Garry Westover
- Listed as
- contractor, designer
- Firm
- Air Systems Of Sacramento
- Based in
- Sacramento
- On San Francisco permits
- Jun 2003 to Nov 2025
4 permits since 2000 (contractor on 4 permits, designer on 1 permit): 2 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 12, 2025 | In progress filed Nov 2025, not yet issued | 160 Spear St | Air Systems Of Sacramento | 14/f: provide (n) cu and fc to serve av production room. cu and fc to be connected onto existing fire alarm system (by others). mount cu in ceiling. condensate to be piped to nearest termination point.Details
14/f: provide (n) cu and fc to serve av production room. cu and fc to be connected onto existing fire alarm system (by others). mount cu in ceiling. condensate to be piped to nearest termination point. | $9,500 |
| Aug 28, 2003 | Completed final sign-off Jul 2004 | 3333 25th St | Air Systems Of Sacramento | install new cooling coil and duct work to air drier room in basementDetails
install new cooling coil and duct work to air drier room in basement | $17,000 |
| Jun 11, 2003 | Completed final sign-off Jul 2004 | 3333 25th St | Air Systems Of Sacramento | demolish (e) 40 ton chiller, install (n) 120 ton chiller,Details
demolish (e) 40 ton chiller, install (n) 120 ton chiller, | $125,000 |
| Jun 11, 2003 | Expired or cancelled expired Oct 2005 | 611 Folsom St | Air Systems Of Sacramento | install (n) 125 hp supply backup plan, replace (e) supply w/ a new one, revise (e)125 hp motorDetails
install (n) 125 hp supply backup plan, replace (e) supply w/ a new one, revise (e)125 hp motor | $75,000 |