Block 3717, lot 010
160 Spear St
- City’s use
- Commercial Office
- Built
- 1985
- Stories
- 19
- Lot
- 9,453 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
130 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 22, 2026 | Completed final sign-off Jul 2026 | 160 Spear St | Skyline Construction | 17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18.Details
17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18. | $300,000 |
| Nov 12, 2025 | In progress filed Nov 2025, not yet issued | 160 Spear St | Air Systems Of Sacramento | 14/f: provide (n) cu and fc to serve av production room. cu and fc to be connected onto existing fire alarm system (by others). mount cu in ceiling. condensate to be piped to nearest termination point.Details
14/f: provide (n) cu and fc to serve av production room. cu and fc to be connected onto existing fire alarm system (by others). mount cu in ceiling. condensate to be piped to nearest termination point. | $9,500 |
| Dec 6, 2021 | Completed final sign-off Jan 2022 | 160 Spear St | R L H Fire Protection Inc | fire sprinkler: relocate 12, add 3 and remove 12 pendant sprinlers. install 18 new upright sprinklers. ref t.i. pa202106293445.Details
fire sprinkler: relocate 12, add 3 and remove 12 pendant sprinlers. install 18 new upright sprinklers. ref t.i. pa202106293445. | $7,500 |
| Jun 29, 2021 | Completed final sign-off Apr 2022 | 160 Spear St | Sc Builders, Inc | 10th floor: interior demo of non structural elements. construction of new offices, conference and pantry, mep, life safety and sprinkler permit under seperate permitDetails
10th floor: interior demo of non structural elements. construction of new offices, conference and pantry, mep, life safety and sprinkler permit under seperate permit | $325,000 |
| Aug 17, 2018 | Never finaled issued Aug 2018, no final | 160 Spear St | Gci, Inc | electrical - maintain some (e) lighting. 2nd fl. & 16th fl. restroom only. title 24 ref 201807063910 & 2018.07.06.3909Details
electrical - maintain some (e) lighting. 2nd fl. & 16th fl. restroom only. title 24 ref 201807063910 & 2018.07.06.3909 | $10,000 |
| Aug 17, 2018 | Never finaled issued Aug 2018, no final | 160 Spear St | Gci, Inc | mechanical - demo ductwork and install ductwork, suite 214. ref.2018.07.06.3910Details
mechanical - demo ductwork and install ductwork, suite 214. ref.2018.07.06.3910 | $7,000 |
| Jul 10, 2018 | Completed final sign-off Nov 2019 | 160 Spear St | Novo Construction Inc | 14th fl - demo of non-structural partitions doors & millwork. new non-structural partitions, new doors, flooring, finishes, new break area. mep & fire life safety under separate permitDetails
14th fl - demo of non-structural partitions doors & millwork. new non-structural partitions, new doors, flooring, finishes, new break area. mep & fire life safety under separate permit | $86,250 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 160 Spear St | Gci, Inc | 2nd floor:replace all interior restroom, finishes, new lighting, toilet partitions, sink and finishes "barrier removal"Details
2nd floor:replace all interior restroom, finishes, new lighting, toilet partitions, sink and finishes "barrier removal" | $70,000 |
| Jul 6, 2018 | Completed final sign-off Nov 2018 | 160 Spear St | Gci, Inc | # 214: demo and construction new partitions, glazing, door, and millwork.Details
# 214: demo and construction new partitions, glazing, door, and millwork. | $85,000 |
| Jul 6, 2018 | Never finaled issued Jul 2018, no final | 160 Spear St | Gci, Inc | 16th floor: upgrade barrier removal and replace all interior restroom, finishes, include new lighting. new toilet partitions, sink and finishesDetails
16th floor: upgrade barrier removal and replace all interior restroom, finishes, include new lighting. new toilet partitions, sink and finishes | $70,000 |
| Feb 6, 2018 | Completed final sign-off Jun 2018 | 160 Spear St | Skyline Construction | 11th flr - electrical work for ti ref 201801088016 maher naDetails
11th flr - electrical work for ti ref 201801088016 maher na | $2,000 |
| Jan 8, 2018 | Completed final sign-off Jun 2018 | 160 Spear St | Skyline Construction | suite 1100 - ti to include non structural partitions, doors, millwork. mep under sep permit maher naDetails
suite 1100 - ti to include non structural partitions, doors, millwork. mep under sep permit maher na | $40,000 |
| Jun 13, 2017 | Never finaled issued Jun 2017, no final | 160 Spear St | streetspaceDetails
streetspace | ||
| Mar 8, 2016 | Completed final sign-off Aug 2016 | 160 Spear St | Skyline Construction | 17th flr: mech & elect for ti. for ref pa 2015 1221 5597 maher naDetails
17th flr: mech & elect for ti. for ref pa 2015 1221 5597 maher na | $15,000 |
| Dec 22, 2014 | Completed final sign-off Jul 2015 | 160 Spear St | Skyline Construction | revision tp pa #2014/0627/9708. interconnecting stair from 17 to 18th floors.Details
revision tp pa #2014/0627/9708. interconnecting stair from 17 to 18th floors. | |
| Dec 15, 2014 | Completed final sign-off Jul 2015 | 160 Spear St | Skyline Construction | revision appl. 2014.0627.9702. reviewed under t-24 code prior to july 1, 2014. revision include it room no longer rated as per ab-060. misc. reconfiguration of rooms, rcp, power and signal and doors. maher n/a.Details
revision appl. 2014.0627.9702. reviewed under t-24 code prior to july 1, 2014. revision include it room no longer rated as per ab-060. misc. reconfiguration of rooms, rcp, power and signal and doors. maher n/a. | |
| Oct 6, 2014 | Completed final sign-off Feb 2015 | 160 Spear St | Skyline Construction | 18th floor suite 1800 -revision to appl #2014.0627.9707 tenant improvement : reduction of scope of work to architectural, mechanical & electrical. n/a maher ordinanceDetails
18th floor suite 1800 -revision to appl #2014.0627.9707 tenant improvement : reduction of scope of work to architectural, mechanical & electrical. n/a maher ordinance | |
| Jun 27, 2014 | Never finaled issued Sep 2014, no final | 160 Spear St | Skyline Construction | 18th floor: interior t.i. to suite 1800. construct new conference rooms, focus rooms, break room. fire, life safety structural and sprinklers are under seperate permit. n/a for the maher ordinance #155-13Details
18th floor: interior t.i. to suite 1800. construct new conference rooms, focus rooms, break room. fire, life safety structural and sprinklers are under seperate permit. n/a for the maher ordinance #155-13 | $986,475 |
| Jun 27, 2014 | Completed final sign-off Jul 2015 | 160 Spear St | Skyline Construction | create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required **Details
create interconnecting stair floors for 17th and 18th floors. ** maher: compliance with ordinance no# 155-13 not required ** | $260,000 |
| Jun 27, 2014 | Completed final sign-off Jul 2015 | 160 Spear St | Skyline Construction | 17th floor: interior t.i. to suite 1700. construct new conference rooms, focus rooms break room. fire, life safety, structural and sprinklers are under seperate permit. n/a for the maher ordinance #155-13Details
17th floor: interior t.i. to suite 1700. construct new conference rooms, focus rooms break room. fire, life safety, structural and sprinklers are under seperate permit. n/a for the maher ordinance #155-13 | $899,640 |
| Dec 6, 2013 | Completed final sign-off Feb 2014 | 160 Spear St | Johnson Controls Fire | 18th floor #1800 - modify existing fire alarm system, adding 3 sync modules, 2 new strobes, 6 new speaker/strobes, & remove & replace 16 strobes. ref pa #2013.0820.4733Details
18th floor #1800 - modify existing fire alarm system, adding 3 sync modules, 2 new strobes, 6 new speaker/strobes, & remove & replace 16 strobes. ref pa #2013.0820.4733 | $12,500 |
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 160 Spear St | Legacy Partners C D S Inc | #1800- interior office improvement, create new offices, conf. room & lounge, total 10,000 sq.ft. 10,000 sq ft for howard spear.Details
#1800- interior office improvement, create new offices, conf. room & lounge, total 10,000 sq.ft. 10,000 sq ft for howard spear. | $200,000 |
| Jun 26, 2013 | Completed final sign-off Sep 2013 | 160 Spear St | Legacy Partners C D S Inc | interior tenant improvement of existing office. new conference room & meeting rooms, remove part of demising wall.Details
interior tenant improvement of existing office. new conference room & meeting rooms, remove part of demising wall. | $120,000 |
| Apr 29, 2013 | Completed final sign-off Aug 2013 | 160 Spear St | Legacy Partners C D S Inc | suite #1600-interior improvements at (e) office area in this suite of removing (e) offices & enlrging (e) office. fire sprinkler under separate permit.Details
suite #1600-interior improvements at (e) office area in this suite of removing (e) offices & enlrging (e) office. fire sprinkler under separate permit. | $20,000 |
| Mar 29, 2013 | Completed final sign-off May 2013 | 160 Spear St | Legacy Partners C D S Inc | suite #1900-interior demo at (e) office area of removing non structural walls for market ready. demo & construct new ceiling. accessibility has not been reviewed and will be review under t.i. separate permit.Details
suite #1900-interior demo at (e) office area of removing non structural walls for market ready. demo & construct new ceiling. accessibility has not been reviewed and will be review under t.i. separate permit. | $45,000 |
| Jun 26, 2012 | Never finaled issued Jun 2012, no final | 160 Spear St | Aquamatic Fire Protection | work in suite 1150: add 1-pendant sprinkler for tenant improvement. relocate 8-penent sprinkler for t.i. plug 3-(e) pendents for t.i. add branchline retraints on branch lines in area of work.Details
work in suite 1150: add 1-pendant sprinkler for tenant improvement. relocate 8-penent sprinkler for t.i. plug 3-(e) pendents for t.i. add branchline retraints on branch lines in area of work. | $6,990 |
| May 17, 2012 | Completed final sign-off Aug 2013 | 160 Spear St | Legacy Partners C D S Inc | #1100:interior improvements in extg office area, removing extg walls and adding new offices/conf room. mep, sprinkler, fire life safety under separate permit.Details
#1100:interior improvements in extg office area, removing extg walls and adding new offices/conf room. mep, sprinkler, fire life safety under separate permit. | $20,000 |
| May 8, 2012 | Completed final sign-off Aug 2012 | 160 Spear St | Legacy Partners C D S Inc | revision to app#201203125894. remove furnature cubes from original permit.Details
revision to app#201203125894. remove furnature cubes from original permit. | |
| Apr 26, 2012 | Expired or cancelled expired Oct 2014 | 160 Spear St | Legacy Partners C D S Inc | interior improvements at (e) office area in the suite 250. remove (e) offices and add new office/conf room. no mechanical.Details
interior improvements at (e) office area in the suite 250. remove (e) offices and add new office/conf room. no mechanical. | $21,000 |
| Mar 27, 2012 | Completed final sign-off Aug 2012 | 160 Spear St | Clinton Heating & A/C Inc | remodeling an existing tenant area space. add return air registers to new offices as need. atler 16 existing reheat to meet new layout. rework 9 existing cooling only vav to meet new layout. relocate t-stat controls. ti will be air balanced and comply to t24 design specification. add (1) 3 tonDetails
remodeling an existing tenant area space. add return air registers to new offices as need. atler 16 existing reheat to meet new layout. rework 9 existing cooling only vav to meet new layout. relocate t-stat controls. ti will be air balanced and comply to t24 design specification. add (1) 3 ton | $20,000 |
| Mar 22, 2012 | Completed final sign-off May 2012 | 160 Spear St | Legacy Partners C D S Inc | #240:interior improvements at extg office area in this suite of removing extg offices and adding new offices and new conf. room in suite #240Details
#240:interior improvements at extg office area in this suite of removing extg offices and adding new offices and new conf. room in suite #240 | $35,000 |
| Mar 12, 2012 | Completed final sign-off Aug 2012 | 160 Spear St | Legacy Partners C D S Inc | interior improvments at existing office area on 14th floor. remove e offices and create new offices and conference roomsDetails
interior improvments at existing office area on 14th floor. remove e offices and create new offices and conference rooms | $250,000 |
| Mar 1, 2012 | Completed final sign-off Jul 2012 | 160 Spear St | Wci-Gc Inc | suite 1750:commercial t.i. in extg office bldg, including new partitions, new kitchenette, new finishes. modifications to extg mechanical, plmg, electrical, fire sprinkler, and fire alarm systems required and to be submitted under separate permits.Details
suite 1750:commercial t.i. in extg office bldg, including new partitions, new kitchenette, new finishes. modifications to extg mechanical, plmg, electrical, fire sprinkler, and fire alarm systems required and to be submitted under separate permits. | $125,000 |
| Feb 1, 2012 | Completed final sign-off Mar 2013 | 160 Spear St | Clinton Heating & A/C Inc | 8th & 9th floor suite 800 & 900 - add (1) 1.5 ton ac unit to server room, add exhaust fan to electrical room, add (2) reheat vav's for (2) new confernece room, rework (e) hvac to meet new layout.Details
8th & 9th floor suite 800 & 900 - add (1) 1.5 ton ac unit to server room, add exhaust fan to electrical room, add (2) reheat vav's for (2) new confernece room, rework (e) hvac to meet new layout. | $50,000 |
| Jan 12, 2012 | Completed final sign-off Feb 2013 | 160 Spear St | Legacy Partners C D S Inc | structural drawings for remodel of e office suite. remove walls, add new walls and new steel beamsDetails
structural drawings for remodel of e office suite. remove walls, add new walls and new steel beams | $18,000 |
| Dec 14, 2011 | Completed final sign-off Aug 2012 | 160 Spear St | Legacy Partners C D S Inc | 9/f - emodel (e) office suite. remove (e) walls and build new wallsDetails
9/f - emodel (e) office suite. remove (e) walls and build new walls | $800,000 |
| Dec 1, 2011 | Completed final sign-off Mar 2013 | 160 Spear St | Legacy Partners C D S Inc | unit #800: remodel e office suite, remove e walls and build new wallsDetails
unit #800: remodel e office suite, remove e walls and build new walls | $848,000 |
| Jan 6, 2011 | Completed final sign-off Mar 2011 | 160 Spear St | Rossi Builders Inc. | 11th floor-construct new walls, install new base cabinet & sinkDetails
11th floor-construct new walls, install new base cabinet & sink | $25,000 |
| Dec 2, 2009 | Expired or cancelled cancelled Jan 2026 | 160 Spear St | tenant improvement, minor demolition, installation of new partitions & doorDetails
tenant improvement, minor demolition, installation of new partitions & door | $8,000 | |
| Dec 2, 2009 | Completed final sign-off May 2010 | 160 Spear St | Rossi Builders Inc. | minor demolition. install new walls and doorsDetails
minor demolition. install new walls and doors | $20,000 |
| Dec 2, 2009 | Completed final sign-off May 2010 | 160 Spear St | Rossi Builders Inc. | tenant improvement. minor revision, installation of partitions and doorDetails
tenant improvement. minor revision, installation of partitions and door | $8,000 |
| Feb 19, 2009 | Completed final sign-off May 2010 | 160 Spear St | Rossi Builders Inc. | minor demolition, installation of under grid partitions, new doors and sidelight. electrical,mechanical & plumbing under separate permit.Details
minor demolition, installation of under grid partitions, new doors and sidelight. electrical,mechanical & plumbing under separate permit. | $75,000 |
| Dec 16, 2008 | Completed final sign-off Feb 2009 | 160 Spear St | Sure Fire Protection | add 2 new pendent fire sprinklers. relocate 19 existing pendent sprinklers, plug 3 existing. upgrade seismic in work area.Details
add 2 new pendent fire sprinklers. relocate 19 existing pendent sprinklers, plug 3 existing. upgrade seismic in work area. | $7,494 |
| Dec 11, 2008 | Completed final sign-off Feb 2009 | 160 Spear St | Clinton Heating & A/C Inc | #1020 - rework (e) hvac to meet new layout. add 1 2 ton. ductless split system for server. ref.200812027562.Details
#1020 - rework (e) hvac to meet new layout. add 1 2 ton. ductless split system for server. ref.200812027562. | $30,000 |
| Dec 4, 2008 | Completed final sign-off Apr 2009 | 160 Spear St | Clinton Heating & A/C Inc | re-work (e) hvac to meet new layout. addd two 5 ton water source heat pump to server/idf room. reference t.i. pa# 2008-1202-7559Details
re-work (e) hvac to meet new layout. addd two 5 ton water source heat pump to server/idf room. reference t.i. pa# 2008-1202-7559 | $30,000 |
| Dec 2, 2008 | Completed final sign-off Apr 2009 | 160 Spear St | installation of new under grid partitions, base cabinet and sink. install 1 hour partition. mep, ls and sp under seperate permitDetails
installation of new under grid partitions, base cabinet and sink. install 1 hour partition. mep, ls and sp under seperate permit | $95,000 | |
| Dec 2, 2008 | Completed final sign-off Feb 2009 | 160 Spear St | installation of new under grid partitions, base cabinet & sink. mep,sp and ls under separate permits. amend permit 200803116787Details
installation of new under grid partitions, base cabinet & sink. mep,sp and ls under separate permits. amend permit 200803116787 | ||
| Nov 24, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | Rossi Builders Inc. | tenant improvement for existing office space 240- mep, ls and sp separte permitsDetails
tenant improvement for existing office space 240- mep, ls and sp separte permits | $45,000 |
| Nov 18, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | Pankow Special Projects Lp | to obtain final inspection for work approved under 200803318331. al work has been completed.Details
to obtain final inspection for work approved under 200803318331. al work has been completed. | |
| May 8, 2008 | Completed final sign-off Jul 2008 | 160 Spear St | Pankow Special Projects Lp | 12th floor - resubmit/revise permit. plan change-meeting room location change, add new millwork & straigten out wall. originial 200804119517.Details
12th floor - resubmit/revise permit. plan change-meeting room location change, add new millwork & straigten out wall. originial 200804119517. | $5,000 |
| May 8, 2008 | Completed final sign-off May 2008 | 160 Spear St | Legacy Partners C D S Inc | 10th floor - resubmit for corridor permit - installation lights. walls approved under pa# 2008-0311-6787 & 2008-0311-6789.Details
10th floor - resubmit for corridor permit - installation lights. walls approved under pa# 2008-0311-6787 & 2008-0311-6789. | |
| Apr 30, 2008 | Completed final sign-off Jul 2008 | 160 Spear St | Legacy Partners C D S Inc | install under grid partitions, new sidelights, base cabinets & sink. mep & life safety to be submitted under seperate permitDetails
install under grid partitions, new sidelights, base cabinets & sink. mep & life safety to be submitted under seperate permit | $85,000 |
| Apr 11, 2008 | Completed final sign-off Jul 2008 | 160 Spear St | Legacy Partners C D S Inc | install new walls, base cabinets & sidelights. mep under separate permit. fire/life safety under seperate permit.Details
install new walls, base cabinets & sidelights. mep under separate permit. fire/life safety under seperate permit. | $85,000 |
| Mar 31, 2008 | Expired or cancelled expired Jan 2009 | 160 Spear St | Legacy Partners C D S Inc | revision to pa# 2008/03/17/7242 to increase scope of work to include installation of new walls and non-rated doors on the 12th floor. mep, life safety under separate permit.Details
revision to pa# 2008/03/17/7242 to increase scope of work to include installation of new walls and non-rated doors on the 12th floor. mep, life safety under separate permit. | $5,000 |
| Mar 31, 2008 | Completed final sign-off May 2008 | 160 Spear St | Legacy Partners C D S Inc | revision to pa# 2008/03/04/6175 to install 1 hr fire rated wall around server room and new 60 min door on the 15th floor.Details
revision to pa# 2008/03/04/6175 to install 1 hr fire rated wall around server room and new 60 min door on the 15th floor. | $1,000 |
| Mar 27, 2008 | Completed final sign-off May 2008 | 160 Spear St | Clinton Heating & A/C Inc | remodeling an (e) tenant space. 1 new a/c unit for server room. altering new duct workDetails
remodeling an (e) tenant space. 1 new a/c unit for server room. altering new duct work | $30,000 |
| Mar 17, 2008 | Completed final sign-off Jan 2009 | 160 Spear St | ti for 12th and 13th floor to install under grid partition walls, base carbinets and sink in break room, new doors, sidelights and prefabricated shower. mep and life safety work will be under separate permitDetails
ti for 12th and 13th floor to install under grid partition walls, base carbinets and sink in break room, new doors, sidelights and prefabricated shower. mep and life safety work will be under separate permit | $175,000 | |
| Mar 11, 2008 | Completed final sign-off May 2008 | 160 Spear St | 10th floor-installation of under grid walls, new base cabinets and sinks. installation of sidelight. life safety and mep under seperate permits.Details
10th floor-installation of under grid walls, new base cabinets and sinks. installation of sidelight. life safety and mep under seperate permits. | $110,000 | |
| Mar 11, 2008 | Never finaled issued Mar 2008, no final | 160 Spear St | 11th floor-revision to revise pa# 200801233102-door location changeDetails
11th floor-revision to revise pa# 200801233102-door location change | ||
| Mar 11, 2008 | Completed final sign-off Feb 2009 | 160 Spear St | 10th floor- in suite 1020, suite 1030 and sutie 1040: installation of under grid walls, base cabinets and sinks. installation of sidelights. life safety, mep under seperate permits.Details
10th floor- in suite 1020, suite 1030 and sutie 1040: installation of under grid walls, base cabinets and sinks. installation of sidelights. life safety, mep under seperate permits. | $100,000 | |
| Mar 11, 2008 | Completed final sign-off May 2008 | 160 Spear St | 11th floor: revision to appl #200801092174 - door swing change.Details
11th floor: revision to appl #200801092174 - door swing change. | $45,000 | |
| Mar 4, 2008 | Completed final sign-off May 2008 | 160 Spear St | Legacy Partners C D S Inc | 15th floor: tenant improvement - building news walls, minor demolition , installing new base cabinet, sink, new sidelights, 1-hr partition, new doors. mep and fire life safety under separate permit.Details
15th floor: tenant improvement - building news walls, minor demolition , installing new base cabinet, sink, new sidelights, 1-hr partition, new doors. mep and fire life safety under separate permit. | $85,000 |
| Mar 4, 2008 | Completed final sign-off Apr 2008 | 160 Spear St | Sure Fire Protection | 4th floor-add 3 and relocate 8 fire sprinklers for new wall layoutDetails
4th floor-add 3 and relocate 8 fire sprinklers for new wall layout | $2,800 |
| Mar 4, 2008 | Never finaled issued Mar 2008, no final | 160 Spear St | Sure Fire Protection | 11th floor-add 8 new fire sprinklers for new wall layout. relocate 2 (e) fire sprinklers for new wall layout.Details
11th floor-add 8 new fire sprinklers for new wall layout. relocate 2 (e) fire sprinklers for new wall layout. | $2,800 |
| Feb 5, 2008 | Completed final sign-off Apr 2008 | 160 Spear St | Starlite Electric Inc. | install 6 strobes, 1 smoke detector, 4 speakersDetails
install 6 strobes, 1 smoke detector, 4 speakers | $4,000 |
| Jan 23, 2008 | Completed final sign-off May 2008 | 160 Spear St | Legacy Partners C D S Inc | ti on the 11th floor. minor demo of 1hr walls and installation of under grid wall, new doors, sidelights and patch 1hr walls. electrical, mechanical and plumbing under seperate permitDetails
ti on the 11th floor. minor demo of 1hr walls and installation of under grid wall, new doors, sidelights and patch 1hr walls. electrical, mechanical and plumbing under seperate permit | $98,000 |
| Jan 9, 2008 | Completed final sign-off May 2008 | 160 Spear St | Legacy Partners C D S Inc | office tenant improvement on 11th floor. installation of under grid partitions, new doors, and side lights. patch one hour wall. minor demo of 1 hr wall. install new "s' doors in elevator lobby. sprinklers, life safety, electrical and mech. under separate permitDetails
office tenant improvement on 11th floor. installation of under grid partitions, new doors, and side lights. patch one hour wall. minor demo of 1 hr wall. install new "s' doors in elevator lobby. sprinklers, life safety, electrical and mech. under separate permit | $30,000 |
| Jan 3, 2008 | Completed final sign-off Feb 2008 | 160 Spear St | Legacy Partners C D S Inc | office tenant improvement on 11th floor. removal of under grid partitions. installation of under grid partitions, sidelights, glazing, base cabinet and sink of break room. mep under separate permit. fire alarm & sprinkler permit to be seperate.Details
office tenant improvement on 11th floor. removal of under grid partitions. installation of under grid partitions, sidelights, glazing, base cabinet and sink of break room. mep under separate permit. fire alarm & sprinkler permit to be seperate. | $85,000 |
| Dec 27, 2007 | Completed final sign-off Apr 2008 | 160 Spear St | Legacy Partners C D S Inc | removal of one hour partition. removal & installation of under grid partitions. installation of new doors, sidelights and glazing, and one hour partition. mep under separate permit. replace 2 drinking fountains in corridors with accessible fixtures.Details
removal of one hour partition. removal & installation of under grid partitions. installation of new doors, sidelights and glazing, and one hour partition. mep under separate permit. replace 2 drinking fountains in corridors with accessible fixtures. | $90,000 |
| Dec 27, 2007 | Never finaled issued Dec 2007, no final | 160 Spear St | Legacy Partners C D S Inc | removal of one hour rated partitions. installation of one hour rated and under grid partitions. installation of new doors, sidelights, glazing and base cabinets. mep under separate permit. work on 10th floor.Details
removal of one hour rated partitions. installation of one hour rated and under grid partitions. installation of new doors, sidelights, glazing and base cabinets. mep under separate permit. work on 10th floor. | $190,000 |
| Dec 18, 2007 | Completed final sign-off Jan 2008 | 160 Spear St | Ayoob & Peery Plumbing Co Inc | 16th floor tenant improvements, relocate 6 fire sprinkler heads.Details
16th floor tenant improvements, relocate 6 fire sprinkler heads. | $1,400 |
| Nov 29, 2007 | Completed final sign-off Jan 2008 | 160 Spear St | Bcci Construction Company | partial demo of (e) office. partition of 2 new offices from open area and new millwork, paint and finishes throughout. fire sprinklers and life safety and mep under separate permit.Details
partial demo of (e) office. partition of 2 new offices from open area and new millwork, paint and finishes throughout. fire sprinklers and life safety and mep under separate permit. | $35,000 |
| Nov 7, 2007 | Expired or cancelled expired Oct 2013 | 160 Spear St | 16th floor: tenant improvment to relocate door, patch with one hour wall.Details
16th floor: tenant improvment to relocate door, patch with one hour wall. | $17,000 | |
| Nov 7, 2007 | Never finaled issued Nov 2007, no final | 160 Spear St | Sure Fire Protection | suite #300- relocate 3 existing sprinkler heads and plug one existing head in suite 300 due to the office renovation approved permit aplication #200708230630.Details
suite #300- relocate 3 existing sprinkler heads and plug one existing head in suite 300 due to the office renovation approved permit aplication #200708230630. | $2,800 |
| Sep 24, 2007 | Completed final sign-off Jun 2008 | 160 Spear St | Legacy Partners C D S Inc | 17th floor, suite 1700 - minor demolition, removing under grid ceiling partitions. (4) existing offices to remain. no tenant for suite. suite 1700 is a speculative space, we will try to market. install new corridor walls with rated fire doors.Details
17th floor, suite 1700 - minor demolition, removing under grid ceiling partitions. (4) existing offices to remain. no tenant for suite. suite 1700 is a speculative space, we will try to market. install new corridor walls with rated fire doors. | $80,000 |
| Aug 23, 2007 | Completed final sign-off Jun 2008 | 160 Spear St | Legacy Partners C D S Inc | tenant improvement on suite 330 to build 2 interior walls for office use.Details
tenant improvement on suite 330 to build 2 interior walls for office use. | $52,000 |
| Aug 8, 2007 | Completed final sign-off Oct 2007 | 160 Spear St | Legacy Partners C D S Inc | suite #330-tenant improvement-minor demolition, building 4 new walls, build new breakroom and storage room. mechanical permit seperate and life safety.Details
suite #330-tenant improvement-minor demolition, building 4 new walls, build new breakroom and storage room. mechanical permit seperate and life safety. | $65,000 |
| Aug 1, 2006 | Completed final sign-off Sep 2006 | 160 Spear St | Starlite Electric Inc. | install 3 strobes, relocate 1 strobe, install 1 speaker. revision to appl#200607116134Details
install 3 strobes, relocate 1 strobe, install 1 speaker. revision to appl#200607116134 | |
| Jul 6, 2006 | Completed final sign-off Sep 2006 | 160 Spear St | Dpw Inc. | modfy existingsprinklersystem, relocate1firesprinkler headDetails
modfy existingsprinklersystem, relocate1firesprinkler head | $2,000 |
| Jun 16, 2006 | Completed final sign-off Sep 2006 | 160 Spear St | oti-1 18th floor, el. t.i. minor demolition,build new ceiling height partitions, new carpet and paint.Details
oti-1 18th floor, el. t.i. minor demolition,build new ceiling height partitions, new carpet and paint. | $22,000 | |
| May 26, 2006 | Completed final sign-off Aug 2006 | 160 Spear St | oti-1 7th floor demowalls. 1, wall is a portion of the corridor,doors, buiild back corridor wall & office walls, & doors.Details
oti-1 7th floor demowalls. 1, wall is a portion of the corridor,doors, buiild back corridor wall & office walls, & doors. | $45,000 | |
| Dec 16, 2005 | Completed final sign-off Apr 2006 | 160 Spear St | Richlen Construction | removal of partitions and doors for ste 1775Details
removal of partitions and doors for ste 1775 | $15,000 |
| Dec 14, 2005 | Completed final sign-off Mar 2006 | 160 Spear St | Bcci Construction Company | electrical & lighting work on floor one.Details
electrical & lighting work on floor one. | $9,000 |
| Dec 14, 2005 | Completed final sign-off Apr 2006 | 160 Spear St | Bcci Construction Company | electrical & lighting work on floor two.Details
electrical & lighting work on floor two. | $8,000 |
| Dec 14, 2005 | Completed final sign-off Apr 2006 | 160 Spear St | Bcci Construction Company | lighting work on floor 18.Details
lighting work on floor 18. | $8,000 |
| Jul 21, 2005 | Completed final sign-off Nov 2005 | 160 Spear St | 18th floor only:istall 13 ceiling maint speaker, 14 wall mount strobes, 2 smoke detectors,Details
18th floor only:istall 13 ceiling maint speaker, 14 wall mount strobes, 2 smoke detectors, | $31,360 | |
| Jun 22, 2005 | Completed final sign-off Nov 2005 | 160 Spear St | Dpr Construction Inc | oti-1 18/f el,me,ls,spDetails
oti-1 18/f el,me,ls,sp | $498,106 |
| Oct 27, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | provide fire sprinklers on the 5th floorDetails
provide fire sprinklers on the 5th floor | $15,000 | |
| Oct 27, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | modify fire sprinklers on the 7th floor for tenant improvementsDetails
modify fire sprinklers on the 7th floor for tenant improvements | $15,000 | |
| Oct 27, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | provide fire sprinklers on the 6th floorDetails
provide fire sprinklers on the 6th floor | $15,000 | |
| Sep 30, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | Skyline Construction | oti-2 6th fl, el, meDetails
oti-2 6th fl, el, me | $100,000 |
| Sep 25, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | Skyline Construction | oti-2 7th fl. el, meDetails
oti-2 7th fl. el, me | $100,000 |
| Sep 25, 2003 | Expired or cancelled withdrawn Sep 2003 | 160 Spear St | Skyline Construction | oti-2 5th fl. el, meDetails
oti-2 5th fl. el, me | $100,000 |
| Sep 19, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | Skyline Construction | oti-1 7th fl,-el, me, ls, spDetails
oti-1 7th fl,-el, me, ls, sp | $250,000 |
| Sep 17, 2003 | Expired or cancelled withdrawn Sep 2003 | 160 Spear St | Skyline Construction | oti-1 5th floor wl me ls spDetails
oti-1 5th floor wl me ls sp | $250,000 |
| Sep 17, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | Skyline Construction | oti-1 6th floor el me ls spDetails
oti-1 6th floor el me ls sp | $250,000 |
| Sep 12, 2003 | Completed final sign-off Dec 2003 | 160 Spear St | Skyline Construction | mechanical and electrical work on 17th flr only; no increase in office spaceDetails
mechanical and electrical work on 17th flr only; no increase in office space | $65,000 |
| Sep 9, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | remodel-renoval and addition of interior partitions, new fl and light fixtures, new finishes throughDetails
remodel-renoval and addition of interior partitions, new fl and light fixtures, new finishes through | $70,000 | |
| Aug 19, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | Skyline Construction | non-structural demo, ceiling, walls, lights, no changes to sprinkler or life safetyDetails
non-structural demo, ceiling, walls, lights, no changes to sprinkler or life safety | $30,000 |
| Aug 19, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | Skyline Construction | non-structural demolition of existing tenant improvements, ceiling, walls, carpet, lights, no changeDetails
non-structural demolition of existing tenant improvements, ceiling, walls, carpet, lights, no change | $30,000 |
| Aug 19, 2003 | Completed final sign-off Mar 2004 | 160 Spear St | Skyline Construction | floor 5, tenant improvement to follow- non-structural demolition of existing tenant improvements. ceDetails
floor 5, tenant improvement to follow- non-structural demolition of existing tenant improvements. ce | $30,000 |
| Jul 24, 2003 | Completed final sign-off Dec 2003 | 160 Spear St | Skyline Construction | demolition & reconfiguration of office space on the 17th fl. no increase in spaceDetails
demolition & reconfiguration of office space on the 17th fl. no increase in space | $50,000 |
| Dec 11, 2001 | Completed final sign-off Mar 2004 | 160 Spear St | Crk Construction | oti-1 2nd floorDetails
oti-1 2nd floor | $2,000 |
| Sep 20, 2001 | Expired or cancelled expired Jan 2002 | 160 Spear St | Cic Associates, Inc | final inspection of app#9923116 5th flr.Details
final inspection of app#9923116 5th flr. | |
| Sep 20, 2001 | Expired or cancelled expired Jan 2002 | 160 Spear St | Cic Associates, Inc | for final inspection of #895808 (app#9923755) 5th flr me, el spDetails
for final inspection of #895808 (app#9923755) 5th flr me, el sp | |
| Sep 20, 2001 | Expired or cancelled expired Sep 2003 | 160 Spear St | Cic Associates, Inc | 5th floor - oti-3, ls onlyDetails
5th floor - oti-3, ls only | $3,000 |
| Apr 23, 2001 | Expired or cancelled cancelled Nov 2001 | 160 Spear St | Crk Construction | oti-1 19th flr, ltg.mech, ls,sprDetails
oti-1 19th flr, ltg.mech, ls,spr | $15,115 |
| Mar 7, 2001 | Completed final sign-off Mar 2001 | 160 Spear St | Turner Construction**See 210639**** | Details
| $7,000 |
| Sep 19, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-4 10th floor l/sDetails
oti-4 10th floor l/s | $15,000 | |
| Sep 11, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-4 13th floor - lsDetails
oti-4 13th floor - ls | $20,000 | |
| Aug 23, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti - 3 sp 10th floorDetails
oti - 3 sp 10th floor | $40,000 | |
| Jul 19, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-2, 13th floor, me, elDetails
oti-2, 13th floor, me, el | $200,000 | |
| Jul 19, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-2, 10th floor, el, meDetails
oti-2, 10th floor, el, me | $300,000 | |
| Jul 17, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | oti-1 10th floor el, me, l/s, spDetails
oti-1 10th floor el, me, l/s, sp | $500,000 | |
| Jun 23, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | demo of partitions/flooring /millwork/hvac/elec.Details
demo of partitions/flooring /millwork/hvac/elec. | $25,000 | |
| Jun 16, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | Details
| $15,000 | |
| May 25, 2000 | Completed final sign-off Dec 2000 | 160 Spear St | replace existing corridor ceiling with new ceiling grid and tile relocate ceilingDetails
replace existing corridor ceiling with new ceiling grid and tile relocate ceiling | $14,000 | |
| Apr 26, 2000 | Completed final sign-off Dec 2000 | 160 Spear St | change to exit doors at 1st compartmentDetails
change to exit doors at 1st compartment | ||
| Apr 25, 2000 | Completed final sign-off Oct 2000 | 160 Spear St | oti-2, el, me, sp, 12th floorDetails
oti-2, el, me, sp, 12th floor | $104,000 | |
| Apr 25, 2000 | Completed final sign-off Oct 2000 | 160 Spear St | oti-2, el, me, ls, sp, 11th floorDetails
oti-2, el, me, ls, sp, 11th floor | $114,000 | |
| Apr 25, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | Mc Millan Electric | furnish & install additional devices to extg life safety systemDetails
furnish & install additional devices to extg life safety system | $1,520 |
| Apr 25, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | Mc Millan Electric | furnish & install additonal devices to extg life safty systemDetails
furnish & install additonal devices to extg life safty system | $1,500 |
| Apr 4, 2000 | Completed final sign-off Dec 2000 | 160 Spear St | Mc Millan Electric | furnish & install additional life safety to existing systemDetails
furnish & install additional life safety to existing system | $3,600 |
| Mar 21, 2000 | Completed final sign-off Oct 2000 | 160 Spear St | oti-1, 11th floor- el, me, l/s, spDetails
oti-1, 11th floor- el, me, l/s, sp | $125,000 | |
| Mar 20, 2000 | Completed final sign-off Dec 2000 | 160 Spear St | oti-2 18th floor electrical mechanical sprinklerDetails
oti-2 18th floor electrical mechanical sprinkler | $80,000 | |
| Feb 11, 2000 | Completed final sign-off May 2000 | 160 Spear St | Richlen Construction | oti-3, ls, 3rd floorDetails
oti-3, ls, 3rd floor | $7,400 |
| Jan 26, 2000 | Completed final sign-off Dec 2000 | 160 Spear St | remodel of office space. remodel 40% of space; demolish 10% of walls new carpet & paintDetails
remodel of office space. remodel 40% of space; demolish 10% of walls new carpet & paint | $100,000 | |
| Jan 20, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | Cic Associates, Inc | oti-3, 6th floor, el & spDetails
oti-3, 6th floor, el & sp | $52,000 |
| Jan 19, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | Mc Millan Electric | add to (e) life safetyDetails
add to (e) life safety | $2,000 |
| Jan 11, 2000 | Expired or cancelled expired Sep 2003 | 160 Spear St | install new fm200 fire protection system on 6th flrDetails
install new fm200 fire protection system on 6th flr | $27,000 |