From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress issued Jul 2026 | 555 California St | Bcci Construction Company | 46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening.Details
46th fl: revision to 202510217842. revise contemplation room layout, existing infrastructure conflict and temporary wall at future stair opening. | |
| Jul 1, 2026 | In progress issued Jul 2026 | 555 California St | Sc Builders, Inc | revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl openingDetails
revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening | $100,000 |
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 555 California St | Eco Fire Sprinklers Inc | 31st/f - demo existing pendent sprinklers and drops to bring existing system to warm shell, update existing seismic bracing per nfpa 13 on 31st floor for tenant improvement.building permit ref. #: 2025-1017-7609Details
31st/f - demo existing pendent sprinklers and drops to bring existing system to warm shell, update existing seismic bracing per nfpa 13 on 31st floor for tenant improvement.building permit ref. #: 2025-1017-7609 | $61,143 |
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 555 California St | Eco Fire Sprinklers Inc | demo (e) pendent sprinklers & drops to bring (e) system to warm shell, update (e) seismic bracing per nfpa 13 on 46th floor to ti. ref building pa# 202510177609.Details
demo (e) pendent sprinklers & drops to bring (e) system to warm shell, update (e) seismic bracing per nfpa 13 on 46th floor to ti. ref building pa# 202510177609. | $30,244 |
| Oct 17, 2025 | In progress issued Oct 2025 | 555 California St | Sc Builders, Inc | 31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out.Details
31st floor: demolition of non-structural partitions, glazing, mill work, ceilings, lighting, electrical fixtures, and finishes. suite to be demolished to warm shell condition for future tenant use and build out. | $400,000 |
| Dec 10, 2024 | Completed final sign-off Apr 2025 | 555 California St | R L H Fire Protection Inc | fire sprinkler permit. relocate 263, add 19, delete 5 sprinklers on 6th flDetails
fire sprinkler permit. relocate 263, add 19, delete 5 sprinklers on 6th fl | $75,000 |
| Oct 14, 2022 | Completed final sign-off May 2024 | 555 California St | Rab Com Limited | 27/f:furnish 2-way communications intercom stations for passenger & freight elevator lobbies.intercoms installed to provide comm. abilities during times that elevator lobby doors are locked. conduit,back boxes,cabling & installation by mcmillan elec. rab-com limited to program,test & comm. systemDetails
27/f:furnish 2-way communications intercom stations for passenger & freight elevator lobbies.intercoms installed to provide comm. abilities during times that elevator lobby doors are locked. conduit,back boxes,cabling & installation by mcmillan elec. rab-com limited to program,test & comm. system | $24,500 |
| Jun 22, 2022 | Completed final sign-off Sep 2022 | 555 California St | Bcci Construction Company | 43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred.Details
43rd floor demo of selective partitions, ceilings, millwork, doors/frames and finishes. new paritions, door, paint and lighting. mep deferred. | $125,000 |
| May 19, 2022 | Never finaled issued May 2022, no final | 555 California St | Pioneer Fire Inc. | relocate (e) pendents/upright and add new pendents sprinklers to accomodate buildout gcti 202203119780Details
relocate (e) pendents/upright and add new pendents sprinklers to accomodate buildout gcti 202203119780 | $11,750 |
| Mar 22, 2022 | Completed final sign-off Jul 2022 | 555 California St | Ayoob & Peery Plumbing Co Inc | 28th fl add (5) and relocate 84 sprinkler heads. job #22-608 ref 202203029073Details
28th fl add (5) and relocate 84 sprinkler heads. job #22-608 ref 202203029073 | $21,525 |
| Jan 25, 2022 | Completed final sign-off Mar 2022 | 555 California St | Pyro-Comm Systems, Inc. | 43/f: mod of (e) fire alarm system. 1 ceiling strobe will be provided for proper coverage. and voluntary installation of 2 smoke detector, 1 relay module and 1 door holder - pa 202010277522 (fa).Details
43/f: mod of (e) fire alarm system. 1 ceiling strobe will be provided for proper coverage. and voluntary installation of 2 smoke detector, 1 relay module and 1 door holder - pa 202010277522 (fa). | $3,000 |
| Dec 3, 2021 | Completed final sign-off Dec 2021 | 555 California St | G Swanson Constr. Inc. | flrs 6 & 11: revise pa 202102195039 cover page to state no mechanical work and electrical work only on flr 6.Details
flrs 6 & 11: revise pa 202102195039 cover page to state no mechanical work and electrical work only on flr 6. | |
| Sep 17, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | 7/f: full floor single tenant improvement including new partitions, lithgting and millwork. no change ofuse. deffered mep work. maher n/a.Details
7/f: full floor single tenant improvement including new partitions, lithgting and millwork. no change ofuse. deffered mep work. maher n/a. | $3,008,592 |
| Sep 15, 2021 | Completed final sign-off Jan 2022 | 555 California St | Pyro-Comm Systems, Inc. | 30/f: rev to pa202106172730: addition of 2 call stations for a temp 2-way systems that was requested by the tenant.Details
30/f: rev to pa202106172730: addition of 2 call stations for a temp 2-way systems that was requested by the tenant. | |
| Jun 25, 2021 | Completed final sign-off Nov 2022 | 555 California St | Skyline Construction | 8th floor full floor single tenant improvement including new partitions, lighting, and millwork. no structural work. no change of use. deferred mep.Details
8th floor full floor single tenant improvement including new partitions, lighting, and millwork. no structural work. no change of use. deferred mep. | $2,793,670 |
| Jun 24, 2021 | Completed final sign-off Dec 2022 | 555 California St | Skyline Construction | 9/f: full floor single t.i. inlcuding new partitions, lighting and millwork,. no structural work and no change of use. deffered mep work.Details
9/f: full floor single t.i. inlcuding new partitions, lighting and millwork,. no structural work and no change of use. deffered mep work. | $2,793,670 |
| Dec 29, 2020 | Never finaled issued Jul 2021, no final | 555 California St | Skyline Construction | 8/f & 9/f: full floor tenant demo of floors 8 & 9 exluding the core. no structural elements shall be modified or altered. to comply with ab-017, maher n/a.Details
8/f & 9/f: full floor tenant demo of floors 8 & 9 exluding the core. no structural elements shall be modified or altered. to comply with ab-017, maher n/a. | $415,845 |
| Sep 18, 2020 | Completed final sign-off Jun 2021 | 555 California St | Siemens Industry, Inc. | fl 46: fire only work for the corridor/suite 4646 remodel on floor 46; addition are 6 smoke detectors and 10 speaker/strobes, as well as the relocation of 1 smoke detector. ref permit app # 201912179736Details
fl 46: fire only work for the corridor/suite 4646 remodel on floor 46; addition are 6 smoke detectors and 10 speaker/strobes, as well as the relocation of 1 smoke detector. ref permit app # 201912179736 | $10,150 |
| Jan 15, 2020 | Never finaled issued Jan 2020, no final | 555 California St | street space w/mtaDetails
street space w/mta | ||
| Dec 17, 2019 | Completed final sign-off Jul 2021 | 555 California St | Peacock Construction | 46th fl: selective demo of (e) finishes, ceiling grid and tile, lighting, power, construction of new finishes, ceiling grid & tile, lighting & power, there will be no change in occupancy & no change in floor area n/a maherDetails
46th fl: selective demo of (e) finishes, ceiling grid and tile, lighting, power, construction of new finishes, ceiling grid & tile, lighting & power, there will be no change in occupancy & no change in floor area n/a maher | $236,152 |
| Nov 7, 2019 | Never finaled issued Nov 2019, no final | 555 California St | street space onlyDetails
street space only | ||
| Oct 31, 2019 | Completed final sign-off Nov 2019 | 555 California St | R L H Fire Protection Inc | fire sprinkler permit relocate 10, add 1 delete 1 sprinkler on 5th fl ti 201907196357Details
fire sprinkler permit relocate 10, add 1 delete 1 sprinkler on 5th fl ti 201907196357 | $2,600 |
| Oct 9, 2019 | Completed final sign-off Jan 2020 | 555 California St | Gci, Inc | 5/f: redistribute (e) ductwork for new floor layout. partial t.i. retrofit: lighting, power & signal, wiring & controls. ref t.i. pa#201907196357.Details
5/f: redistribute (e) ductwork for new floor layout. partial t.i. retrofit: lighting, power & signal, wiring & controls. ref t.i. pa#201907196357. | $125,000 |
| Oct 7, 2019 | Never finaled issued Oct 2019, no final | 555 California St | street space onlyDetails
street space only | ||
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 555 California St | Westates Mechanical Corporation Inc | 18th fl - tenant improvement for fire sprinklers. relocate and modify fire sprinklers as ti in the area of work. existing system to remain. total sprinkler modify 229. ref pa #201906173527.Details
18th fl - tenant improvement for fire sprinklers. relocate and modify fire sprinklers as ti in the area of work. existing system to remain. total sprinkler modify 229. ref pa #201906173527. | $60,000 |
| May 30, 2019 | Never finaled issued Jun 2019, no final | 555 California St | street space/mta metersDetails
street space/mta meters | ||
| Sep 7, 2018 | Completed final sign-off Dec 2018 | 555 California St | Dome Construction Corp | 1/f:interior non-structural demolition of extg interior 1st floor tenant space. scope of work to include removal of extg interior partitions, extg plumbing fixtures and extg finishes. ab-017. ref. permit app#201808016132 for ti. maher n/a.Details
1/f:interior non-structural demolition of extg interior 1st floor tenant space. scope of work to include removal of extg interior partitions, extg plumbing fixtures and extg finishes. ab-017. ref. permit app#201808016132 for ti. maher n/a. | $15,000 |
| Apr 18, 2018 | Completed final sign-off Apr 2019 | 555 California St | Skyline Construction | partial floor tenant to include construction of new drywall partitions, acoustic ceilings. new mech, and electrical and plumbing. new mill willwork finishes maher not reqDetails
partial floor tenant to include construction of new drywall partitions, acoustic ceilings. new mech, and electrical and plumbing. new mill willwork finishes maher not req | $525,000 |
| Jan 30, 2018 | Completed final sign-off Apr 2018 | 555 California St | Bcci Construction Company | concourse mechaniclal work only. new low pressure ductwork, 1 new supply grill and 2 return grills. ref 201712217109Details
concourse mechaniclal work only. new low pressure ductwork, 1 new supply grill and 2 return grills. ref 201712217109 | $25,500 |
| Sep 22, 2017 | Completed final sign-off Mar 2018 | 555 California St | Siemens Industry, Inc. | fire alarm work for the common areas on floor 34, additions are 10 speaker/strobes. ref#201708043894. n/a for maher.Details
fire alarm work for the common areas on floor 34, additions are 10 speaker/strobes. ref#201708043894. n/a for maher. | $5,100 |
| Sep 22, 2017 | Completed final sign-off Mar 2018 | 555 California St | Siemens Industry, Inc. | fire alarm work for the common areas on floor 33, additions are 4 smoke detectors, 2 speaker strobes. n/a for maher. ref# 201706290698. n/a for maher.Details
fire alarm work for the common areas on floor 33, additions are 4 smoke detectors, 2 speaker strobes. n/a for maher. ref# 201706290698. n/a for maher. | $3,460 |
| Sep 7, 2017 | Completed final sign-off Oct 2017 | 555 California St | Ayoob & Peery Plumbing Co Inc | 52nd floor: as built fire sprinklers. permit #201708225569. ref app201707212597. n/a for maherDetails
52nd floor: as built fire sprinklers. permit #201708225569. ref app201707212597. n/a for maher | |
| Aug 22, 2017 | Completed final sign-off Sep 2017 | 555 California St | Ayoob & Peery Plumbing Co Inc | 52nd floor: relocate 5 fire sprinklers, 3 concealed pendents and 2 uprights per t.i. ref app#201707212597. n/a maherDetails
52nd floor: relocate 5 fire sprinklers, 3 concealed pendents and 2 uprights per t.i. ref app#201707212597. n/a maher | $1,125 |
| Aug 8, 2017 | Completed final sign-off Nov 2017 | 555 California St | Ayoob & Peery Plumbing Co Inc | 33rd fl elevator lobby tenant improvement: relocate five (5) sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref #201706290698. maher naDetails
33rd fl elevator lobby tenant improvement: relocate five (5) sprinklers to conform with the new wall/ceiling layout of the tenant improvement. ref #201706290698. maher na | $2,625 |
| Aug 4, 2017 | Completed final sign-off Sep 2017 | 555 California St | Gci, Inc | 5/f: rev to pa201702018388: reduce scope from original project. (n) partiions, lighting, millwork, finishes. no change in occupancy use or area. mep, l/s, sprinklers under sep permit.Details
5/f: rev to pa201702018388: reduce scope from original project. (n) partiions, lighting, millwork, finishes. no change in occupancy use or area. mep, l/s, sprinklers under sep permit. | |
| Jul 21, 2017 | Completed final sign-off Sep 2023 | 555 California St | Bcci Construction Company | 52nd floor: provide new lighting and branch circuiting to extg panel. n/a for maher. ref #201707212597Details
52nd floor: provide new lighting and branch circuiting to extg panel. n/a for maher. ref #201707212597 | $15,000 |
| Jul 21, 2017 | Completed final sign-off Jan 2018 | 555 California St | Bcci Construction Company | 52nd floor: new water source heat pump for new zones. supply and return grilles with rapid mount framing. thermostat in space per hvac plan. n/a for maher.Details
52nd floor: new water source heat pump for new zones. supply and return grilles with rapid mount framing. thermostat in space per hvac plan. n/a for maher. | $10,000 |
| Jul 21, 2017 | Completed final sign-off Nov 2017 | 555 California St | Bcci Construction Company | 52nd fl modify existing storage room to ups room. modify existing office space to storage room and lactation roomDetails
52nd fl modify existing storage room to ups room. modify existing office space to storage room and lactation room | $20,000 |
| Jul 20, 2017 | Completed final sign-off Apr 2018 | 555 California St | Consolidated Contracting Services Inc. | suite #3400: tenant improvement to existing office space 34th fl mech,elec,plumbDetails
suite #3400: tenant improvement to existing office space 34th fl mech,elec,plumb | $1,000,000 |
| Jul 20, 2017 | Completed final sign-off Apr 2018 | 555 California St | Consolidated Contracting Services Inc. | suite #3200: tenant improvement to existing office space on the 32nd floorDetails
suite #3200: tenant improvement to existing office space on the 32nd floor | $2,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (6), Skyline Construction (5), Ayoob & Peery Plumbing Co Inc (4), Siemens Industry, Inc. (3), Consolidated Contracting Services Inc. (2), Eco Fire Sprinklers Inc (2), Gci, Inc (2), Pyro-Comm Systems, Inc. (2), R L H Fire Protection Inc (2), Sc Builders, Inc (2), Dome Construction Corp, G Swanson Constr. Inc., Peacock Construction, Pioneer Fire Inc., Rab Com Limited, Westates Mechanical Corporation Inc
- Architects
- Donnie Lam (4), Adam Murphy (2), David Alpert (2), George S Soskin (2), Lauren Jordan, Luda Hoe
- Engineers
- Clifford Dias (2), Ralph Mottola Jr (2), Alexander Joseph Pacheco, Zack Kardon, Zhen Chao Xiong
- Designers
- Ayoob & Peery Plumbing, Bruce D. Eads
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.