George Soskin
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Huntsman
- Based in
- San Francisco
- On San Francisco permits
- Sep 2013 to Mar 2023
656 permits since 2000 (architect on 631 permits, engineer on 12 permits, designer on 9 permits, authorized agent-others on 3 permits, attorney on 1 permit): 540 completed, 84 never finaled, 32 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 656.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 2, 2023 | Completed final sign-off Jul 2023 | 1 Embarcadero Center | Peacock Construction | 15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred.Details
15/f: upgrade restrooms to full compliance & new finishes in elevator lobby & common area corridors.no change in occupancy area or use. mep,life safety & sprinklers deferred. | $185,000 |
| Dec 28, 2022 | Completed final sign-off Mar 2025 | 1 California St | Bcci Construction Company, Swinerton Builders | 19th floor office t.i. to include new partitions, ceilings, finishes & mep.Details
19th floor office t.i. to include new partitions, ceilings, finishes & mep. | $345,000 |
| Dec 22, 2022 | Completed final sign-off May 2024 | 1 Embarcadero Center | Hathaway Dinwiddie Co. | interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017.Details
interior demo and abatement of existing unoccupied 25th & 26th floors including non-structural partitions, ceilings, lighting, plumbing and finishes. replace any removed fire-proofing with new to maintain existing fire ratings. no change in occupancy, use or area. ab-017. | $215,000 |
| Dec 20, 2022 | Completed final sign-off Feb 2025 | 555 California St | Novo Construction Inc | 46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and powerDetails
46/f - ste 4646: revision to pa 2022-0706-7839 to create new ti closet, 2 private offices, lighting finishes and power | |
| Dec 15, 2022 | Completed final sign-off Feb 2023 | 1 Embarcadero Center | Hp Build | 16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits.Details
16/f: approx 200 sq. ft. area, revision to (e) suite entry, demo of (e) wall partiiton, storefront, ceiling lights, new partition work, ceiling tilework, doors. no deferred work only trade permits. | $80,000 |
| Dec 15, 2022 | Completed final sign-off Jul 2023 | 1 Embarcadero Center | Gci, Inc | non structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred.Details
non structural demo. upgrade toilet rooms to full t24 compliance. new finishes in elev lobbyand common corridor. no change in occupancy, use or area. mep, ls, sprinlkers deferred. | $157,000 |
| Dec 15, 2022 | Completed final sign-off Aug 2023 | 1 Embarcadero Center | Peacock Construction | 20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered.Details
20th floor: non-structural demo upgrade toilet rooms to full t-24 compliance. new finishes in elevator lobby and common corridor. no change in occupancy, use, or area. mep, life safty, & sprinkler defered. | $157,000 |
| Dec 13, 2022 | Completed final sign-off Sep 2024 | 50 California St | Richlen Construction | non structural demo, new non structural partitoins, paint, new compliant toilet rooms, no change in occupancy use or area. life safety deferred.Details
non structural demo, new non structural partitoins, paint, new compliant toilet rooms, no change in occupancy use or area. life safety deferred. | $16,000 |
| Nov 14, 2022 | Completed final sign-off Jul 2023 | 555 California St | Bcci Construction Company | 21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes.Details
21/f: interior improvements, non structural partitions, ceiling grid, lighting and finishes. | $287,600 |
| Oct 4, 2022 | Completed final sign-off Feb 2025 | 535 Mission St | M C S Construction Services | new non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area.Details
new non structural partitions, glass, doors, millwork and finishes. mep, l/s sprinklers deferred. no change in occupancy, use or area. | $110,000 |
| Sep 22, 2022 | Completed final sign-off Mar 2023 | 2 Embarcadero Center | Source Planning And Construction Inc | 16th fl - revision to pa 2021-0211-4453 reduce scope delete mep scopeDetails
16th fl - revision to pa 2021-0211-4453 reduce scope delete mep scope | |
| Sep 22, 2022 | Completed final sign-off Mar 2023 | 3 Embarcadero Center | Source Planning And Construction Inc | revision to 202202168054. replace scope. delete mepDetails
revision to 202202168054. replace scope. delete mep | |
| Sep 8, 2022 | Completed final sign-off Oct 2022 | 4 Embarcadero Center | M C S Construction Services | suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225.Details
suite 3410: deferred mechanical and electrical title 24 compliance. ref t.i. pa 202207128225. | $25,000 |
| Aug 23, 2022 | Expired or cancelled cancelled Jan 2026 | 101 02nd St | 2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.Details
2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit. | $211,514 | |
| Aug 2, 2022 | Completed final sign-off Dec 2022 | 1 Embarcadero Center | M C S Construction Services | 15/f: non-struc demo and isntall new non-structural partitions, glazing, dfh, millwork, finishes. no changes in occupany, use or area, mep, sprinklers & fire safety deferred. maher n/a.Details
15/f: non-struc demo and isntall new non-structural partitions, glazing, dfh, millwork, finishes. no changes in occupany, use or area, mep, sprinklers & fire safety deferred. maher n/a. | $149,610 |
| Jul 6, 2022 | Completed final sign-off Feb 2025 | 555 California St | Novo Construction Inc | 46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical.Details
46/f ste 4646: ti consist of new non structural partitions, glazing, doors, lighting, finishes, and power. mechanical and electrical. | $1,010,000 |
| Jul 6, 2022 | Completed final sign-off Mar 2023 | 301 Howard St | Bcci Construction Company | 2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbiesDetails
2nd floor. rev to pa 2022-0506-3752 remove two way comm and mushroom button at elevator lobby - remove card readers from elevator lobbies | $11,500 |
| Jun 22, 2022 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | 43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred.Details
43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred. | $125,000 |
| Jun 15, 2022 | Completed final sign-off Jul 2023 | 3 Embarcadero Center | Peacock Construction | 2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's.Details
2nd floor:partial floor t.i. new non-load bearing partitions, ceilings and floors. new showerroom and new mep incl fsd's. | $856,324 |
| Jun 15, 2022 | Completed final sign-off Jun 2023 | 3 Embarcadero Center | Peacock Construction | 3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep.Details
3rd fl: partial fl t.i., new non-load bearing partitions, ceilings & floor finishes. infill deck. 4th fl: modify (e) shower room into all gender restroom. new mep. | $1,025,089 |
| Jun 2, 2022 | Completed final sign-off Feb 2024 | 50 California St | Richlen Construction | demo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads.Details
demo of non struc partitions, millwk, power/data, plumbing, ceiling systems incl abatement of haz materials. removal of (e) interconnect stair and slab infill. build back of accessible restrooms and mep to warm sheel condition space will remain unoccupied. add 11 fsds & 127 upright sprinkler heads. | $160,000 |
| May 12, 2022 | Never finaled issued May 2022, no final | 1 Maritime Pz | Gci, Inc | 6th fl: fire only to obtain assembly permit stamps.Details
6th fl: fire only to obtain assembly permit stamps. | |
| May 12, 2022 | Never finaled issued May 2022, no final | 1 Maritime Pz | Gci, Inc | 7th fl: fire only to obtain assembly permit stamps.Details
7th fl: fire only to obtain assembly permit stamps. | |
| Apr 26, 2022 | Completed final sign-off Sep 2023 | 50 California St | Richlen Construction | 6/f: demo of (e) non-structural partioins, millwork , power/data, plumbing and celing systems including rmeoval of hazadous matz on unoccupied full floor. build back of multi-occupant restrooms and mep systems to warm shell condition.future ti sep permit. ab-017. maher n/a.Details
6/f: demo of (e) non-structural partioins, millwork , power/data, plumbing and celing systems including rmeoval of hazadous matz on unoccupied full floor. build back of multi-occupant restrooms and mep systems to warm shell condition.future ti sep permit. ab-017. maher n/a. | $160,000 |
| Mar 2, 2022 | Completed final sign-off Jun 2022 | 555 California St | Bcci Construction Company | 28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810.Details
28th fl: t.i. new non-structural partitions, ceilings & mep. arch & mep for pa# 202201276810. | $500,000 |
| Jun 16, 2021 | Completed final sign-off Nov 2021 | 3 Embarcadero Center | 5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountainDetails
5th fl - demo of select non structural walls. build back of ceiling height walls. new door & card readers. relocation of exit sign. install of new hi/lo drinking fountain | $10,000 | |
| Jun 14, 2021 | Completed final sign-off Feb 2022 | 275 Battery St | Hathaway Dinwiddie Co. | ref pa 202012020023 & 202103166609. electrical upgrades, lighting, life safety, mechanical upgrades ( to 10th flr public spaces, ste 1000 & 1050. fire alarm and sprinkler under separate permits.Details
ref pa 202012020023 & 202103166609. electrical upgrades, lighting, life safety, mechanical upgrades ( to 10th flr public spaces, ste 1000 & 1050. fire alarm and sprinkler under separate permits. | $535,000 |
| Apr 21, 2021 | Completed final sign-off Nov 2021 | 1 Embarcadero Center | M C S Construction Services | new non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada complianceDetails
new non-structural partitions, new door and hardware, new lighting and ceilings, new wall and floor finishes, new millwork and furniture, new upgraded restrooms for ada compliance | $285,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 405 Howard St | Sc Builders, Inc | 3rd fl: revision to pa# 202009265173. reduction of scope. remove 4 private offices, modify some door hardware to panic hardware. delete/relocated some outlets.Details
3rd fl: revision to pa# 202009265173. reduction of scope. remove 4 private offices, modify some door hardware to panic hardware. delete/relocated some outlets. | |
| Apr 7, 2021 | Completed final sign-off Oct 2021 | 555 California St | Bcci Construction Company | 1st fl, concourse level: non structural demolition. new non structural partitions, doors, glazing, lighting and finishes. no change in occupancy, use, or area. life safety and sprinklers under separate permit.Details
1st fl, concourse level: non structural demolition. new non structural partitions, doors, glazing, lighting and finishes. no change in occupancy, use, or area. life safety and sprinklers under separate permit. | $43,050 |
| Apr 1, 2021 | Completed final sign-off Oct 2021 | 1 Maritime Pz | Gci, Inc | 13/f: revision to pa 201901099946. accessible restroom to be provided by tenant architect approved under pa 201911187518.Details
13/f: revision to pa 201901099946. accessible restroom to be provided by tenant architect approved under pa 201911187518. | |
| Feb 11, 2021 | Completed final sign-off Mar 2023 | 2 Embarcadero Center | Source Planning And Construction Inc | 16th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing, fixtures & accessories. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit.Details
16th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing, fixtures & accessories. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit. | $157,000 |
| Feb 11, 2021 | Completed final sign-off Mar 2023 | 1 Embarcadero Center | Source Planning And Construction Inc | 7th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit.Details
7th fl: non-structural demo. (n) non-structutal partitions, finishes, plumbing. no change in area, occupancy or use. mep, l/s, fire sprinklers under separate permit. | $157,000 |
| Feb 8, 2021 | Expired or cancelled withdrawn Jul 2024 | 291 Geary St | 2/f: renovation of 2/f office space. minor demo of non-load partitions and finishes. new non-load partitions millwork and finishes. new led lights and new power outlets. no structural work. sprinkler under separate permit.Details
2/f: renovation of 2/f office space. minor demo of non-load partitions and finishes. new non-load partitions millwork and finishes. new led lights and new power outlets. no structural work. sprinkler under separate permit. | $209,500 | |
| Dec 29, 2020 | Completed final sign-off Jun 2021 | 444 Battery St | Gci, Inc | rev to pa# 201908269776. (aka 9 maritime plaza) increased scope of work. selective demolition of non-structural partitions & doors. construction of new non-structural partitions & doors. fire rating of elevator lobby has been reduced.Details
rev to pa# 201908269776. (aka 9 maritime plaza) increased scope of work. selective demolition of non-structural partitions & doors. construction of new non-structural partitions & doors. fire rating of elevator lobby has been reduced. | |
| Dec 9, 2020 | Completed final sign-off Jun 2021 | 1 Daniel Burnham Ct | Rossi Builders Inc. | 4/f: suite 400 - demo and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes incl restroom upgrades. fire alarm and fire sprinkler deferred.Details
4/f: suite 400 - demo and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes incl restroom upgrades. fire alarm and fire sprinkler deferred. | $430,611 |
| Dec 2, 2020 | Completed final sign-off Mar 2021 | 225 Bush St | Gci, Inc | fl 20th, 21st, 22nd: demo non-structural doors, millwork, ceiling, grid, lighting, flooring & equipment.Details
fl 20th, 21st, 22nd: demo non-structural doors, millwork, ceiling, grid, lighting, flooring & equipment. | $100,000 |
| Nov 12, 2020 | Completed final sign-off Mar 2021 | 275 Battery St | Hathaway Dinwiddie Co. | mechanical and electrical deferred submittal for pa# 201912139469, 3rd fl tenant improvement.Details
mechanical and electrical deferred submittal for pa# 201912139469, 3rd fl tenant improvement. | $35,000 |
| Nov 6, 2020 | Never finaled issued Jan 2021, no final | 101 Mission St | Gci, Inc | 10/f: restroom accessibility upgrades on the 10/f: mens and womensDetails
10/f: restroom accessibility upgrades on the 10/f: mens and womens | $30,000 |
| Nov 6, 2020 | Completed final sign-off Aug 2022 | 101 Mission St | Gci, Inc | 11/f: restroom accessibility upgrades on the 11/f: mens and womensDetails
11/f: restroom accessibility upgrades on the 11/f: mens and womens | $30,000 |
| Oct 29, 2020 | Completed final sign-off Apr 2022 | 555 California St | Bcci Construction Company | 4th,7th, & 10th flr demolition only of non-structural partitions, doors,glazing,millwork,ceiling,lighting & finishes. no change in occupancy, use, or area. mep, life safety & sprinklers under separate permit. ab-017.Details
4th,7th, & 10th flr demolition only of non-structural partitions, doors,glazing,millwork,ceiling,lighting & finishes. no change in occupancy, use, or area. mep, life safety & sprinklers under separate permit. ab-017. | $467,280 |
| Oct 19, 2020 | Completed final sign-off Jun 2022 | 75 Hawthorne St | Field Construction Inc. | 8th floor: ti includes non-structural demo, construction of non-structural partitions, doors, interior glazing, ceiling, light fixtures, millwork, and finishes. no cahnge in occupancy, use, or area. lifesafety & sprinklers under separate permit.Details
8th floor: ti includes non-structural demo, construction of non-structural partitions, doors, interior glazing, ceiling, light fixtures, millwork, and finishes. no cahnge in occupancy, use, or area. lifesafety & sprinklers under separate permit. | $635,855 |
| Oct 7, 2020 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | revision to pa 201908199109. revised areas clouded with delta 7. addition of casework, sink and equipment. no change in occupancy, area or use.Details
revision to pa 201908199109. revised areas clouded with delta 7. addition of casework, sink and equipment. no change in occupancy, area or use. | $8,810 |
| Oct 6, 2020 | Completed final sign-off Jan 2021 | 2 Embarcadero Center | Source Planning And Construction Inc | revision to pa #2020 0722 0710. existing tile & grid to be remained, existing lights to be relamped, existing signs & strobes to remain. new havc grillesDetails
revision to pa #2020 0722 0710. existing tile & grid to be remained, existing lights to be relamped, existing signs & strobes to remain. new havc grilles | |
| Oct 1, 2020 | Completed final sign-off Aug 2021 | 1 California St | G Swanson Constr. Inc. | barrier removal only at 21st fl. toilet rooms, remove, replace relocate accessories, all plumb fixtures to remain no mep sprinkler or life safety as all (e) equipment and devices to remain. n/a maherDetails
barrier removal only at 21st fl. toilet rooms, remove, replace relocate accessories, all plumb fixtures to remain no mep sprinkler or life safety as all (e) equipment and devices to remain. n/a maher | $29,685 |
| Oct 1, 2020 | Completed final sign-off Aug 2021 | 150 California St | Team Commercial Construction Inc. | ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permitDetails
ground floor - new non struct partitions, ceiling & lighting, millwork and finishes, no change in occuancy area or use, mep, life safety, sprinklers under sep permit | $30,750 |
| Sep 26, 2020 | Completed final sign-off Jun 2021 | 405 Howard St | Sc Builders, Inc | 3/f: t.i.:new non-structural partitions, doors, glazing, millwork, finishes. no change in occupancy, use or area. life safety & sprinklers under sep permit.Details
3/f: t.i.:new non-structural partitions, doors, glazing, millwork, finishes. no change in occupancy, use or area. life safety & sprinklers under sep permit. | $383,125 |
| Aug 22, 2020 | Completed final sign-off Sep 2022 | 600 Montgomery St | Hathaway Dinwiddie Co. | revision to bpa# 201907105505- demo of non-structural partitions (ceiling to remain); fireproofing deferred submittal; framing associated with temporary opening slabbtw floor 49-50 for hoistway; and electrical riser for vertical power to enable tomporary power during construction. no exterior work.Details
revision to bpa# 201907105505- demo of non-structural partitions (ceiling to remain); fireproofing deferred submittal; framing associated with temporary opening slabbtw floor 49-50 for hoistway; and electrical riser for vertical power to enable tomporary power during construction. no exterior work. | $100,000 |
| Aug 13, 2020 | Never finaled issued Jul 2021, no final | 3 Embarcadero Center | Skyline Construction | new communicating stairs between 20th & 21st floor.Details
new communicating stairs between 20th & 21st floor. | $250,000 |
| Jul 6, 2020 | Completed final sign-off Mar 2021 | 301 Howard St | Skyline Construction | 18th floor: t.i. of an extg full floor tenant suite. scope of work include: non-structural demolition, new non-structural partitions, lighting, millwork and finishes. toilet room upgrades. no change in occupancy, use or area.Details
18th floor: t.i. of an extg full floor tenant suite. scope of work include: non-structural demolition, new non-structural partitions, lighting, millwork and finishes. toilet room upgrades. no change in occupancy, use or area. | $964,862 |
| Jul 1, 2020 | Completed final sign-off Sep 2020 | 150 California St | Team Commercial Construction Inc. | revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture.Details
revision to pa #2019-0508-0066: addition of 1 office, electrical, lighting. addition of av monitos, card readers, cameras and power for furniture. | $41,000 |
| Mar 16, 2020 | Completed final sign-off Jan 2021 | 1 Embarcadero Center | Gci, Inc | 35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferredDetails
35/f: demo of (e) non structural partitions. new interior improvements (partitions non-structural, dfh, lighting, finishes, new furniture systems power & data) meps deferred | $25,000 |
| Mar 12, 2020 | Expired or cancelled cancelled Jan 2026 | 4 Embarcadero Center | one new demising wall. no change in occupancy use or area. mep, ls, sprinklers under sep permitDetails
one new demising wall. no change in occupancy use or area. mep, ls, sprinklers under sep permit | $20,000 | |
| Feb 27, 2020 | Completed final sign-off Dec 2020 | 50 California St | Richlen Construction | 25th floor: upgrade toilet room for accessibility. barrier removal only. no change in occupancy, use or area.Details
25th floor: upgrade toilet room for accessibility. barrier removal only. no change in occupancy, use or area. | $32,365 |
| Feb 7, 2020 | Never finaled issued Feb 2020, no final | 101 Mission St | Gci, Inc | 2nd fl, suite 200: revision to pa #201910114239. addition of millwork island and light fixtures in breakroom & addition of private officec to existing unoccupied speculative office suite.Details
2nd fl, suite 200: revision to pa #201910114239. addition of millwork island and light fixtures in breakroom & addition of private officec to existing unoccupied speculative office suite. | $15,532 |
| Jan 16, 2020 | Completed final sign-off Jun 2020 | 275 Battery St | Hathaway Dinwiddie Co. | 2nd fl - revision to pa 2019-1121-7889 relocation of it room. move backgrounds match mep drawings. no change in occupancy, use or area. mep, sprinklers, life safety under separate permitDetails
2nd fl - revision to pa 2019-1121-7889 relocation of it room. move backgrounds match mep drawings. no change in occupancy, use or area. mep, sprinklers, life safety under separate permit | $50,000 |
| Jan 16, 2020 | Completed final sign-off Jun 2020 | 275 Battery St | Hathaway Dinwiddie Co. | 2nd fl - mep drawings to support tenant improvement permit ap 2019-1121-7789 & permit revision 2020-0116-2010Details
2nd fl - mep drawings to support tenant improvement permit ap 2019-1121-7789 & permit revision 2020-0116-2010 | $450,000 |
| Jan 13, 2020 | Completed final sign-off May 2021 | 4 Embarcadero Center | Source Planning And Construction Inc | 39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinkleredDetails
39th fl, ste 3950 - ti include the modification to the exterior opening to comply with ada code and the addition of a guardrail at the existing parapet. (life safety work will be design build under separate permit. bldg fully sprinklered | $100,000 |
| Jan 2, 2020 | Completed final sign-off Jul 2020 | 275 Battery St | Hathaway Dinwiddie Co. | rev to pa# 201904228576; revision to handrail, track lighting n/a maherDetails
rev to pa# 201904228576; revision to handrail, track lighting n/a maher | |
| Dec 20, 2019 | Completed final sign-off Jun 2020 | 2 Embarcadero Center | M C S Construction Services | 16/f: new non structural partitons, ceiling, lighting, finishes elec. no change in area occupancy use. mep, ls, sprklr sep permit. maher n/a.Details
16/f: new non structural partitons, ceiling, lighting, finishes elec. no change in area occupancy use. mep, ls, sprklr sep permit. maher n/a. | $281,260 |
| Dec 19, 2019 | Completed final sign-off Aug 2020 | 1 California St | R.M.R. Construction Company | 22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systemsDetails
22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systems | $450,000 |
| Dec 17, 2019 | Completed final sign-off Dec 2020 | 50 California St | Richlen Construction | 33rd fl: demo of e non-struc partitions, power/data, millwork, plumbing & ceiling systems including removal of hazardous materials on an unoccupied full fl. space will remain unoccupied. any future buildouts will be under a sep permit. per ab-017. no change to use, occupancy, or sf. maher naDetails
33rd fl: demo of e non-struc partitions, power/data, millwork, plumbing & ceiling systems including removal of hazardous materials on an unoccupied full fl. space will remain unoccupied. any future buildouts will be under a sep permit. per ab-017. no change to use, occupancy, or sf. maher na | $114,120 |
| Dec 13, 2019 | Completed final sign-off Mar 2021 | 275 Battery St | Hathaway Dinwiddie Co. | suite 300. tenant improvement to (e) space. demo non-structural partitions. construct (n) non-structural partitions. new power, data, glazing, millwork and finishesDetails
suite 300. tenant improvement to (e) space. demo non-structural partitions. construct (n) non-structural partitions. new power, data, glazing, millwork and finishes | $385,000 |
| Nov 27, 2019 | Completed final sign-off Oct 2020 | 100 Pine St | 3rd fl - selective demo of partitions, ceiling, light fixtures and finishes. construction of new partitions, ceiling, lighting & finishes. no change in occupancy or use. this project is to be design-build mep, life safety & sprinklers to be filed under separate permitDetails
3rd fl - selective demo of partitions, ceiling, light fixtures and finishes. construction of new partitions, ceiling, lighting & finishes. no change in occupancy or use. this project is to be design-build mep, life safety & sprinklers to be filed under separate permit | $143,448 | |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 575 Market St | M C S Construction Services | suite #2550: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.Details
suite #2550: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit. | $258,141 |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 575 Market St | M C S Construction Services | suite #2500: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.Details
suite #2500: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit. | $387,537 |
| Nov 22, 2019 | Completed final sign-off Sep 2020 | 575 Market St | M C S Construction Services | suite #2050: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit.Details
suite #2050: new non-structural demo & construction - partitions, ceiling lights, millwork, & finishes. no change in occupancy, use, or area. mep. life safety, & sprinklers under separate permit. | $117,101 |
| Nov 21, 2019 | Completed final sign-off Dec 2020 | 275 Battery St | Hathaway Dinwiddie Co. | accessible upgrades to e restroom multi tenant corridor upgrades, non structural partitionsDetails
accessible upgrades to e restroom multi tenant corridor upgrades, non structural partitions | $122,000 |
| Nov 21, 2019 | Completed final sign-off Jun 2020 | 275 Battery St | Hathaway Dinwiddie Co. | 2nd fl - ti to existing office space, demo of non-structural partitions, construction of new non-structural partitions, new lighting, elecDetails
2nd fl - ti to existing office space, demo of non-structural partitions, construction of new non-structural partitions, new lighting, elec | $534,276 |
| Nov 20, 2019 | Completed final sign-off Aug 2020 | 275 Battery St | Gci, Inc | 29th fl: demolition of (e) structural partitions, and millwork, construction of new non structural partitions, lighting and finishes, there will be no change in occpuancy and no change in floor area, electrical, life safety, fire sprinkler work to be submitted/completed under separate permit(s)Details
29th fl: demolition of (e) structural partitions, and millwork, construction of new non structural partitions, lighting and finishes, there will be no change in occpuancy and no change in floor area, electrical, life safety, fire sprinkler work to be submitted/completed under separate permit(s) | $3,363 |
| Nov 20, 2019 | Completed final sign-off Sep 2020 | 4 Embarcadero Center | Bcci Construction Company | 3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.Details
3rd floor: revision to pa# 2019-0528-1822: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit. | $5,000 |
| Nov 20, 2019 | Completed final sign-off Sep 2020 | 4 Embarcadero Center | Bcci Construction Company | 2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.Details
2nd floor: revision to pa# 2019-0522-1464: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit. | $5,000 |
| Nov 20, 2019 | Completed final sign-off Sep 2020 | 4 Embarcadero Center | Bcci Construction Company | 4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit.Details
4th floor: revision to pa# 2019-0606-2703: ceiling height furring, tile, & paint. no change in occupancy, use, or area. mep, sprinklers, & life safety under separate permit. | $5,000 |
| Nov 4, 2019 | Completed final sign-off Apr 2021 | 555 California St | Bcci Construction Company | this project on the 30th fl consist of selective demo of (e) non-structural partitions, doors/frames, millwork, ceiling grid & tile, lighting, power & finishes. no change in occupancy & floor area. life safety is design build and under separate permit. demo per ab-017. maher na ref pa201909192166.Details
this project on the 30th fl consist of selective demo of (e) non-structural partitions, doors/frames, millwork, ceiling grid & tile, lighting, power & finishes. no change in occupancy & floor area. life safety is design build and under separate permit. demo per ab-017. maher na ref pa201909192166. | $181,720 |
| Nov 1, 2019 | Completed final sign-off Oct 2021 | 2 Embarcadero Center | M C S Construction Services | 4th floor: non-structural demo, new non-structural partitions, doors, frames, hardware, lighting, millwork, finishes. no change in occupancy or area,or use. mep, life safty, sprinklers under seperate permit. n/a for maherDetails
4th floor: non-structural demo, new non-structural partitions, doors, frames, hardware, lighting, millwork, finishes. no change in occupancy or area,or use. mep, life safty, sprinklers under seperate permit. n/a for maher | $251,084 |
| Oct 29, 2019 | Never finaled issued Nov 2019, no final | 100 Pine St | Capitol Electric Const | construction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or useDetails
construction of 2 hr rated shaft enclosure to house 2 way communication emergency radio conduit through 2nd & 8th floor elevator lobbies. no structural work to be included in scope, no increase in area. no increase in occupancy or use | $50,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2020 | 50 Beale St | Field Construction Inc. | mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing.Details
mechanical alterations to e basement gas room. work includes new mech louvers at gr level facade/glazing. | $5,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2020 | 50 Beale St | Field Construction Inc. | addition of ventilation fan to existing as meter room in basementDetails
addition of ventilation fan to existing as meter room in basement | $50,000 |
| Oct 17, 2019 | Completed final sign-off May 2021 | 100 Pine St | Team Commercial Construction Inc. | suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit.Details
suite 3035: demo of (e) non-structural partitions, lights, millwork and finishes in (e) tenant space n/a maher per ab-017. restroom demo excluded from this permit. | $23,103 |
| Oct 15, 2019 | Completed final sign-off Jun 2020 | 600 Montgomery St | Hathaway Dinwiddie Co. | 17/f: accessibility upgrade to (e) mulit accomodation restrooms on 17th fl, finish upgrades to common area corridorDetails
17/f: accessibility upgrade to (e) mulit accomodation restrooms on 17th fl, finish upgrades to common area corridor | $105,300 |
| Sep 30, 2019 | Completed final sign-off Feb 2020 | 1 California St | R.M.R. Construction Company | 22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a.Details
22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a. | $587,500 |
| Sep 6, 2019 | Completed final sign-off Aug 2020 | 1 Embarcadero Center | suite 1310: non-structural demo. (n) non-structural partitions, doors, finishes. no change in occup, use or area. mep, life safety & sprinklers under sep permit. maher naDetails
suite 1310: non-structural demo. (n) non-structural partitions, doors, finishes. no change in occup, use or area. mep, life safety & sprinklers under sep permit. maher na | $13,891 | |
| Aug 26, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | non-structural demo. (n) non-structural partitions, ceiling and lights, electrical, millwork and finishes. no change in occupancy, use or area. mep, sprinklerand life safety under separate permit.Details
non-structural demo. (n) non-structural partitions, ceiling and lights, electrical, millwork and finishes. no change in occupancy, use or area. mep, sprinklerand life safety under separate permit. | $969,253 |
| Aug 26, 2019 | Completed final sign-off Sep 2019 | 1 Maritime Pz | Gci, Inc | 11th fl: revision to pa #201907186317. (n) gyp bd, (n) ceiling & lights per ab-017 & pa #201807305831. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit. maher na.Details
11th fl: revision to pa #201907186317. (n) gyp bd, (n) ceiling & lights per ab-017 & pa #201807305831. no change in occupancy, use or area. mep, life safety & sprinklers under separate permit. maher na. | |
| Aug 26, 2019 | Completed final sign-off Jun 2021 | 444 Battery St | Gci, Inc | (aka 9 maritime plaza) 1st fl - (n) structural demo, (n) walls, doors, (e) ceiling & lighting to remain. no change in occupany use or area, mep, life safety & sprinklers under separate permit. maher na. work is at elevator lobby.Details
(aka 9 maritime plaza) 1st fl - (n) structural demo, (n) walls, doors, (e) ceiling & lighting to remain. no change in occupany use or area, mep, life safety & sprinklers under separate permit. maher na. work is at elevator lobby. | $8,528 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 600 Montgomery St | Skyline Construction | 17th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demo walls. remove mech duct back to main loop. no struct. ab-017.Details
17th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demo walls. remove mech duct back to main loop. no struct. ab-017. | $300,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | 19th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no structDetails
19th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct | $300,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | 11th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no structDetails
11th flr - demo all (e) partitions, doors, millwork, ceiling grid, ceiling hard lid, flooring & equip. removal all ele from floor outlets and demod walls. remove mecj duct back to main loop. no struct | $300,000 |
| Aug 21, 2019 | Completed final sign-off Aug 2020 | 505 Sansome St | Skyline Construction | interior tenant improvement of e lobby and conference room. demo non structural finishes, flooring, lighting, new non structural partitions, glazing, doors, power data, finishes, millwork, ceiling assembly and lightingDetails
interior tenant improvement of e lobby and conference room. demo non structural finishes, flooring, lighting, new non structural partitions, glazing, doors, power data, finishes, millwork, ceiling assembly and lighting | $364,982 |
| Aug 19, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | 2nd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permitDetails
2nd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit | $1,574,436 |
| Aug 19, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | 3rd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permitDetails
3rd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit | $1,267,080 |
| Aug 15, 2019 | Completed final sign-off Mar 2021 | 291 Geary St | U S Prime Contractor Inc | brick wall opening on 4th fl, and one ada accessible bathroom.Details
brick wall opening on 4th fl, and one ada accessible bathroom. | $5,000 |
| Aug 14, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | non structural demo, new non struct partitions, ceiling and lights, finishes,millwork, power data. no change in occupancy, use, area. mep, life safety, sprinklers sep permitDetails
non structural demo, new non struct partitions, ceiling and lights, finishes,millwork, power data. no change in occupancy, use, area. mep, life safety, sprinklers sep permit | $1,009,750 |
| Aug 13, 2019 | Completed final sign-off Feb 2020 | 1 Embarcadero Center | 2nd fl - non-structural, demo (n), non-structural partitions, electrical outlets. no change in occupancy use or area. mep, life safety, srpinklers under separate permitDetails
2nd fl - non-structural, demo (n), non-structural partitions, electrical outlets. no change in occupancy use or area. mep, life safety, srpinklers under separate permit | $6,004 | |
| Aug 5, 2019 | Completed final sign-off Feb 2020 | 1 Embarcadero Center | M C S Construction Services | 7th floor:non structural demo new non struc partitions, millwork, finishes. no change in occupancy, use, or area. mep sprinkler, lf, sep permitDetails
7th floor:non structural demo new non struc partitions, millwork, finishes. no change in occupancy, use, or area. mep sprinkler, lf, sep permit | $64,944 |
| Aug 5, 2019 | Completed final sign-off Nov 2019 | 1 Embarcadero Center | M C S Construction Services | 7th floor: non structural demo. relocate of toilets accessories and accessible stalls. no change in occupany, use or area. mep,sprinkler, life safety sep permit barrier removal onlyDetails
7th floor: non structural demo. relocate of toilets accessories and accessible stalls. no change in occupany, use or area. mep,sprinkler, life safety sep permit barrier removal only | $21,906 |
| Jul 30, 2019 | Completed final sign-off Sep 2020 | 1 California St | R.M.R. Construction Company | demo of (e) stair between 30 & 31 , infill slab at 31st fl. no change in occupancy, use or area, life safety & sprinklers & mep under sep permitDetails
demo of (e) stair between 30 & 31 , infill slab at 31st fl. no change in occupancy, use or area, life safety & sprinklers & mep under sep permit | $190,000 |
| Jul 26, 2019 | Completed final sign-off Jun 2020 | 275 Battery St | Hathaway Dinwiddie Co. | suite #440 -ti to (e) space. demo non structural partitions. construction of non structural partitions, lights, power, data, glazing, millwork and new finishes.Details
suite #440 -ti to (e) space. demo non structural partitions. construction of non structural partitions, lights, power, data, glazing, millwork and new finishes. | $285,000 |
| Jul 26, 2019 | Never finaled issued Sep 2019, no final | 505 Sansome St | Skyline Construction | 1/f demolish all (e) partitions, doors, millwork, ceiling grid, lighting, flooring, and equipment remove all equipment from fl. outlets & demollised walls,equipment from floor outlets and demolished loops remove mech duct work back to main loop mezzanine structural member to be demolished n/a maherDetails
1/f demolish all (e) partitions, doors, millwork, ceiling grid, lighting, flooring, and equipment remove all equipment from fl. outlets & demollised walls,equipment from floor outlets and demolished loops remove mech duct work back to main loop mezzanine structural member to be demolished n/a maher | $124,000 |
| Jul 24, 2019 | Completed final sign-off Jun 2020 | 600 Montgomery St | Hathaway Dinwiddie Co. | ti on 30th fl to existing office space. non-structural partitions doors, data/power finighses, ceiling, lighting.Details
ti on 30th fl to existing office space. non-structural partitions doors, data/power finighses, ceiling, lighting. | $495,072 |