Wright Sherman
- Listed as
- architect
- Firm
- Wrns Studio
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Oct 2025
23 permits since 2000 (architect on 23 permits): 19 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 9, 2025 | In progress issued Jan 2026 | 1487 Sacramento St | new awning replacement existing.Details
new awning replacement existing. | $7,000 | |
| Oct 9, 2025 | Completed final sign-off Jan 2026 | 20 Mallorca Wy | Tritec Construction Co Inc--See Notes, King Son Construction Co Llc | new door from (e) lobby to (e) garage. new washer and dryer in (e) garage.Details
new door from (e) lobby to (e) garage. new washer and dryer in (e) garage. | $3,000 |
| Sep 15, 2025 | Completed final sign-off Mar 2026 | 1487 Sacramento St | King Son Construction Co Llc | unit #10: interior improvements. removal of interior walls for reconfiguration of (e) spaces (bath & kitchen). no exterior changes, no change of use or number of bedrooms.Details
unit #10: interior improvements. removal of interior walls for reconfiguration of (e) spaces (bath & kitchen). no exterior changes, no change of use or number of bedrooms. | $30,000 |
| May 8, 2025 | Completed final sign-off Mar 2026 | 1487 Sacramento St | King Son Construction Co Llc | ground floor - creation of 4 storage rooms and laundry area for resident apartments use only. 2/f - remodel of unit # 1 for larger bath and kitchen.Details
ground floor - creation of 4 storage rooms and laundry area for resident apartments use only. 2/f - remodel of unit # 1 for larger bath and kitchen. | $18,000 |
| Nov 19, 2024 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | revision to pa 202210265236 & 202301301009 chane to special inspection checklistDetails
revision to pa 202210265236 & 202301301009 chane to special inspection checklist | |
| Aug 5, 2024 | Completed final sign-off Jun 2025 | 550 Terry A Francois Bl | Truebeck Construction | the entire north tower roofing will be removed down to the slab and replaced. the existing rooftop ahu will be removed and replaced inkind. a new door will be added as an exit for the 4th floor terrace.Details
the entire north tower roofing will be removed down to the slab and replaced. the existing rooftop ahu will be removed and replaced inkind. a new door will be added as an exit for the 4th floor terrace. | $3,238,165 |
| Jul 26, 2024 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | Truebeck Construction | revision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original designDetails
revision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design | |
| Jun 13, 2024 | Completed final sign-off Nov 2025 | 165 Grove St | Cahill Contractors Llc. | interior construction within a storefront space for a non profit community center, including offices, restroom, kitchenette, and a community space. construction includes partitions, ceilings, and lightingDetails
interior construction within a storefront space for a non profit community center, including offices, restroom, kitchenette, and a community space. construction includes partitions, ceilings, and lighting | $308,000 |
| May 6, 2024 | Completed final sign-off Apr 2025 | 668 Castro St | rebuilding (e) exterior staircase with different configuration.Details
rebuilding (e) exterior staircase with different configuration. | $30,000 | |
| May 6, 2024 | Completed final sign-off Aug 2025 | 668 Castro St | Eco Logic Construction & Design Inc. | interior remodel for in kind bathrooms & bedroom. wall removal at living room.Details
interior remodel for in kind bathrooms & bedroom. wall removal at living room. | $90,000 |
| Mar 29, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | Truebeck Construction | 1/fl-interior soft demo per ab:017 level 1 removal of architectural and mep as noted on drawings. all demolished mep will be safed back to risers. no occupancy until ti is completed per ab017.Details
1/fl-interior soft demo per ab:017 level 1 removal of architectural and mep as noted on drawings. all demolished mep will be safed back to risers. no occupancy until ti is completed per ab017. | $20,000 |
| Oct 2, 2019 | Never finaled issued Dec 2019, no final | 650 Townsend St | Hathaway Dinwiddie Co. | assembly permit revision, update furniture plans, revise egress plan, change atrium assembly use to a-2 space ref pa 2018-0530-0538, 2018-0530-0539Details
assembly permit revision, update furniture plans, revise egress plan, change atrium assembly use to a-2 space ref pa 2018-0530-0538, 2018-0530-0539 | |
| Apr 24, 2019 | Completed final sign-off Oct 2019 | 999 Brannan St | Novo Construction Inc | modification to the existing building entry doors.Details
modification to the existing building entry doors. | $64,200 |
| Nov 9, 2018 | Completed final sign-off Oct 2020 | 650 Townsend St | Hathaway Dinwiddie Co. | unstrut structural suppot for theatre equipment in atrium. ref pa #201805300538 for approved interior work.Details
unstrut structural suppot for theatre equipment in atrium. ref pa #201805300538 for approved interior work. | $65,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2020 | 2607 Post St | Archeon Construction | rear portion of (e) building to be repaired with (n) siding. remodeled interior for (e) kitchen, (n) relocated bathroom, (n) doors at rear. removal of (e) bedroom.Details
rear portion of (e) building to be repaired with (n) siding. remodeled interior for (e) kitchen, (n) relocated bathroom, (n) doors at rear. removal of (e) bedroom. | $5,000 |
| Mar 7, 2018 | Never finaled issued Jun 2018, no final | 650 Townsend St | Hathaway Dinwiddie Co. | modification to a portion of the north (bluxome street) facade for (n) entry doors, windows & ada access ramp. (n) interior stairs, non load bearing partiions & inteiror finishes. no change of use. ** maher: n/a **Details
modification to a portion of the north (bluxome street) facade for (n) entry doors, windows & ada access ramp. (n) interior stairs, non load bearing partiions & inteiror finishes. no change of use. ** maher: n/a ** | $350,000 |
| Aug 11, 2017 | Completed final sign-off Dec 2021 | 1253 Guerrero St | Mcmahon Construction | reary yard addition. 2 story tall for remodel kitchen & new deck.Details
reary yard addition. 2 story tall for remodel kitchen & new deck. | $180,000 |
| Aug 11, 2015 | Completed final sign-off Apr 2016 | 1315 07th Av | Top Line Engineers Inc | accomodate duct system for suspended ceiling including new ducts on existing furnace. ref to ti #201507242403. n/a maher ordinanceDetails
accomodate duct system for suspended ceiling including new ducts on existing furnace. ref to ti #201507242403. n/a maher ordinance | $3,000 |
| Jul 24, 2015 | Completed final sign-off Apr 2016 | 1315 07th Av | Top Line Engineers Inc | conversion of (e) nail spa to office, work done at ground & lower level, new office partitions, no mech. or plumbing. no work at front facade. compliance with maher ordinance no 155-13 not required.Details
conversion of (e) nail spa to office, work done at ground & lower level, new office partitions, no mech. or plumbing. no work at front facade. compliance with maher ordinance no 155-13 not required. | $45,000 |
| Apr 10, 2015 | Completed final sign-off Aug 2015 | 1012 Noe St | bathroom remodel with infill of space enclosed by 3 walls, floor & ceiling.Details
bathroom remodel with infill of space enclosed by 3 walls, floor & ceiling. | $5,500 | |
| Dec 3, 2012 | Completed final sign-off Dec 2014 | 1014 Noe St | expansion & remodel of (e) upper level of (e) 2 unit res'd. (e) upper level consists of 2 bedroom + 1 bath. addition will provide 1 additional bedroom. new stair to connect main and upper level.Details
expansion & remodel of (e) upper level of (e) 2 unit res'd. (e) upper level consists of 2 bedroom + 1 bath. addition will provide 1 additional bedroom. new stair to connect main and upper level. | $80,000 | |
| Aug 31, 2011 | Completed final sign-off Oct 2013 | 668 Castro St | kitchen extension @ side / rear. 1 story high. lowerd new floor @ portion of rear @ garage leve.Details
kitchen extension @ side / rear. 1 story high. lowerd new floor @ portion of rear @ garage leve. | $120,000 | |
| Jul 21, 2011 | Expired or cancelled cancelled Nov 2024 | 668 Castro St | kitchen extension @ side-rear for new stair to garage level. lowered new floor @ rear of garage level for new bedroom and bath.Details
kitchen extension @ side-rear for new stair to garage level. lowered new floor @ rear of garage level for new bedroom and bath. | $200,000 |