor, exterior walls & siding (in rear), (n) terrace, interior changes.

Open the permit page

$65,000
May 10, 2016Completed
final sign-off Aug 2017
1 Sansome StNovo Construction Inc42nd floor: ti new interior partitions, new and relocated mep distribution, new finishes.
Details
Permit
201605106998
Status
complete
Filed
May 10, 2016
Permit issued
Jun 6, 2016
Final sign-off
Aug 17, 2017
Declared cost
$200,000
Address
1 Sansome St

42nd floor: ti new interior partitions, new and relocated mep distribution, new finishes.

Open the permit page

$200,000
May 2, 2016Never finaled
issued May 2016, no final
1 Embarcadero CenterSkyline Constructioninterior t.i. on the 40/f, removal of all existing partitions, new interior non-structural partitions, new doors, hardware, new ceiling and lighting, new finishes, mep. under seperate permit. n/a ordinance #155-13
Details
Permit
201605026247
Status
issued
Filed
May 2, 2016
Permit issued
May 2, 2016
Declared cost
$75,000
Address
1 Embarcadero Center

interior t.i. on the 40/f, removal of all existing partitions, new interior non-structural partitions, new doors, hardware, new ceiling and lighting, new finishes, mep. under seperate permit. n/a ordinance #155-13

Open the permit page

$75,000
Dec 30, 2015Completed
final sign-off Dec 2016
1 Sansome StNovo Construction Inc41st flr: new interior non-structural partitions, new & relocated mep distribution, new lighting & ceilings, new doors & hardware,new casework, new finishes; maher n/a
Details
Permit
201512306105
Status
complete
Filed
Dec 30, 2015
Permit issued
Dec 30, 2015
Final sign-off
Dec 13, 2016
Declared cost
$1,850,000
Address
1 Sansome St

41st flr: new interior non-structural partitions, new & relocated mep distribution, new lighting & ceilings, new doors & hardware,new casework, new finishes; maher n/a

Open the permit page

$1,850,000
Oct 14, 2015Completed
final sign-off Apr 2016
3511 Clay StAaron Gordon Construction Incdemolition of existing balcony metal railing to be replaced with new metal railing. addition of ne entry decorative metal, new exterior paint
Details
Permit
201510149634
Status
complete
Filed
Oct 14, 2015
Permit issued
Oct 28, 2015
Final sign-off
Apr 5, 2016
Declared cost
$10,000
Address
3511 Clay St

demolition of existing balcony metal railing to be replaced with new metal railing. addition of ne entry decorative metal, new exterior paint

Open the permit page

$10,000
Sep 1, 2015Completed
final sign-off Oct 2016
1 Sansome StNovo Construction Inc38th floor tenant improvement - new non-structural partitions, new & relocated mep distribution, new lighting ceilings, new doors, casework & finishes.
Details
Permit
201509015751
Status
complete
Filed
Sep 1, 2015
Permit issued
Sep 30, 2015
Final sign-off
Oct 28, 2016
Declared cost
$1,000,000
Address
1 Sansome St

38th floor tenant improvement - new non-structural partitions, new & relocated mep distribution, new lighting ceilings, new doors, casework & finishes.

Open the permit page

$1,000,000
Aug 24, 2015Completed
final sign-off Jan 2016
3037 California StD3 Constructioninterior & minor exterior improvements on attic level: new dormer window, skylights; new interior furred partitions & roof deck for thermal improvements; new lighting, new fixtures.
Details
Permit
201508245087
Status
complete
Filed
Aug 24, 2015
Permit issued
Sep 9, 2015
Final sign-off
Jan 13, 2016
Declared cost
$35,000
Address
3037 California St

interior & minor exterior improvements on attic level: new dormer window, skylights; new interior furred partitions & roof deck for thermal improvements; new lighting, new fixtures.

Open the permit page

$35,000
Aug 5, 2015Completed
final sign-off Apr 2017
28 Fremont StNovo Construction Incground floor: revision to pa 2015 0126 6675: mechanical, electrical & plumbing, & elevation changes. no exterior work or change of use. maher na
Details
Permit
201508053350
Status
complete
Filed
Aug 5, 2015
Permit issued
Sep 16, 2015
Final sign-off
Apr 7, 2017
Address
28 Fremont St

ground floor: revision to pa 2015 0126 6675: mechanical, electrical & plumbing, & elevation changes. no exterior work or change of use. maher na

Open the permit page

Jul 13, 2015Completed
final sign-off Jan 2016
55 02nd StSkyline Construction4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13
Details
Permit
201507131278
Status
complete
Filed
Jul 13, 2015
Permit issued
Jul 13, 2015
Final sign-off
Jan 21, 2016
Declared cost
$30,000
Address
55 02nd St

4th fl: interior non-structural demolition to include removal of full height partition & associate glazing per ab-017. n/a ordinance #155-13

Open the permit page

$30,000
Apr 17, 2015Expired or cancelled
cancelled Mar 2019
456 Montgomery Stpartial exterior improvements to include new canopy above (e) doors, new exterior lighting, new structural awning supports. new finishes to match (e) facade. ** maher: compliance with oridnance no# 155-13 not required **
Details
Permit
201504173894
Status
cancelled
Filed
Apr 17, 2015
Declared cost
$20,000
Address
456 Montgomery St

partial exterior improvements to include new canopy above (e) doors, new exterior lighting, new structural awning supports. new finishes to match (e) facade. ** maher: compliance with oridnance no# 155-13 not required **

Open the permit page

$20,000
Mar 23, 2015Completed
final sign-off Nov 2015
340 Pine StRossi Builders Inc.revision to appl #2015.0206.7665 - delete (n) conference room from scope of work & back to storage room. (e) solid concrete shaft walls & rated doors to remain. n/a marher ordinance
Details
Permit
201503231541
Status
complete
Filed
Mar 23, 2015
Permit issued
Mar 23, 2015
Final sign-off
Nov 18, 2015
Address
340 Pine St

revision to appl #2015.0206.7665 - delete (n) conference room from scope of work & back to storage room. (e) solid concrete shaft walls & rated doors to remain. n/a marher ordinance

Open the permit page

Feb 6, 2015Never finaled
issued Feb 2015, no final
1 Sansome StNovo Construction Incsuite# 4000. t.i. on 40th floor to include removal of existing partial & full height partitions @ stairs. new interior non-structural partitions.
Details
Permit
201502067694
Status
issued
Filed
Feb 6, 2015
Permit issued
Feb 17, 2015
Declared cost
$600,000
Address
1 Sansome St

suite# 4000. t.i. on 40th floor to include removal of existing partial & full height partitions @ stairs. new interior non-structural partitions.

Open the permit page

$600,000
Feb 6, 2015Completed
final sign-off May 2015
530 Washington StNuco Dba Premier Construction Servicesimprovement to 2/f offices: remove & replace partitions, new doors, hardware & finishes, paint & carpet. n/a ordinance #155-13
Details
Permit
201502067672
Status
complete
Filed
Feb 6, 2015
Permit issued
Mar 5, 2015
Final sign-off
May 28, 2015
Declared cost
$120,250
Address
530 Washington St

improvement to 2/f offices: remove & replace partitions, new doors, hardware & finishes, paint & carpet. n/a ordinance #155-13

Open the permit page

$120,250
Feb 6, 2015Completed
final sign-off Nov 2015
340 Pine StRossi Builders Inc.t.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with maher ordinance no 155-13 not required.
Details
Permit
201502067665
Status
complete
Filed
Feb 6, 2015
Permit issued
Mar 2, 2015
Final sign-off
Nov 18, 2015
Declared cost
$850,000
Address
340 Pine St

t.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with maher ordinance no 155-13 not required.

Open the permit page

$850,000
Jan 27, 2015Completed
final sign-off Nov 2015
340 Pine StRossi Builders Inc.t.i. in basement level, removal of (e) full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13
Details
Permit
201501276729
Status
complete
Filed
Jan 27, 2015
Permit issued
Feb 18, 2015
Final sign-off
Nov 17, 2015
Declared cost
$65,000
Address
340 Pine St

t.i. in basement level, removal of (e) full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13

Open the permit page

$65,000
Jan 8, 2015Completed
final sign-off Nov 2015
340 Pine StRossi Builders Inc.basement demo only - ermoval of (e) full & ceiling height interior partitions per ab-017. n/a maher ordinance
Details
Permit
201501085252
Status
complete
Filed
Jan 8, 2015
Permit issued
Jan 9, 2015
Final sign-off
Nov 18, 2015
Declared cost
$30,000
Address
340 Pine St

basement demo only - ermoval of (e) full & ceiling height interior partitions per ab-017. n/a maher ordinance

Open the permit page

$30,000
Nov 24, 2014Completed
final sign-off Nov 2018
2602 Pacific Avinterior t.i. on all 4 floors. minor horizontal expansion in rear on floors 1,3,& 4. (n) seismic reinforcement, (n) window, doors, hardware, finishes, lighting, plumbing.
Details
Permit
201411242346
Status
complete
Filed
Nov 24, 2014
Permit issued
Dec 1, 2015
Final sign-off
Nov 19, 2018
Declared cost
$200,000
Address
2602 Pacific Av

interior t.i. on all 4 floors. minor horizontal expansion in rear on floors 1,3,& 4. (n) seismic reinforcement, (n) window, doors, hardware, finishes, lighting, plumbing.

Open the permit page

$200,000
Nov 19, 2014Completed
final sign-off Dec 2015
151 10th StNovo Construction Incdemolition of existing non structural partitions, interior glazing, doors & frames. demo per ab-017. n/a ordinance #155-13
Details
Permit
201411191911
Status
complete
Filed
Nov 19, 2014
Permit issued
Nov 19, 2014
Final sign-off
Dec 17, 2015
Declared cost
$6,000
Address
151 10th St

demolition of existing non structural partitions, interior glazing, doors & frames. demo per ab-017. n/a ordinance #155-13

Open the permit page

$6,000
Oct 30, 2014Completed
final sign-off Dec 2014
2810 Clay StD3 Constructionrevision changes a.00 to reflect non sprinklered status to pa #2013.0918.7184-s1 - correction of error on documents: building is non sprinklered, drawings state bldg is partially sprinklered. n/a marher ordinance
Details
Permit
201410300372
Status
complete
Filed
Oct 30, 2014
Permit issued
Oct 30, 2014
Final sign-off
Dec 17, 2014
Address
2810 Clay St

revision changes a.00 to reflect non sprinklered status to pa #2013.0918.7184-s1 - correction of error on documents: building is non sprinklered, drawings state bldg is partially sprinklered. n/a marher ordinance

Open the permit page

Oct 23, 2014Never finaled
issued Nov 2014, no final
2602 Pacific Avvoluntary seismic upgrade of 4 story single family home.
Details
Permit
201410239739
Status
issued
Filed
Oct 23, 2014
Permit issued
Nov 19, 2014
Declared cost
$100,000
Address
2602 Pacific Av

voluntary seismic upgrade of 4 story single family home.

Open the permit page

$100,000
Oct 10, 2014Completed
final sign-off Dec 2014
3079 16th StSpeedy Construction ****See Notetitle 24 submittal 201406138318 & 201409032487
Details
Permit
201410108664
Status
complete
Filed
Oct 10, 2014
Permit issued
Oct 10, 2014
Final sign-off
Dec 17, 2014
Address
3079 16th St

title 24 submittal 201406138318 & 201409032487

Open the permit page

Jun 13, 2014Completed
final sign-off Dec 2014
3079 16th StSpeedy Construction ****See Noteconstruction of entry/egress doors, path, toilet room to full compliance, bar and lower back bar, built in seating, lighting, demo under separate permit.
Details
Permit
201406138318
Status
complete
Filed
Jun 13, 2014
Permit issued
Sep 3, 2014
Final sign-off
Dec 17, 2014
Declared cost
$45,000
Address
3079 16th St

construction of entry/egress doors, path, toilet room to full compliance, bar and lower back bar, built in seating, lighting, demo under separate permit.

Open the permit page

$45,000
Jun 6, 2014Completed
final sign-off Dec 2014
3079 16th StSpeedy Construction ****See Notedemo non complaint toilet baths, front lower back bar, mezzanine storage area, landing at non functional stair. demo work only for future t.i. ab-017 applies
Details
Permit
201406067712
Status
complete
Filed
Jun 6, 2014
Permit issued
Jun 11, 2014
Final sign-off
Dec 17, 2014
Declared cost
$4,000
Address
3079 16th St

demo non complaint toilet baths, front lower back bar, mezzanine storage area, landing at non functional stair. demo work only for future t.i. ab-017 applies

Open the permit page

$4,000
Apr 2, 2014Never finaled
issued Apr 2014, no final
465 California StRossi Builders Inc., Roebuck Constructionrevision to appl #2013.0816.4527 with sheet #'s a3.0,a6.0 & a9.0 amended to illustrate a waterproof membrane as requested by the bldg inspector. compliance with ordinance #155-13 not required
Details
Permit
201404022260
Status
issued
Filed
Apr 2, 2014
Permit issued
Apr 7, 2014
Address
465 California St

revision to appl #2013.0816.4527 with sheet #'s a3.0,a6.0 & a9.0 amended to illustrate a waterproof membrane as requested by the bldg inspector. compliance with ordinance #155-13 not required

Open the permit page

Apr 2, 2014Never finaled
issued Apr 2014, no final
140 New Montgomery StSkyline Construction20th floor: interior improvements on the 20th floor to include, new non structural partitions, mep distribution,new lighting and ceilings, new doors hardware and finishes.n/a for the maher ordinance #155-13 and interim ordinance #428-13
Details
Permit
201404022250
Status
issued
Filed
Apr 2, 2014
Permit issued
Apr 21, 2014
Declared cost
$900,000
Address
140 New Montgomery St

20th floor: interior improvements on the 20th floor to include, new non structural partitions, mep distribution,new lighting and ceilings, new doors hardware and finishes.n/a for the maher ordinance #155-13 and interim ordinance #428-13

Open the permit page

$900,000
Jan 30, 2014Never finaled
issued Feb 2014, no final
360 Pine StRoebuck Constructiontenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required.
Details
Permit
201401307400
Status
issued
Filed
Jan 30, 2014
Permit issued
Feb 14, 2014
Declared cost
$135,000
Address
360 Pine St

tenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required.

Open the permit page

$135,000
Dec 12, 2013Never finaled
issued Dec 2013, no final
3198 16th StNorthern Sun Associatesnon-structural interior demolition only, removal of interior finishes & non structural partition walls. ti under separate permit.
Details
Permit
201312123979
Status
issued
Filed
Dec 12, 2013
Permit issued
Dec 12, 2013
Declared cost
$4,500
Address
3198 16th St

non-structural interior demolition only, removal of interior finishes & non structural partition walls. ti under separate permit.

Open the permit page

$4,500
Nov 26, 2013Completed
final sign-off Mar 2014
607 Front StNovo Construction Incnew interior non-structural partitions, new restrooms, relocate doors and hardware and finishes. mep, fire sprinkler& life safety under separate permit.
Details
Permit
201311262860
Status
complete
Filed
Nov 26, 2013
Permit issued
Dec 2, 2013
Final sign-off
Mar 18, 2014
Declared cost
$263,000
Address
607 Front St

new interior non-structural partitions, new restrooms, relocate doors and hardware and finishes. mep, fire sprinkler& life safety under separate permit.

Open the permit page

$263,000
Sep 18, 2013Completed
final sign-off Dec 2014
2810 Clay StD3 Constructionunit reduction via merger: 3 into 2 units. unit #1 no work. unit 2 & 3 merge units. remove non bearing partiition. remove range + refrigerator from unit 3 covert top level kitchen to laundry. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201309187184
Status
complete
Filed
Sep 18, 2013
Permit issued
Feb 20, 2014
Final sign-off
Dec 17, 2014
Declared cost
$1,000
Address
2810 Clay St

unit reduction via merger: 3 into 2 units. unit #1 no work. unit 2 & 3 merge units. remove non bearing partiition. remove range + refrigerator from unit 3 covert top level kitchen to laundry. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$1,000