Vahe Kouyoumdjian
- Listed as
- architect, engineer
- Firm
- Vhk, Inc.
- Based in
- Hayward
- On San Francisco permits
- Mar 2005 to Jun 2022
19 permits since 2000 (engineer on 18 permits, architect on 1 permit): 11 completed, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 3, 2022 | Completed final sign-off Apr 2023 | 1800 Owens St | Hathaway Dinwiddie Construct Co | revision to 202112234964. provide temporary feeder to power the roof life-safety fans & elevatorsDetails
revision to 202112234964. provide temporary feeder to power the roof life-safety fans & elevators | |
| Dec 23, 2021 | Completed final sign-off Apr 2023 | 1800 Owens St | Hathaway Dinwiddie Construct Co | replace(e)(2)(200 amp feeders from 2 mw generator to the roof w/(2)1600 amp feeder using (e)conduits & raceways.replace(2) 1200a ats w/(2) 2000a ats &(2)new 2000a distribution boards.replace(e)3000a emergency distribution swithboard w/ (n) 3000a swithchboard.Details
replace(e)(2)(200 amp feeders from 2 mw generator to the roof w/(2)1600 amp feeder using (e)conduits & raceways.replace(2) 1200a ats w/(2) 2000a ats &(2)new 2000a distribution boards.replace(e)3000a emergency distribution swithboard w/ (n) 3000a swithchboard. | $20,000 |
| Jan 21, 2021 | Never finaled issued Apr 2021, no final | 1 Market St | Dpr Construction | 2,4,5th floors: interior t.i. of (e) multi-user restrooms. work includes replacement of (e) plumbing and lighting fixtures, new floor and wall finishes.Details
2,4,5th floors: interior t.i. of (e) multi-user restrooms. work includes replacement of (e) plumbing and lighting fixtures, new floor and wall finishes. | $200,000 |
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 1700 Owens St | Rossi Builders Inc. | ref pa# 2019-0425-8886: electrical scope- furnish and install new lighting at conference office and meeting area and connect to exieting lighting circuits.Details
ref pa# 2019-0425-8886: electrical scope- furnish and install new lighting at conference office and meeting area and connect to exieting lighting circuits. | $57,000 |
| May 21, 2019 | Completed final sign-off Nov 2020 | 2645 Ocean Av | Rudolph And Sletten Inc | 3/f: project is limited to interior improvements on 3rd fl: no ext work is proposed. ti includes full demo of walls, caseworks, finishes, ceilings, lighting. new construction includes new partitions, finishes, doors, ceilings, casework, and mep.Details
3/f: project is limited to interior improvements on 3rd fl: no ext work is proposed. ti includes full demo of walls, caseworks, finishes, ceilings, lighting. new construction includes new partitions, finishes, doors, ceilings, casework, and mep. | $1,878,580 |
| May 21, 2019 | Completed final sign-off Nov 2020 | 2645 Ocean Av | Rudolph And Sletten Inc | ground fl ti: new partitions, finishes, doors, ceilings, casework, and mep.Details
ground fl ti: new partitions, finishes, doors, ceilings, casework, and mep. | $442,174 |
| Oct 12, 2018 | Never finaled issued Nov 2018, no final | 1800 Owens St | Hathaway Dinwiddie Co. | levels 1,p4 & 3 - miscellaneous ti work to building including: valet office, breakroom, building management office suite, mailroom.Details
levels 1,p4 & 3 - miscellaneous ti work to building including: valet office, breakroom, building management office suite, mailroom. | $2,000,000 |
| Feb 22, 2018 | Completed final sign-off Jun 2019 | 1800 Owens St | Hathaway Dinwiddie Co. | furnish & install 2 identical 1.5 mw optional standby generators located outdoors. the building electrical normal & standby distribution systems include structural & anchorage details have already been permitted by dbi. ref pa# 2014/09/04/5458-s & pa# 2017/08/17/5140. ** maher: n/a **Details
furnish & install 2 identical 1.5 mw optional standby generators located outdoors. the building electrical normal & standby distribution systems include structural & anchorage details have already been permitted by dbi. ref pa# 2014/09/04/5458-s & pa# 2017/08/17/5140. ** maher: n/a ** | $1,200,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 201 Spear St | Bcci Construction Company | 14th floor: provide new lighting and associated controls. ref app#201710121025. n/a for maherDetails
14th floor: provide new lighting and associated controls. ref app#201710121025. n/a for maher | $110,000 |
| Jul 14, 2015 | Completed final sign-off Jan 2017 | 199 Fremont St | Novo Construction Inc | 19th floor - mechanical & electrical work for tenant improvement. ref pa #2015.0415.3644. n/a maher ordinanceDetails
19th floor - mechanical & electrical work for tenant improvement. ref pa #2015.0415.3644. n/a maher ordinance | $3,500 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 536 Mission St | Mcclure Electric Inc | 2nd, 3rd, 5th floors - title 24 approval. ref pa #2015.0316.0912.Details
2nd, 3rd, 5th floors - title 24 approval. ref pa #2015.0316.0912. | |
| Feb 23, 2015 | Never finaled issued Feb 2015, no final | 536 Mission St | Mcclure Electric Inc | 1st & 6th flrs: title 24 approval, reference 201501155843.Details
1st & 6th flrs: title 24 approval, reference 201501155843. | $150,000 |
| Jun 26, 2014 | Expired or cancelled cancelled Jan 2026 | 335 Powell St | Mcclure Electric Inc | 14th floor - provide title 24 for t.i #2013.0807.3755. n/a maher ordinanceDetails
14th floor - provide title 24 for t.i #2013.0807.3755. n/a maher ordinance | $150,000 |
| Jun 26, 2014 | Expired or cancelled cancelled Jan 2026 | 536 Mission St | Mcclure Electric Inc | 2nd floor - provide title 24 for t.i #2014.0430.4585. n/a maher ordinanceDetails
2nd floor - provide title 24 for t.i #2014.0430.4585. n/a maher ordinance | $150,000 |
| May 13, 2014 | Never finaled issued May 2014, no final | 180 Montgomery St | Hathaway Dinwiddie Co. | 17th floor -relocated existing light fixture within open space and new private offices and conference rooms. provide new receptacles to new office and electrified partitions. provide egress lighting. ref #2014.0320.1253Details
17th floor -relocated existing light fixture within open space and new private offices and conference rooms. provide new receptacles to new office and electrified partitions. provide egress lighting. ref #2014.0320.1253 | $45,000 |
| Sep 24, 2007 | Completed final sign-off Dec 2007 | 30 Hotaling Pl | Gci, Inc | new lighting for full floor tenant space on first floor- construction under application 200707207297Details
new lighting for full floor tenant space on first floor- construction under application 200707207297 | $93,000 |
| Nov 4, 2005 | Expired or cancelled expired Jul 2007 | 555 Montgomery St | Hathaway Dinwiddie Co. | oti-2, 9th floor, me, el.Details
oti-2, 9th floor, me, el. | $50,000 |
| May 2, 2005 | Completed final sign-off Jul 2005 | 260 California St | Hathaway Dinwiddie Co. | oti-3 11th floor elDetails
oti-3 11th floor el | $30,000 |
| Mar 31, 2005 | Completed final sign-off May 2005 | 600 California St | Turner Construction Co | oti-3 7th floor - el(ref:200410136629)Details
oti-3 7th floor - el(ref:200410136629) | $15,000 |