Block 3920, lot 001
100 Potrero Ave
- City’s use
- Commercial Office
- Built
- 1910
- Stories
- 3
- Rooms
- 8 bathrooms
- Building
- 70,416 sq ft
- Lot
- 22,800 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
44 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2025 | Completed final sign-off May 2025 | 100 Potrero Av | Pyro-Comm Systems, Inc. | 1st fl: ref pa # 2025-0122-8830 addition to (e) fire alarm system, add 6 strobe/ceiling. add 1 speaker strobeDetails
1st fl: ref pa # 2025-0122-8830 addition to (e) fire alarm system, add 6 strobe/ceiling. add 1 speaker strobe | $6,500 |
| Jan 28, 2025 | Completed final sign-off Apr 2025 | 100 Potrero Av | Ayoob & Peery Plumbing Co Inc | 1/f and mezz level: add (2) relocate (9) fire sprinkler ti. job #25-601. ref pa# 202501228830Details
1/f and mezz level: add (2) relocate (9) fire sprinkler ti. job #25-601. ref pa# 202501228830 | $6,832 |
| Jan 22, 2025 | Completed final sign-off May 2025 | 100 Potrero Av | Novo Construction Inc | 1/f & mezzanine: selective demo of interior non-structural partitions, doors, millwork & finishes. construction of interior non-structural partitions, floor, wall & ceiling finishes. construction of suspended acoustical grid ceilings. mech & electrical included.Details
1/f & mezzanine: selective demo of interior non-structural partitions, doors, millwork & finishes. construction of interior non-structural partitions, floor, wall & ceiling finishes. construction of suspended acoustical grid ceilings. mech & electrical included. | $1,268,881 |
| Feb 23, 2022 | Completed final sign-off Mar 2022 | 100 Potrero Av | Pyro-Comm Systems, Inc. | fire alarm: this is an addition to an extg fire alarm system. 46 ceiling speaker strobes to be added to provide coverage for phone booths. arch pa ref # 202110291433Details
fire alarm: this is an addition to an extg fire alarm system. 46 ceiling speaker strobes to be added to provide coverage for phone booths. arch pa ref # 202110291433 | $15,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 100 Potrero Av | Ayoob & Peery Plumbing Co Inc | t.i., 1/f-add (13) fire sprinklers; 2/f-add (23) fire sprinklers; 3/f-add (10) fire sprinklers; ref bpa#202110291433Details
t.i., 1/f-add (13) fire sprinklers; 2/f-add (23) fire sprinklers; 3/f-add (10) fire sprinklers; ref bpa#202110291433 | $24,150 |
| Oct 29, 2021 | Completed final sign-off Mar 2022 | 100 Potrero Av | Bcci Construction Company | installation of (46) free standing phone booth furniture units, work includes fire sprinklers (deferred) and life safety devices (deferred) work to be performed in spaces constructed under the following app # 2019-0826-9778, 2019-0819-9110, 2019-0819-9109Details
installation of (46) free standing phone booth furniture units, work includes fire sprinklers (deferred) and life safety devices (deferred) work to be performed in spaces constructed under the following app # 2019-0826-9778, 2019-0819-9110, 2019-0819-9109 | $140,000 |
| Dec 21, 2020 | Completed final sign-off May 2021 | 100 Potrero Av | Bcci Construction Company | fire only evac. permit to show new signage and location of evac signs on floors 1, 2 and 3. ref. 2019-0814-8715.Details
fire only evac. permit to show new signage and location of evac signs on floors 1, 2 and 3. ref. 2019-0814-8715. | |
| Oct 7, 2020 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | revision to pa 201908199109. revised areas clouded with delta 7. addition of casework, sink and equipment. no change in occupancy, area or use.Details
revision to pa 201908199109. revised areas clouded with delta 7. addition of casework, sink and equipment. no change in occupancy, area or use. | $8,810 |
| Jul 28, 2020 | Never finaled issued Jul 2020, no final | 100 Potrero Av | street spaceDetails
street space | ||
| May 19, 2020 | Never finaled issued May 2020, no final | 100 Potrero Av | street spaceDetails
street space | ||
| Mar 12, 2020 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | revision t0 201908148715 revised areas clouded with delta 6. scope of work limited to addition of storage rm, relocation of mothers rm, janitor rm. no change in occupancy groups, area or useDetails
revision t0 201908148715 revised areas clouded with delta 6. scope of work limited to addition of storage rm, relocation of mothers rm, janitor rm. no change in occupancy groups, area or use | |
| Feb 24, 2020 | Never finaled issued Feb 2020, no final | 100 Potrero Av | street spaceDetails
street space | ||
| Jan 31, 2020 | Completed final sign-off Jun 2020 | 100 Potrero Av | Arrow Sign Company | install 1 non-illuminated wall sign "faire"Details
install 1 non-illuminated wall sign "faire" | $1,100 |
| Jan 31, 2020 | Completed final sign-off Jun 2020 | 100 Potrero Av | Arrow Sign Company | install 1 non-illuminated wall sign "faire"Details
install 1 non-illuminated wall sign "faire" | $1,100 |
| Jan 3, 2020 | Never finaled issued Jan 2020, no final | 100 Potrero Av | Bcci Construction Company | street spaceDetails
street space | |
| Dec 20, 2019 | Completed final sign-off May 2021 | 100 Potrero Av | Pyro-Comm Systems, Inc. | fire alarm 17 wall speaker strobes, 10 ceiling strobes, 4 ceiling strobes, 1 smoke detector to be added to existing facuDetails
fire alarm 17 wall speaker strobes, 10 ceiling strobes, 4 ceiling strobes, 1 smoke detector to be added to existing facu | $17,000 |
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 100 Potrero Av | Pyro-Comm Systems, Inc. | fire alarm 13 speaker strobes, 10 ceiling speaker strobes, 6 ceiling strobes to be added to (e) facu n/a maherDetails
fire alarm 13 speaker strobes, 10 ceiling speaker strobes, 6 ceiling strobes to be added to (e) facu n/a maher | $15,000 |
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 100 Potrero Av | Pyro-Comm Systems, Inc. | fire alarm 15 speaker wall strobe, 21 ceiling speaker strobes, 5 ceiling strobes to be added to (e) facuDetails
fire alarm 15 speaker wall strobe, 21 ceiling speaker strobes, 5 ceiling strobes to be added to (e) facu | $21,000 |
| Oct 25, 2019 | Completed final sign-off May 2021 | 100 Potrero Av | Eco Fire Sprinklers Inc | relocate 15 and add 59 new sprinklers in area of remodelDetails
relocate 15 and add 59 new sprinklers in area of remodel | $28,000 |
| Oct 21, 2019 | Never finaled issued Oct 2019, no final | 100 Potrero Av | streetspaceDetails
streetspace | ||
| Oct 1, 2019 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | ref: 2019-0819-9109: 3rd floor-mep to support arch permit. install ductwork. reheat piping, and new reheat vavs.Details
ref: 2019-0819-9109: 3rd floor-mep to support arch permit. install ductwork. reheat piping, and new reheat vavs. | $75,000 |
| Oct 1, 2019 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | 1st flr mep permit to support 201908148715, 201908269778. install ductwork, reheat piping, reheat vavs and new woling only vavs.Details
1st flr mep permit to support 201908148715, 201908269778. install ductwork, reheat piping, reheat vavs and new woling only vavs. | $75,000 |
| Sep 26, 2019 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | ref pa# 201908199110; 2nd fl. ductwork, reheat piping, reheat vavs and cooling only vavsDetails
ref pa# 201908199110; 2nd fl. ductwork, reheat piping, reheat vavs and cooling only vavs | $75,000 |
| Aug 26, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | non-structural demo. (n) non-structural partitions, ceiling and lights, electrical, millwork and finishes. no change in occupancy, use or area. mep, sprinklerand life safety under separate permit.Details
non-structural demo. (n) non-structural partitions, ceiling and lights, electrical, millwork and finishes. no change in occupancy, use or area. mep, sprinklerand life safety under separate permit. | $969,253 |
| Aug 19, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | 2nd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permitDetails
2nd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit | $1,574,436 |
| Aug 19, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | 3rd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permitDetails
3rd fl - non struct demo, (n) non-structural partitions, ceiling, lights, elec, millwork finishes. no change in occupancy, use or area. mep, life safety & sprinklers under a separate permit | $1,267,080 |
| Aug 15, 2019 | Completed final sign-off Oct 2020 | 100 Potrero Av | Pyro-Comm Systems, Inc. | ref pa# 201609016530;12 smoke detectors, 22 duct detectors, weathe proof duct detector, 1 wall strobe, 5 ceiling strobes, 12 speaker ceiling strobes, 27 wall speaker strokes, 2 weather proof strobes to be added to dedicated elevator recall sys facu.Details
ref pa# 201609016530;12 smoke detectors, 22 duct detectors, weathe proof duct detector, 1 wall strobe, 5 ceiling strobes, 12 speaker ceiling strobes, 27 wall speaker strokes, 2 weather proof strobes to be added to dedicated elevator recall sys facu. | $40,000 |
| Aug 14, 2019 | Completed final sign-off May 2020 | 100 Potrero Av | Bcci Construction Company | non structural demo, new non struct partitions, ceiling and lights, finishes,millwork, power data. no change in occupancy, use, area. mep, life safety, sprinklers sep permitDetails
non structural demo, new non struct partitions, ceiling and lights, finishes,millwork, power data. no change in occupancy, use, area. mep, life safety, sprinklers sep permit | $1,009,750 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 100 Potrero Av | street spaceDetails
street space | ||
| Aug 7, 2019 | Never finaled issued Aug 2019, no final | 100 Potrero Av | street spaceDetails
street space | ||
| May 1, 2019 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | roof revision to structural portion of previously approved permit. develop an laternative support system for roof mounted ahu equip skid ref 201811014793/201606139740Details
roof revision to structural portion of previously approved permit. develop an laternative support system for roof mounted ahu equip skid ref 201811014793/201606139740 | |
| Apr 26, 2019 | Completed final sign-off Dec 2020 | 100 Potrero Av | Eco Fire Sprinklers Inc | relocate mains & riser to 3rd fl. for seismic upgrade add fdc to (e) sprinkler systemDetails
relocate mains & riser to 3rd fl. for seismic upgrade add fdc to (e) sprinkler system | $12,000 |
| Dec 28, 2018 | Completed final sign-off Sep 2019 | 100 Potrero Av | Ingram Fire Protection Inc | demo (6) sprinklers in elevator shafts to accomodate change in type of elecator (changing from hydrolic to traction). ref pa #201511041665.Details
demo (6) sprinklers in elevator shafts to accomodate change in type of elecator (changing from hydrolic to traction). ref pa #201511041665. | $4,370 |
| Nov 28, 2018 | Expired or cancelled cancelled Jan 2026 | 100 Potrero Av | Bcci Construction Company | emergency responder radio coverage system that meets state and local codes and requirements ref 201810011864Details
emergency responder radio coverage system that meets state and local codes and requirements ref 201810011864 | $55,000 |
| Nov 1, 2018 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company | rev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklistDetails
rev to 201606139740, reduce scope of structural & mep work in the bldg to base bldg core improvements the bldg will remain unoccupied at the completion of the work. occupancy will occur after completion of future ti under sep. permits. project will comply with original permitted green bldg checklist | |
| Oct 1, 2018 | Completed final sign-off Apr 2021 | 100 Potrero Av | Bcci Construction Company, Dpr Construction | rev to pa #201606139740; reduces the scope of architectural work in the building to base building core improvements. the building will remain unoccupied at the completion of work. occupancy will occur after the completion of future t.i. under separate permit(s) project will comply with theDetails
rev to pa #201606139740; reduces the scope of architectural work in the building to base building core improvements. the building will remain unoccupied at the completion of work. occupancy will occur after the completion of future t.i. under separate permit(s) project will comply with the | |
| Sep 25, 2018 | Completed final sign-off Oct 2020 | 100 Potrero Av | Bcci Construction Company | voluntary seismic upgrade. ** maher: n/a **Details
voluntary seismic upgrade. ** maher: n/a ** | $1,000,100 |
| Sep 1, 2016 | Never finaled issued Apr 2017, no final | 100 Potrero Av | Pyro-Comm Systems, Inc. | phase 1 of a 2 phased project. division of new fa system to connect to new elevator system. the new fa system will be interconnected to the (e) fa system for alarm and trouble ref 201511041665. phase 2 to be done in future maher n/a.Details
phase 1 of a 2 phased project. division of new fa system to connect to new elevator system. the new fa system will be interconnected to the (e) fa system for alarm and trouble ref 201511041665. phase 2 to be done in future maher n/a. | $30,000 |
| Jun 13, 2016 | Completed final sign-off Apr 2022 | 100 Potrero Av | Bcci Construction Company, Dpr Construction | (maher ordinance - extended ordinance no.155-13 required) whole bldg renovation of an (e) unoccupied bldg. work includes partial tenant improvement, full replacement of (e) mech, elec, plumb, life/safety & fire sprinkler system, side walk replacement, window replacement.Details
(maher ordinance - extended ordinance no.155-13 required) whole bldg renovation of an (e) unoccupied bldg. work includes partial tenant improvement, full replacement of (e) mech, elec, plumb, life/safety & fire sprinkler system, side walk replacement, window replacement. | $8,408,400 |
| Nov 4, 2015 | Completed final sign-off Jun 2020 | 100 Potrero Av | Dpr Construction | demolition of three (e) elevators w/selective demolition of shaft walls, elevator pit wall, & slab on grade. installation of three (n) machine-roomless elevators w/(n) shaft concrete pit walls, & slab-on-grade. associated electrical work & structural rail supports. n/a maher ordinanceDetails
demolition of three (e) elevators w/selective demolition of shaft walls, elevator pit wall, & slab on grade. installation of three (n) machine-roomless elevators w/(n) shaft concrete pit walls, & slab-on-grade. associated electrical work & structural rail supports. n/a maher ordinance | $200,000 |
| Dec 28, 2012 | Never finaled issued May 2013, no final | 100 Potrero Av | for record purposes only for compliance w/ zoning administrator's letter of legitimization of office use dated 2/21/12 & pursuant to planning commission motion #18704 approving an office allocation for the entire bldg to legitimize 70,070 sq ft of (e) office space comprising the entire 3-story bldg.Details
for record purposes only for compliance w/ zoning administrator's letter of legitimization of office use dated 2/21/12 & pursuant to planning commission motion #18704 approving an office allocation for the entire bldg to legitimize 70,070 sq ft of (e) office space comprising the entire 3-story bldg. | ||
| Jun 10, 2011 | Completed final sign-off Nov 2011 | 100 Potrero Av | D.P. Stearns | tenant improvment on 2nd floor in a couple of rooms (420 sqft) only. minor non structural demolition such as removal of existing walls, doors & framing and installation of new acoustical wall, doors, frame and hardwareDetails
tenant improvment on 2nd floor in a couple of rooms (420 sqft) only. minor non structural demolition such as removal of existing walls, doors & framing and installation of new acoustical wall, doors, frame and hardware | $100,000 |
| Aug 18, 2006 | Never finaled issued Aug 2006, no final | 100 Potrero Av | street space permit only.Details
street space permit only. | ||
| Jun 5, 2000 | Expired or cancelled expired Oct 2000 | 100 Potrero Av | Simplex Grinnell*** See 802591**** | replace 46 sprinkler heads in kind with same k factor headsDetails
replace 46 sprinkler heads in kind with same k factor heads | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (18), Pyro-Comm Systems, Inc. (7), Dpr Construction (3), Arrow Sign Company (2), Ayoob & Peery Plumbing Co Inc (2), Eco Fire Sprinklers Inc (2), D.P. Stearns, Ingram Fire Protection Inc, Novo Construction Inc, Simplex Grinnell*** See 802591****
- Architects
- George D Soskin (6), Pamela Robinson (4), Huntsman, Kyle Elliot
- Engineers
- Eunice Yoon, Jason Lau, Rudolfo P Bustos Iii
- Authorized agent-otherss
- Adam Murphy
- Designers
- Ayoob & Peery, Michael Joseph Donahue
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.