Aaron Hanigan
- License
- C33999
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Hdr Architecture Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2019 to Dec 2019
6 permits since 2000 (architect on 6 permits): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Rudolph And Sletten Inc (3), R.M.R. Construction Company (2), Team Commercial Construction Inc.
- Architects
- George Soskin (2)
- Engineers
- Philip Crompton (2), Rudolfo P Bustos Iii (2), Vahe Kouyoumdjian (2), Amit Wadhwa, Levi G. Abarte
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 19, 2019 | Completed final sign-off Aug 2020 | 1 California St | R.M.R. Construction Company | 22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systemsDetails
22nd fl, ste 2250 - interior ti of offices and related space. interior non-rated partitions, finishes, millwork, electrical plumbing and mechanical systems | $450,000 |
| Sep 30, 2019 | Completed final sign-off Feb 2020 | 1 California St | R.M.R. Construction Company | 22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a.Details
22/f - ste 2250: interior t.i. of office and related spaces. install non-rated partition, finishes, millwork, electrical, plumbing and mehcanical systems. fire sprinklers and l/s sep permits. maher n/a. | $587,500 |
| May 21, 2019 | Completed final sign-off Nov 2020 | 2645 Ocean Av | Rudolph And Sletten Inc | 3/f: project is limited to interior improvements on 3rd fl: no ext work is proposed. ti includes full demo of walls, caseworks, finishes, ceilings, lighting. new construction includes new partitions, finishes, doors, ceilings, casework, and mep.Details
3/f: project is limited to interior improvements on 3rd fl: no ext work is proposed. ti includes full demo of walls, caseworks, finishes, ceilings, lighting. new construction includes new partitions, finishes, doors, ceilings, casework, and mep. | $1,878,580 |
| May 21, 2019 | Completed final sign-off Nov 2020 | 2645 Ocean Av | Rudolph And Sletten Inc | ground fl ti: new partitions, finishes, doors, ceilings, casework, and mep.Details
ground fl ti: new partitions, finishes, doors, ceilings, casework, and mep. | $442,174 |
| Apr 22, 2019 | Completed final sign-off Nov 2020 | 2645 Ocean Av | Rudolph And Sletten Inc | 1st fl per ab-017 soft demo of walls, casework finishes, ceilings, lighitng. only partial floor soft demoDetails
1st fl per ab-017 soft demo of walls, casework finishes, ceilings, lighitng. only partial floor soft demo | $20,000 |
| Mar 28, 2019 | Completed final sign-off Sep 2019 | 100 Pine St | Team Commercial Construction Inc. | interior t.i. of office and related spaces, interior non-rated partitions, finishes, millwork. n/a maher mep deferred.Details
interior t.i. of office and related spaces, interior non-rated partitions, finishes, millwork. n/a maher mep deferred. | $560,000 |