Block 0135, lot 009
1088 Sansome St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 4
- Building
- 63,288 sq ft
- Lot
- 15,386 sq ft
- Zoning
- C2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 1088 Sansome St | Brennan Strong Hold Construction Inc | mep for pa 202408078163 move (e) fan coil to enclosed room; install 2x new in wall fan in same roomDetails
mep for pa 202408078163 move (e) fan coil to enclosed room; install 2x new in wall fan in same room | $3,000 |
| Aug 7, 2024 | Completed final sign-off Jan 2025 | 1088 Sansome St | Brennan Strong Hold Construction Inc | minor ti on the basement level only. new interior non structural partition, new door, and hardware. new glazing and frame. minor alteration to floor finish and ceiling finish. no change to mechanical or plumbing.Details
minor ti on the basement level only. new interior non structural partition, new door, and hardware. new glazing and frame. minor alteration to floor finish and ceiling finish. no change to mechanical or plumbing. | $30,000 |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 1088 Sansome St | Edison Fire Extinguisher Company Inc | ul fire suppression system installation. recirculating fan applianceDetails
ul fire suppression system installation. recirculating fan appliance | $1,400 |
| Oct 7, 2019 | Completed final sign-off Dec 2019 | 1088 Sansome St | Brennan Strong Hold Construction Inc | to show exact layout of office conversion.Details
to show exact layout of office conversion. | |
| Jul 23, 2019 | Never finaled issued Jul 2019, no final | 1088 Sansome St | Edison Fire Extinguisher Company Inc | ul fire suppression system installation. recirculating fan applianceDetails
ul fire suppression system installation. recirculating fan appliance | $2,150 |
| Mar 19, 2019 | Never finaled issued Mar 2019, no final | 1088 Sansome St | Brennan Strong Hold Construction Inc | installation of new mechanical in cold storage area. electrical & lighting & t-24. ref #201812118042, retail mechanical install approved under reference permit 201812118042Details
installation of new mechanical in cold storage area. electrical & lighting & t-24. ref #201812118042, retail mechanical install approved under reference permit 201812118042 | $60,000 |
| Feb 26, 2019 | Completed final sign-off Feb 2020 | 1088 Sansome St | Battalion One Fire Protection | due to ti in the basement, new notification appliances will be installed & tie-in to (e) notification cirucit. install new monitor module to tie in ansul system to existing panel to be monitor 2018-1211-8042 and 2018-0912-9831Details
due to ti in the basement, new notification appliances will be installed & tie-in to (e) notification cirucit. install new monitor module to tie in ansul system to existing panel to be monitor 2018-1211-8042 and 2018-0912-9831 | $3,500 |
| Dec 13, 2018 | Completed final sign-off Apr 2019 | 1088 Sansome St | Battalion One Fire Protection | as-builts to pa #201809129831. relocate existing power supply panel #1 from 2nd fl to1st fl next to panel. revised point numbers for modules & notificaion on circuits run on fl plans & risers.Details
as-builts to pa #201809129831. relocate existing power supply panel #1 from 2nd fl to1st fl next to panel. revised point numbers for modules & notificaion on circuits run on fl plans & risers. | |
| Dec 11, 2018 | Completed final sign-off Aug 2020 | 1088 Sansome St | Brennan Strong Hold Construction Inc | architectural design of new interior non structural partition, new doors and hardware, new glazing and frames, new walls and flooring new lighting and hvac, new kitchen, no exterior workDetails
architectural design of new interior non structural partition, new doors and hardware, new glazing and frames, new walls and flooring new lighting and hvac, new kitchen, no exterior work | $150,000 |
| Nov 20, 2018 | Completed final sign-off May 2019 | 1088 Sansome St | Brennan Strong Hold Construction Inc | addition of 2 new skylights at roof. for structual ref 201807124445Details
addition of 2 new skylights at roof. for structual ref 201807124445 | $50,000 |
| Sep 12, 2018 | Completed final sign-off Apr 2019 | 1088 Sansome St | Battalion One Fire Protection | due to ti on all floors, new notification applianes will be installed thru out tie in to new power supply panels. some e devices will be relocated to new location. install relay modules for duct detectores. new devices will be tied into ex controlDetails
due to ti on all floors, new notification applianes will be installed thru out tie in to new power supply panels. some e devices will be relocated to new location. install relay modules for duct detectores. new devices will be tied into ex control | $20,000 |
| Aug 27, 2018 | Completed final sign-off Apr 2021 | 1088 Sansome St | Louis Devereux Landscapes, Brennan Strong Hold Construction Inc | (n) exterior improvements on penthouse level (roof). add (n) flooring deck and railingsDetails
(n) exterior improvements on penthouse level (roof). add (n) flooring deck and railings | $50,000 |
| Aug 20, 2018 | Completed final sign-off May 2019 | 1088 Sansome St | Brennan Strong Hold Construction Inc | administrative permit revision to 2018-0712-4445 to document pyament of fees based on an increased valuation. original valuation of $900,000. new valuation 2,150,000 - fees due on additional 1,250,000Details
administrative permit revision to 2018-0712-4445 to document pyament of fees based on an increased valuation. original valuation of $900,000. new valuation 2,150,000 - fees due on additional 1,250,000 | $1,250,000 |
| Aug 17, 2018 | Completed final sign-off Nov 2018 | 1088 Sansome St | W C Plumbing & Fire Protection | install (179) pendent heads below, new drop ceiling per nfpa#13.Details
install (179) pendent heads below, new drop ceiling per nfpa#13. | $30,000 |
| Jul 18, 2018 | Never finaled filed Jul 2018, never issued | 1088 Sansome St | street spaceDetails
street space | ||
| Jul 12, 2018 | Completed final sign-off May 2019 | 1088 Sansome St | Brennan Strong Hold Construction Inc | no exterior work. ti - basement 1,2,3 and penthouse. arch design of interior partitions new doors, glazing, flooring, finishes, millwork. electrical, mechancial, plumbing, reinforce rooftop structural for egress purposes. n/a for maher.Details
no exterior work. ti - basement 1,2,3 and penthouse. arch design of interior partitions new doors, glazing, flooring, finishes, millwork. electrical, mechancial, plumbing, reinforce rooftop structural for egress purposes. n/a for maher. | $900,000 |
| Jul 3, 2018 | Completed final sign-off Nov 2018 | 1088 Sansome St | Thomas Swan Sign Co Inc | to erect (2) non-illuminated wall signs. **maher n/a**Details
to erect (2) non-illuminated wall signs. **maher n/a** | $5,000 |
| Dec 7, 2016 | Never finaled issued Dec 2016, no final | 1088 Sansome St | Battalion One Fire Protection | as-builts to 201605318754,relocate control panel,sd, & pull stn from basement to 1st flr elec rm.delete waterflow & tamper switches from 1st,2nd & 3rd flr(not installed).delete strobes from both rms @basement & pent house(not installed)relocate relay modules to new emr #1from roof to bsmt.Details
as-builts to 201605318754,relocate control panel,sd, & pull stn from basement to 1st flr elec rm.delete waterflow & tamper switches from 1st,2nd & 3rd flr(not installed).delete strobes from both rms @basement & pent house(not installed)relocate relay modules to new emr #1from roof to bsmt. | $2,500 |
| Nov 18, 2016 | Completed final sign-off Nov 2016 | 1088 Sansome St | Magnum Construction Group Inc | extend 10 pendent drop at remodeled restroom @ 2,3,4, floors. replace existing sprinkler heads with new. total 791 heads. ref ti 2016-0211-9364.Details
extend 10 pendent drop at remodeled restroom @ 2,3,4, floors. replace existing sprinkler heads with new. total 791 heads. ref ti 2016-0211-9364. | $45,000 |
| Oct 6, 2016 | Completed final sign-off Mar 2017 | 1088 Sansome St | Brennan Strong Hold Construction Inc | revision to 201602119364 (e) concrete infill to remain on sansome between 1st & 2nd flr between grid line g & f. (e) concrete infill panel to remain as is on green st between basement abd 1st fl gride line 5-6Details
revision to 201602119364 (e) concrete infill to remain on sansome between 1st & 2nd flr between grid line g & f. (e) concrete infill panel to remain as is on green st between basement abd 1st fl gride line 5-6 | |
| Jul 28, 2016 | Completed final sign-off Mar 2017 | 1088 Sansome St | Brennan Strong Hold Construction Inc | revision to ref pa 201602119364 - provide detail and measurement of where we cut out (e) concrete panels and replace with new windows per approved drawing.Details
revision to ref pa 201602119364 - provide detail and measurement of where we cut out (e) concrete panels and replace with new windows per approved drawing. | |
| Jul 28, 2016 | Completed final sign-off Nov 2018 | 1088 Sansome St | Brennan Strong Hold Construction Inc | replacement of (e) windows and storefront at penthouse/roofDetails
replacement of (e) windows and storefront at penthouse/roof | $12,000 |
| Jul 28, 2016 | Completed final sign-off Mar 2017 | 1088 Sansome St | Brennan Strong Hold Construction Inc | demo step up concrete slab at 1st flr between grid line a-1 and 1-2 infill with steel beam and paddeck. revision to ref pa 201602119364 to increase existing column size and remove bracing beams.Details
demo step up concrete slab at 1st flr between grid line a-1 and 1-2 infill with steel beam and paddeck. revision to ref pa 201602119364 to increase existing column size and remove bracing beams. | $30,000 |
| May 31, 2016 | Completed final sign-off Dec 2016 | 1088 Sansome St | Battalion One Fire Protection | installation of manual and automatic fire alarm system including fire alarm control panel, smoke det. & pull station & notification appliances in remodel core & shell vacant bldg. install monitor modules to tie in sprinkler devices to new panel & relay modules for elev. recall. ti #201602119364.Details
installation of manual and automatic fire alarm system including fire alarm control panel, smoke det. & pull station & notification appliances in remodel core & shell vacant bldg. install monitor modules to tie in sprinkler devices to new panel & relay modules for elev. recall. ti #201602119364. | $12,800 |
| Feb 11, 2016 | Never finaled issued Apr 2016, no final | 1088 Sansome St | Brennan Strong Hold Construction Inc | install new mechanical units for future tenants,core & shell improvements,construct new mens & women's restrm,unisex & showers,janitor closets & kitchens(basement thru 3rd flr);replacement of (e) non-historic windows,removal of select concrete panels along green st & sansome per sf planning cert ofDetails
install new mechanical units for future tenants,core & shell improvements,construct new mens & women's restrm,unisex & showers,janitor closets & kitchens(basement thru 3rd flr);replacement of (e) non-historic windows,removal of select concrete panels along green st & sansome per sf planning cert of | $110,000 |
| Jun 4, 2015 | Completed final sign-off Mar 2017 | 1088 Sansome St | Brennan Strong Hold Construction Inc | voluntary seismic strenthening, brace frames per plan. shotcrete east wall per plan. no exterior work. core & shell only, bldg is vacant. disable access defered to future t.i. permits as allowed by sfbc, ab-017. no exterior work.Details
voluntary seismic strenthening, brace frames per plan. shotcrete east wall per plan. no exterior work. core & shell only, bldg is vacant. disable access defered to future t.i. permits as allowed by sfbc, ab-017. no exterior work. | $500,000 |
| Sep 24, 2014 | Completed final sign-off Mar 2017 | 1088 Sansome St | Brennan Strong Hold Construction Inc | removal of interior finishes and provide tenant improvement under separate permit. ab-017 -- remove carpet, cabinets, suspension ceiling, partitions. no removal of fire rated walls and doors.Details
removal of interior finishes and provide tenant improvement under separate permit. ab-017 -- remove carpet, cabinets, suspension ceiling, partitions. no removal of fire rated walls and doors. | $20,000 |
| Mar 9, 2004 | Expired or cancelled expired May 2007 | 1088 Sansome St | National Systems Integration | provide s/d over panel (system sensor 2451) no plans required-emergency replacement of fire alarm deDetails
provide s/d over panel (system sensor 2451) no plans required-emergency replacement of fire alarm de | $3,506 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brennan Strong Hold Construction Inc (16), Battalion One Fire Protection (5), Edison Fire Extinguisher Company Inc (2), Louis Devereux Landscapes, Magnum Construction Group Inc, National Systems Integration, Thomas Swan Sign Co Inc, W C Plumbing & Fire Protection
- Architects
- Timothy Murphy (2)
- Engineers
- Meng Hsio Chen (2), Alan Burr, Antonio Jacksalem
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.