Block 0260, lot 007
340 Pine St
- City’s use
- Commercial Office
- Built
- 1928
- Stories
- 8
- Building
- 61,632 sq ft
- Lot
- 7,906 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
49 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 10, 2020 | Never finaled issued May 2021, no final | 340 Pine St | Peacock Construction | demo (e) duct & hvac equipment. new duct & hvac equipment. reference to pa #201908027712 (deferred mep)Details
demo (e) duct & hvac equipment. new duct & hvac equipment. reference to pa #201908027712 (deferred mep) | |
| Jan 9, 2020 | Never finaled issued Jan 2020, no final | 340 Pine St | Peacock Construction | 2nd floor:rev to pa# 201908027712; this project involves modification of an (e) t.i. to include selective demo and construction of non load bearing partitions, new office doors & frames, new finishes and new ceiling tile, grid and fixturesDetails
2nd floor:rev to pa# 201908027712; this project involves modification of an (e) t.i. to include selective demo and construction of non load bearing partitions, new office doors & frames, new finishes and new ceiling tile, grid and fixtures | $100,000 |
| Nov 20, 2019 | Completed final sign-off Jun 2021 | 340 Pine St | Pyro-Comm Systems, Inc. | 3 smoke detectors, 2 ceiling strobes, 9 ceiling speaker/strobes to be aded to (e) facuDetails
3 smoke detectors, 2 ceiling strobes, 9 ceiling speaker/strobes to be aded to (e) facu | $7,500 |
| Oct 17, 2019 | Completed final sign-off Mar 2020 | 340 Pine St | Golden Gate Fire Protection Inc | 2nd floor: fire sprinkler only- relocate 7 pendents and 43 uprights for spec suite . 2nd floor.Details
2nd floor: fire sprinkler only- relocate 7 pendents and 43 uprights for spec suite . 2nd floor. | $25,000 |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 340 Pine St | Peacock Construction | t-24 electrical for work under pa# 201908027712Details
t-24 electrical for work under pa# 201908027712 | |
| Aug 2, 2019 | Never finaled issued Aug 2019, no final | 340 Pine St | Peacock Construction | 2nd st - project involves modification of an existing tenant improvement to include selectrive demo and construction of non load bearing partitions, new office doors and frames, new millwork and sink, new finishes, new ceiling tile & grid and new fixtures.Details
2nd st - project involves modification of an existing tenant improvement to include selectrive demo and construction of non load bearing partitions, new office doors and frames, new millwork and sink, new finishes, new ceiling tile & grid and new fixtures. | $587,400 |
| Dec 30, 2016 | Never finaled issued Dec 2016, no final | 340 Pine St | Air Systems, Inc. | removal & replacement of roof top hvac package unit and install ductwork. same location, less wt). n/a maher ordinanceDetails
removal & replacement of roof top hvac package unit and install ductwork. same location, less wt). n/a maher ordinance | $95,000 |
| Apr 16, 2015 | Never finaled issued Apr 2015, no final | 340 Pine St | Rossi Builders Inc. | basement & grnd flr: removal of (e) finishes & rail at (e) stair to remain to be abandoned in place. (n) flr slab at grnd flr. & (n) partition at basement to encapsulate stair, providing new partitions, door, power and data, and finishes maher - not req'dDetails
basement & grnd flr: removal of (e) finishes & rail at (e) stair to remain to be abandoned in place. (n) flr slab at grnd flr. & (n) partition at basement to encapsulate stair, providing new partitions, door, power and data, and finishes maher - not req'd | $40,000 |
| Mar 26, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Pyro-Comm Systems, Inc. | basement/1st.mezz: new fire alarm devices added to ti in an (e) bld to include: (1) power supply, (1) control module, (4) relay modules, (1) pull station, (32) horn/strobes, (1) strobe. (2) smoke det. maher - not req'd ref 201502062665, 201501276729Details
basement/1st.mezz: new fire alarm devices added to ti in an (e) bld to include: (1) power supply, (1) control module, (4) relay modules, (1) pull station, (32) horn/strobes, (1) strobe. (2) smoke det. maher - not req'd ref 201502062665, 201501276729 | $11,780 |
| Mar 23, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | revision to appl #2015.0206.7665 - delete (n) conference room from scope of work & back to storage room. (e) solid concrete shaft walls & rated doors to remain. n/a marher ordinanceDetails
revision to appl #2015.0206.7665 - delete (n) conference room from scope of work & back to storage room. (e) solid concrete shaft walls & rated doors to remain. n/a marher ordinance | |
| Mar 10, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Sure Fire Protection | sprinklers- ceilings changed - relocate (13)(e) ssp and add (2)(n) ssp, plug (2) (e) ssp - for removal of (e) ceilings change 34(e) ssp and add 3 to new ssu ref pa 2015 0206 7665 maher - not req'dDetails
sprinklers- ceilings changed - relocate (13)(e) ssp and add (2)(n) ssp, plug (2) (e) ssp - for removal of (e) ceilings change 34(e) ssp and add 3 to new ssu ref pa 2015 0206 7665 maher - not req'd | $10,000 |
| Mar 10, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Sure Fire Protection | for new wall, lights & ceilings - relocate (17)(e) ssp for removal of (e) ceilings change 10(e) ssp to new ssu ref pa 2015 0127 6929 maher - not req'dDetails
for new wall, lights & ceilings - relocate (17)(e) ssp for removal of (e) ceilings change 10(e) ssp to new ssu ref pa 2015 0127 6929 maher - not req'd | $5,000 |
| Feb 6, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | t.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with maher ordinance no 155-13 not required.Details
t.i. includes int. improvements to ground floor and mezz. level. doors. hardware, casework, toilet room, and associated ceilings where occurs. n/a for the maher. no exterior work. compliance with maher ordinance no 155-13 not required. | $850,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | t.i. in basement level, removal of (e) full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13Details
t.i. in basement level, removal of (e) full, ceiling height partitions, doors, hardware, casework, toilets. n/a ordinance #155-13 | $65,000 |
| Jan 14, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | demo only. ground floor, mezzanine. ab-017. high rise.Details
demo only. ground floor, mezzanine. ab-017. high rise. | $30,000 |
| Jan 8, 2015 | Completed final sign-off Nov 2015 | 340 Pine St | Rossi Builders Inc. | basement demo only - ermoval of (e) full & ceiling height interior partitions per ab-017. n/a maher ordinanceDetails
basement demo only - ermoval of (e) full & ceiling height interior partitions per ab-017. n/a maher ordinance | $30,000 |
| Jun 22, 2012 | Expired or cancelled cancelled Feb 2014 | 340 Pine St | Roebuck Construction | restroation of the original building facade on pine street with the removal of the gated patio. installation of a new entry & staircase to the basement & construction of new handicap accessible restroomsDetails
restroation of the original building facade on pine street with the removal of the gated patio. installation of a new entry & staircase to the basement & construction of new handicap accessible restrooms | $300,000 |
| Oct 22, 2010 | Expired or cancelled cancelled Mar 2015 | 340 Pine St | Roebuck Construction | change of use to permanent assembly space. convert basement storage as shown on plans into bathrooms. permit assembly space for ground floor.Details
change of use to permanent assembly space. convert basement storage as shown on plans into bathrooms. permit assembly space for ground floor. | $9,999 |
| Jan 5, 2010 | Never finaled issued Jan 2010, no final | 340 Pine St | C B F Inc | 5th floor-life safety system modifications-1 strobe light (wall mount), 3 horn/strobes (wall mount), 1 remote notification power supply, 1 dual sync moduleDetails
5th floor-life safety system modifications-1 strobe light (wall mount), 3 horn/strobes (wall mount), 1 remote notification power supply, 1 dual sync module | $3,500 |
| Dec 18, 2009 | Never finaled issued Dec 2009, no final | 340 Pine St | Allied Fire Protection | 5th floor. relocate (4) sprinklers.Details
5th floor. relocate (4) sprinklers. | $4,200 |
| Nov 16, 2009 | Never finaled issued Dec 2009, no final | 340 Pine St | office ti on 5th fl. construct 2 offices. replace lights, minor elec, for future work stations. new carpet and paint.Details
office ti on 5th fl. construct 2 offices. replace lights, minor elec, for future work stations. new carpet and paint. | $100,000 | |
| Jun 8, 2007 | Expired or cancelled cancelled Jan 2008 | 340 Pine St | Bay Construction Services Inc | tenant improvement to (e) office space. remove non-structural interior partitions, construct new non-structural partitions, add new electrical for furniture systems. relocate light fixtures (no increase in lighting wattage)Details
tenant improvement to (e) office space. remove non-structural interior partitions, construct new non-structural partitions, add new electrical for furniture systems. relocate light fixtures (no increase in lighting wattage) | $75,000 |
| Dec 8, 2005 | Never finaled issued Dec 2005, no final | 340 Pine St | Dpw Inc. | install a new spinkler system on 7th floor and mech room/tie-in to extg riser in stairway/extg riserDetails
install a new spinkler system on 7th floor and mech room/tie-in to extg riser in stairway/extg riser | $28,000 |
| Nov 17, 2005 | Never finaled issued Nov 2005, no final | 340 Pine St | Dpw Inc. | install aa new wet sprinkler system for 1st and mezzanine floorsDetails
install aa new wet sprinkler system for 1st and mezzanine floors | $55,000 |
| Oct 6, 2005 | Expired or cancelled expired Oct 2007 | 340 Pine St | Dpw Inc. | extend sprinkler system on 3rd fl and run a new sprinkler system on the 4th floor.Details
extend sprinkler system on 3rd fl and run a new sprinkler system on the 4th floor. | $55,000 |
| Sep 21, 2005 | Completed final sign-off Dec 2005 | 340 Pine St | reconfigure of 2 offices into 1 new office. paint, new carpet. minor relocate of outlets & lightingDetails
reconfigure of 2 offices into 1 new office. paint, new carpet. minor relocate of outlets & lighting | $45,000 | |
| Sep 12, 2005 | Completed final sign-off Dec 2005 | 340 Pine St | interior construction of 2 new, non-rated offices demolition of 2 offices, reconfiguration into 3.Details
interior construction of 2 new, non-rated offices demolition of 2 offices, reconfiguration into 3. | $47,000 | |
| May 19, 2005 | Never finaled issued May 2005, no final | 340 Pine St | street spaceDetails
street space | ||
| Jul 30, 2004 | Completed final sign-off Sep 2004 | 340 Pine St | Dpr Construction Inc | remodel of existing toilets for compliance electrical plumbing and finishes barrier removal workDetails
remodel of existing toilets for compliance electrical plumbing and finishes barrier removal work | $85,000 |
| Jul 28, 2004 | Completed final sign-off Sep 2004 | 340 Pine St | Dpr Construction Inc | oti-2 6/f el, meDetails
oti-2 6/f el, me | $85,000 |
| Jul 15, 2004 | Completed final sign-off Sep 2004 | 340 Pine St | Dpw Inc. | ti sprinkler work on 6th flr only for new ceiling and wall layoutDetails
ti sprinkler work on 6th flr only for new ceiling and wall layout | $6,000 |
| Jun 30, 2004 | Completed final sign-off Sep 2004 | 340 Pine St | oti-1,6th/fl-el, me,ls, sp.Details
oti-1,6th/fl-el, me,ls, sp. | $210,000 | |
| May 26, 2004 | Completed final sign-off Sep 2004 | 340 Pine St | Dpw Inc. | fully sprinkler 6th floor only tie into existing supply in stairway.Details
fully sprinkler 6th floor only tie into existing supply in stairway. | $25,000 |
| May 3, 2004 | Completed final sign-off Sep 2004 | 340 Pine St | Dpw Inc. | fully sprinkle entire 5th floor & make tie-in to existing riser in stairs.Details
fully sprinkle entire 5th floor & make tie-in to existing riser in stairs. | $20,000 |
| Apr 26, 2004 | Expired or cancelled expired Nov 2005 | 340 Pine St | Dpw Inc. | replace existing non working fire pump with new fire pump to match existing. new pump bipass and bacDetails
replace existing non working fire pump with new fire pump to match existing. new pump bipass and bac | $25,000 |
| Nov 12, 2002 | Expired or cancelled expired Mar 2005 | 340 Pine St | oti-1 3rd floor, el, me, ls, spDetails
oti-1 3rd floor, el, me, ls, sp | $17,000 | |
| May 14, 2001 | Expired or cancelled expired Nov 2001 | 340 Pine St | South Bay Construction | oti-1 4th floor, el, me, lsDetails
oti-1 4th floor, el, me, ls | $18,700 |
| May 14, 2001 | Expired or cancelled cancelled Mar 2002 | 340 Pine St | South Bay Construction | oti-2 4th floor, elDetails
oti-2 4th floor, el | $4,000 |
| May 14, 2001 | Expired or cancelled expired Sep 2001 | 340 Pine St | South Bay Construction | interior non-structural demolition only under this permit #401/404/405Details
interior non-structural demolition only under this permit #401/404/405 | $4,000 |
| Jan 19, 2001 | Expired or cancelled expired Jan 2002 | 340 Pine St | Decker Electric Co Inc Electrical Contra | install new fire alarm system, monitor new fire pump, remove (e) fire alarm systemDetails
install new fire alarm system, monitor new fire pump, remove (e) fire alarm system | $75,000 |
| Jan 17, 2001 | Expired or cancelled cancelled Oct 2003 | 340 Pine St | Dpw Inc. | install new backflow prevention & fire pump per plan. (e) fire pump to be removed from basementDetails
install new backflow prevention & fire pump per plan. (e) fire pump to be removed from basement | $21,500 |
| Nov 29, 2000 | Expired or cancelled expired Jun 2001 | 340 Pine St | Dpw Inc. | partial sprinkler system on 3rd flDetails
partial sprinkler system on 3rd fl | $7,100 |
| Oct 18, 2000 | Expired or cancelled cancelled May 2001 | 340 Pine St | Le Wentz Company And Wentz | oti-1, ground fl, el, me, ls, spDetails
oti-1, ground fl, el, me, ls, sp | $85,000 |
| Sep 9, 2000 | Expired or cancelled expired Sep 2001 | 340 Pine St | tenant improvement remove (e) walls construct new walls provide new doors & lightingDetails
tenant improvement remove (e) walls construct new walls provide new doors & lighting | $100,000 | |
| Aug 8, 2000 | Expired or cancelled expired Feb 2001 | 340 Pine St | street space useDetails
street space use | ||
| Apr 17, 2000 | Expired or cancelled expired Sep 2000 | 340 Pine St | Plant Construction Co, Lp | oti-2 el 6th floorDetails
oti-2 el 6th floor | $1,620 |
| Apr 17, 2000 | Completed final sign-off May 2000 | 340 Pine St | Fire-Matic Systems Inc | relocate 2 fire sprinklers, add 1 fire sprinklerDetails
relocate 2 fire sprinklers, add 1 fire sprinkler | $1,500 |
| Apr 17, 2000 | Expired or cancelled expired May 2001 | 340 Pine St | Plant Construction Co, Lp | oti-1 6th floor el, me, l/sDetails
oti-1 6th floor el, me, l/s | $33,580 |
| Feb 24, 2000 | Completed final sign-off May 2000 | 340 Pine St | South Bay Construction | oti 1 me l/s basementDetails
oti 1 me l/s basement | $55,000 |