Brendan Lalor Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Aug 2026
- Last 24 months
- 7 permits filed
90 permits since 2000: 72 completed, 6 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1815 29th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $22,000 |
| Apr 29, 2026 | In progress issued Jul 2026 | 2428 Union St | revise pa# 202506239264 to document the widening of the previously approved roof deck, layout of various rooms on floors 1 & 2, addition of a sauna room to the ground floor habitable space, and structural framing to accomodate those revisions.Details
revise pa# 202506239264 to document the widening of the previously approved roof deck, layout of various rooms on floors 1 & 2, addition of a sauna room to the ground floor habitable space, and structural framing to accomodate those revisions. | $55,000 |
| Feb 13, 2026 | Completed final sign-off May 2026 | 520 Monterey Bl | stair removal and repair at front entry due to dry rot, less than 50% repair and in-kind.Details
stair removal and repair at front entry due to dry rot, less than 50% repair and in-kind. | $20,000 |
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 520 Monterey Bl | remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows.Details
remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows. | $60,000 |
| Jun 23, 2025 | In progress issued Oct 2025 | 2428 Union St | revision 202409261741- renovation of north unit. to inlcude (n) stair and roof deckDetails
revision 202409261741- renovation of north unit. to inlcude (n) stair and roof deck | $175,000 |
| Jan 21, 2025 | Completed final sign-off Apr 2025 | 656 Arguello Bl | repair stucco dryrot in kind. not visible from streetDetails
repair stucco dryrot in kind. not visible from street | $6,000 |
| Dec 5, 2024 | Completed final sign-off May 2025 | 1345 16th Av | unit #6: (1) bathroom remodel in kind.Details
unit #6: (1) bathroom remodel in kind. | $8,000 |
| Sep 26, 2024 | In progress issued May 2025 | 2428 Union St | unit 2- (e) garage celing height to be increased as per structural drawings/caluclations. proposed north (back) elevation to include (n) garage door and (n) swing outdoor. no work in front.Details
unit 2- (e) garage celing height to be increased as per structural drawings/caluclations. proposed north (back) elevation to include (n) garage door and (n) swing outdoor. no work in front. | $100,000 |
| Aug 1, 2024 | In progress issued Aug 2024 | 1901 14th Av | replace 13 windows in kind. new windows to be milgard ultra series fiberglass windows. replace in same openings.Details
replace 13 windows in kind. new windows to be milgard ultra series fiberglass windows. replace in same openings. | $20,000 |
| Jul 29, 2024 | In progress issued Sep 2024 | 345 Taraval St | change of use from speciality grocery to full restaurant. no construction under this permit.Details
change of use from speciality grocery to full restaurant. no construction under this permit. | |
| Jun 5, 2024 | Expired or cancelled cancelled Jul 2024 | 345 Taraval St | change of use from specialty grocery to a limited restaurant. no work on this permit. all work completed under 202209263138, 202305157769Details
change of use from specialty grocery to a limited restaurant. no work on this permit. all work completed under 202209263138, 202305157769 | |
| May 9, 2024 | Completed final sign-off Jul 2024 | 374 Laidley St | replace in kind- (5) windows (1) patio door @ front facade. * marvin ultimate aluminum clad wood windows. same size, same location, max u factor 0.30Details
replace in kind- (5) windows (1) patio door @ front facade. * marvin ultimate aluminum clad wood windows. same size, same location, max u factor 0.30 | $35,000 |
| Feb 2, 2024 | Completed final sign-off May 2025 | 44 Sequoia Wy | revision to pa# 202010287615, removal of windows @ s wall, change of exterior door @ bedroom #6. removal of decorative trellises. change of window material.Details
revision to pa# 202010287615, removal of windows @ s wall, change of exterior door @ bedroom #6. removal of decorative trellises. change of window material. | |
| Dec 8, 2023 | Completed final sign-off Jan 2025 | 361 Oak St | alteration to (e) sfr: partial foundation improvement along west (18ft), add 1st flr wet bar, 2nd flr bath, no exterior alterations except removal of internal chimney.cDetails
alteration to (e) sfr: partial foundation improvement along west (18ft), add 1st flr wet bar, 2nd flr bath, no exterior alterations except removal of internal chimney.c | $43,000 |
| May 15, 2023 | Completed final sign-off Sep 2023 | 345 Taraval St | revision to pa 2022-0926-3138. new framed in stair and landing for (e) pbx & internet roomDetails
revision to pa 2022-0926-3138. new framed in stair and landing for (e) pbx & internet room | $5,000 |
| Feb 27, 2023 | Completed final sign-off May 2023 | 1351 08th Av | replacement in kind of damaged siding to prevent water intrusion. no siding is street facing or street visible.Details
replacement in kind of damaged siding to prevent water intrusion. no siding is street facing or street visible. | $1,500 |
| Oct 21, 2022 | Completed final sign-off Aug 2023 | 1734 Greenwich St | soft story upgarde of 1st flr per ab-107, chapter 4d of sf building code 2019 and chapter 34 of california building code 2019.Details
soft story upgarde of 1st flr per ab-107, chapter 4d of sf building code 2019 and chapter 34 of california building code 2019. | $40,000 |
| Sep 26, 2022 | Completed final sign-off Sep 2023 | 345 Taraval St | tenant improvement for remodel of (e) specialty grocery store. update appliances & equipment. ada upgrades. refinish & repaint (e) surfaces & floors.Details
tenant improvement for remodel of (e) specialty grocery store. update appliances & equipment. ada upgrades. refinish & repaint (e) surfaces & floors. | $50,000 |
| Jul 26, 2022 | Completed final sign-off Aug 2023 | 1990 Green St | unit 105: kitchen, main bath, and guest bath remodel.Details
unit 105: kitchen, main bath, and guest bath remodel. | $200,000 |
| Mar 1, 2022 | Completed final sign-off Sep 2022 | 81 Mercedes Wy | revision to pa# 201908290201. to show bathroom being remodeled on the basement level.Details
revision to pa# 201908290201. to show bathroom being remodeled on the basement level. | $20,000 |
| Nov 25, 2020 | Completed final sign-off Dec 2021 | 361 Oak St | replace 8 windows in rear 2nd floor custom wood in like kind. m<0.35 not visible from street.Details
replace 8 windows in rear 2nd floor custom wood in like kind. m<0.35 not visible from street. | $4,000 |
| Oct 28, 2020 | Completed final sign-off May 2025 | 44 Sequoia Wy | third floor addition; interior remodeling at the existing ground floor and second floor; widening of the garage door; window and exterior door changes at the existing two floors; removal of the existing rear decks, stair, and gazebo; and addition of a rear yard stair to the second floor.Details
third floor addition; interior remodeling at the existing ground floor and second floor; widening of the garage door; window and exterior door changes at the existing two floors; removal of the existing rear decks, stair, and gazebo; and addition of a rear yard stair to the second floor. | $450,000 |
| Oct 6, 2020 | Completed final sign-off Jun 2023 | 816 Taraval St | construct two adu units per sf ordinance 162-16.2. alterations to (e) unit 101.3. construct two storage lofts for existing commercial spaces.Details
construct two adu units per sf ordinance 162-16.2. alterations to (e) unit 101.3. construct two storage lofts for existing commercial spaces. | $140,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2021 | 1640 Haight St | to compy w/ mandatory disability access improvement program category checklist compliance form. primary entrance compliance sht a7.02 attached. upgrade bldg entry/exit doorway, toilet rm, add (n) toilet rm, add (n) inclinded platform lift at int stair, mod non-structural soffit over stair.Details
to compy w/ mandatory disability access improvement program category checklist compliance form. primary entrance compliance sht a7.02 attached. upgrade bldg entry/exit doorway, toilet rm, add (n) toilet rm, add (n) inclinded platform lift at int stair, mod non-structural soffit over stair. | $40,000 |
| Jul 29, 2020 | Never finaled issued Jul 2020, no final | 1000 Sutter St | to obtain final inspection for work approved under pa# 8614134 and 8309817 for final inspectionDetails
to obtain final inspection for work approved under pa# 8614134 and 8309817 for final inspection | |
| Jul 7, 2020 | Completed final sign-off Aug 2020 | 1000 Sutter St | add smoke doors to existing elevators, barrier removal work.Details
add smoke doors to existing elevators, barrier removal work. | $8,800 |
| Nov 20, 2019 | Never finaled issued Feb 2020, no final | 710 43rd Av | street spaceDetails
street space | |
| Oct 10, 2019 | Completed final sign-off Jan 2020 | 150 San Aleso Av | remodel kitchen in-kind. replace two kitchen and four dining room windows w/all wood marvin ultimate double-hung windows. no other work.Details
remodel kitchen in-kind. replace two kitchen and four dining room windows w/all wood marvin ultimate double-hung windows. no other work. | $55,000 |
| Aug 29, 2019 | Completed final sign-off Sep 2022 | 81 Mercedes Wy | level 1: additon of 158 sq ft, remodel kitchen & relocate power room. new deck along rear,new door & windows. level 2: relocate laundry, new deck above addition area, new doors ondto deck.Details
level 1: additon of 158 sq ft, remodel kitchen & relocate power room. new deck along rear,new door & windows. level 2: relocate laundry, new deck above addition area, new doors ondto deck. | $70,000 |
| Jul 10, 2019 | Completed final sign-off Oct 2019 | 361 Oak St | replace wood siding on west side of buildig, not to exceed 40 square feet with beveled channel in like kind to match existing material, profile, dimension, and finish.Details
replace wood siding on west side of buildig, not to exceed 40 square feet with beveled channel in like kind to match existing material, profile, dimension, and finish. | $2,000 |
| Jun 21, 2019 | Completed final sign-off Aug 2020 | 332 College Av | excavation and interior remodel at gr fl to add living space, infill addition at ground fl under e bay window, trimming of bottom of e kitchen bay window for headroom at proposed exit path, replacement interior stairway, minor interior remodeling at 2nd fl, new windows and exterio doors at sidesDetails
excavation and interior remodel at gr fl to add living space, infill addition at ground fl under e bay window, trimming of bottom of e kitchen bay window for headroom at proposed exit path, replacement interior stairway, minor interior remodeling at 2nd fl, new windows and exterio doors at sides | $290,000 |
| Apr 24, 2019 | Never finaled issued Aug 2019, no final | 1466 38th Av | change of use and occupancy from r-3 to group e day care occupancy in order to expand (e) large family day care to a commercial child care facility/licenseDetails
change of use and occupancy from r-3 to group e day care occupancy in order to expand (e) large family day care to a commercial child care facility/license | $116,000 |
| Nov 15, 2018 | Expired or cancelled withdrawn Feb 2020 | 19 Cityview Wy | rear addition with roof & spiral stair to rear yard. interior remodeling at both floors with (n) side windows and door. addition of one skylight.Details
rear addition with roof & spiral stair to rear yard. interior remodeling at both floors with (n) side windows and door. addition of one skylight. | $305,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2023 | 816 Taraval St | soft story seismic retrofit sf ord 66-13. sfbc chapter 4d engineering criteria 2012 iebc appx a4 ( redisdential) comercial pa # 201810102830Details
soft story seismic retrofit sf ord 66-13. sfbc chapter 4d engineering criteria 2012 iebc appx a4 ( redisdential) comercial pa # 201810102830 | $45,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2023 | 816 Taraval St | mandatory ada entrance & restroom upgrade(commercial). retrofit 1st flr basement for future ti. mep/fire under separate permitDetails
mandatory ada entrance & restroom upgrade(commercial). retrofit 1st flr basement for future ti. mep/fire under separate permit | $10,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2023 | 816 Taraval St | mandatory soft story seismic retrofit sf ord 66-13 soft story retrofit sfbc chapter 4d engineering criteria 2012 iebc appx a4 comercial residential pa # 201810102829Details
mandatory soft story seismic retrofit sf ord 66-13 soft story retrofit sfbc chapter 4d engineering criteria 2012 iebc appx a4 comercial residential pa # 201810102829 | $50,000 |
| Aug 31, 2018 | Completed final sign-off Oct 2020 | 2 Maynard St | soft story upgrade of first floor per ab106, 107, chapter 34 of cbc 2016 and chapter 4d of sfbc 2016 (residential)Details
soft story upgrade of first floor per ab106, 107, chapter 34 of cbc 2016 and chapter 4d of sfbc 2016 (residential) | $54,000 |
| Aug 31, 2018 | Completed final sign-off Oct 2020 | 2 Maynard St | soft story upgrade of first floor per ab106, 107, chapter 34 of cbc 2016 and chapter 4d of sfbc 2016 (commercial - restaurant)Details
soft story upgrade of first floor per ab106, 107, chapter 34 of cbc 2016 and chapter 4d of sfbc 2016 (commercial - restaurant) | $8,000 |
| May 29, 2018 | Completed final sign-off Oct 2019 | 3702 22nd St | interior remodel of 2 family dwelling, replacemenet of selected windows and doors, add 3 dormers. interior work to include remodel/replacement of 2 kitchens, 3 baths, and addition of 1 (n) bath. (2) visible windows ( sidelite/1 casement) alum clad, (10) non-visible fiberglass, (1) alum clad doorDetails
interior remodel of 2 family dwelling, replacemenet of selected windows and doors, add 3 dormers. interior work to include remodel/replacement of 2 kitchens, 3 baths, and addition of 1 (n) bath. (2) visible windows ( sidelite/1 casement) alum clad, (10) non-visible fiberglass, (1) alum clad door | $185,000 |
| Feb 28, 2018 | Completed final sign-off Oct 2018 | 140 El Verano Wy | replace 10 front and 3 side windows with marvin wood ultimate divided light. repair balcony in-kind less than 50%.Details
replace 10 front and 3 side windows with marvin wood ultimate divided light. repair balcony in-kind less than 50%. | $10,000 |
| Feb 28, 2018 | Completed final sign-off Oct 2018 | 17 Iris Av | remove and replace dryrot stair less than 50% stair at front repair. terrazzo to terrazzo.Details
remove and replace dryrot stair less than 50% stair at front repair. terrazzo to terrazzo. | $8,000 |
| Aug 18, 2017 | Completed final sign-off Jan 2018 | 681 Castro St | interior remodel of existing kitchen & 1 (e) bathroom & convert half bath to full bathroom. add entry closet at level 1.Details
interior remodel of existing kitchen & 1 (e) bathroom & convert half bath to full bathroom. add entry closet at level 1. | $65,000 |
| May 5, 2017 | Completed final sign-off Jun 2017 | 221 08th Av | remodel bathroom in kind. no changes to wall locations.Details
remodel bathroom in kind. no changes to wall locations. | $8,000 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 2035 10th Av | kitchen remodel in kind, bathroom remodel in kind. not moving walls, replace in same location.Details
kitchen remodel in kind, bathroom remodel in kind. not moving walls, replace in same location. | $37,000 |
| Sep 15, 2016 | Completed final sign-off Sep 2016 | 221 08th Av | replace 6 front windows on the upper floor. replace in kind. new windows to be wood clad.Details
replace 6 front windows on the upper floor. replace in kind. new windows to be wood clad. | $5,000 |
| Jun 13, 2016 | Completed final sign-off Jan 2018 | 698 Belvedere St | rear addition and interior remodel to an existing 2 story residence, work includes remodeled kitchen, bathroom, new closet and roof deck over addition.Details
rear addition and interior remodel to an existing 2 story residence, work includes remodeled kitchen, bathroom, new closet and roof deck over addition. | $150,000 |
| Jan 4, 2016 | Completed final sign-off Jan 2018 | 250 09th Av | remodel of (e) kitchen, dining & breakfast room spaces, new deck with crawl space, voluntary strengthening, new window & exterior paint.Details
remodel of (e) kitchen, dining & breakfast room spaces, new deck with crawl space, voluntary strengthening, new window & exterior paint. | $140,000 |
| Sep 28, 2015 | Completed final sign-off Sep 2016 | 125 Vicksburg St | dry rot repair in kind in front of house 100 sq. ft.Details
dry rot repair in kind in front of house 100 sq. ft. | $1,500 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 2179 16th Av | partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bathDetails
partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bath | $180,000 |
| Mar 16, 2015 | Completed final sign-off May 2015 | 91 Ord St | common area- in kind replacement of non-conforming stairs in light well. stair is second means of egress.Details
common area- in kind replacement of non-conforming stairs in light well. stair is second means of egress. | $5,000 |
| Mar 5, 2015 | Completed final sign-off Apr 2015 | 350 Santa Ana Av | repair dry rot on rear of the house, lath and replaster. repair in-kind entire rear face.Details
repair dry rot on rear of the house, lath and replaster. repair in-kind entire rear face. | $10,000 |
| Feb 26, 2015 | Completed final sign-off Jun 2015 | 67 Rosewood Dr | replace 28 windows in-kind with marvin wood windows. repair dry rot in front porch less than 50%. windows in bay to be 15-light sdl casement, other sdl at front. wood railing to remain. u=0.32 max.Details
replace 28 windows in-kind with marvin wood windows. repair dry rot in front porch less than 50%. windows in bay to be 15-light sdl casement, other sdl at front. wood railing to remain. u=0.32 max. | $20,000 |
| Oct 6, 2014 | Completed final sign-off Apr 2015 | 3625 California St | office t.i. on ground floor. change dentist office to an attorneys office. add new handicaped bathroom, remodel lunch room, change lighting to led. move partition walls at two rear offices and add internet and plug outlets. keep (e) hvac (no change).Details
office t.i. on ground floor. change dentist office to an attorneys office. add new handicaped bathroom, remodel lunch room, change lighting to led. move partition walls at two rear offices and add internet and plug outlets. keep (e) hvac (no change). | $100,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 3095 24th Av | replace 13 windows w/marvin wood ultrex windows. kitchen remodel in kind. all windows to be casement.Details
replace 13 windows w/marvin wood ultrex windows. kitchen remodel in kind. all windows to be casement. | $25,000 |
| May 16, 2014 | Completed final sign-off Mar 2017 | 138 Parker Av | alterations & expansion to 1st & 2nd & 3rd floor of subject property. 1st fl: add media room. 2nd fl: add breakfast room & deck. 3rd fl: add two bathrooms, breakfast roomand closet. horizontal expansion.Details
alterations & expansion to 1st & 2nd & 3rd floor of subject property. 1st fl: add media room. 2nd fl: add breakfast room & deck. 3rd fl: add two bathrooms, breakfast roomand closet. horizontal expansion. | $250,000 |
| Apr 2, 2014 | Expired or cancelled expired Mar 2016 | 668 Elizabeth St | new bathroom in existing residential condo unit.Details
new bathroom in existing residential condo unit. | $15,000 |
| Feb 11, 2014 | Never finaled issued Feb 2014, no final | 2401 Moraga St | revision to pa#2011-10-21-7311 reduces the rear yard addition @ ground level & removes addition @ 2nd & 3rd levels.Details
revision to pa#2011-10-21-7311 reduces the rear yard addition @ ground level & removes addition @ 2nd & 3rd levels. | |
| Aug 9, 2013 | Completed final sign-off Jan 2014 | 1512 36th Av | lower bathroom remodel in kind, repl 3 alum windows and 1 door in rear of house, no change on walls, not visible from streetDetails
lower bathroom remodel in kind, repl 3 alum windows and 1 door in rear of house, no change on walls, not visible from street | $10,000 |
| Aug 9, 2013 | Completed final sign-off Nov 2013 | 140 El Verano Wy | kitchen remodel in kind, replace 2 windows and 1 door in rear of house, not visible from street, no change on wallsDetails
kitchen remodel in kind, replace 2 windows and 1 door in rear of house, not visible from street, no change on walls | $25,000 |
| Aug 9, 2013 | Completed final sign-off Jan 2014 | 333 Santa Ana Av | kitchen remodel in kind, 2 bathrooms remodel in kind, minor dry rot repairs at various areas around house, no change on wallsDetails
kitchen remodel in kind, 2 bathrooms remodel in kind, minor dry rot repairs at various areas around house, no change on walls | $105,000 |
| Apr 3, 2013 | Completed final sign-off Jul 2013 | 3034 Steiner St | remodel kitchen & bath - countertops, cabinets, bathtub & sink.Details
remodel kitchen & bath - countertops, cabinets, bathtub & sink. | $25,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 3036 Steiner St | remodel kitchen and bath in kind. no structural workDetails
remodel kitchen and bath in kind. no structural work | $20,000 |
| Mar 8, 2013 | Completed final sign-off Apr 2013 | 734 Madrid St | to clear notice of violation 201263428 repair garage. door in-kind.Details
to clear notice of violation 201263428 repair garage. door in-kind. | $4,000 |
| Feb 19, 2013 | Completed final sign-off Apr 2013 | 312 Mason St | remodel 8 bath rooms in kind.Details
remodel 8 bath rooms in kind. | $80,000 |
| Dec 14, 2012 | Completed final sign-off Mar 2013 | 361 Oak St | interior finishes, new wall opening, new partition(non-load bearing)new gas fireplace, remove extg decommissioned chimney and patch roof to match extg.Details
interior finishes, new wall opening, new partition(non-load bearing)new gas fireplace, remove extg decommissioned chimney and patch roof to match extg. | $50,000 |
| Jun 14, 2012 | Completed final sign-off Nov 2012 | 297 Page St | install new custom hood over countertop of commercial unitDetails
install new custom hood over countertop of commercial unit | $3,200 |
| May 24, 2012 | Completed final sign-off Feb 2013 | 1789 09th Av | replace front windows, 12 windows in kind, repair approx 75 sq.ft. dry rot, repair in kind.Details
replace front windows, 12 windows in kind, repair approx 75 sq.ft. dry rot, repair in kind. | $6,000 |
| May 8, 2012 | Completed final sign-off Mar 2013 | 2 Maynard St | to comply w/complaint #201211141 & 201282359 : create new garbage room & provide venting for washer/dryer. provide venting for garbage room.Details
to comply w/complaint #201211141 & 201282359 : create new garbage room & provide venting for washer/dryer. provide venting for garbage room. | $4,100 |
| Feb 2, 2012 | Completed final sign-off Feb 2012 | 26 Robinson Dr | dry rot repair approx 150 sq. ft north corner of bldg.Details
dry rot repair approx 150 sq. ft north corner of bldg. | $4,000 |
| Apr 5, 2011 | Completed final sign-off Jun 2011 | 771 Clayton St | revision to pa #201006094134: comply w/cc-5798 (condo conversion) (n) steel beams to replace existing in (e) garage.Details
revision to pa #201006094134: comply w/cc-5798 (condo conversion) (n) steel beams to replace existing in (e) garage. | $5,000 |
| Nov 18, 2010 | Completed final sign-off Apr 2011 | 17 Iris Av | remodel kitchen in kind approx 15' lin ft counter. replace hood in kind same duct at 2nd flDetails
remodel kitchen in kind approx 15' lin ft counter. replace hood in kind same duct at 2nd fl | $18,000 |
| Aug 10, 2010 | Completed final sign-off Dec 2010 | 220 Beacon St | demo & replace in kind (e) wood entry bridgeDetails
demo & replace in kind (e) wood entry bridge | $11,800 |
| Aug 10, 2010 | Expired or cancelled cancelled Mar 2011 | 334 Richland Av | remodel (e) kitchen & 2-bathrooms.Details
remodel (e) kitchen & 2-bathrooms. | $20,000 |
| Jun 17, 2010 | Never finaled issued Jun 2010, no final | 498 Sanchez St | repl all framing in kind inc (n) 6x8 corner post, inc windows, walls, repl in kind 3 ea alum storefront operable windows, 5 transom windows, repl alum door in kind, repl all detractive trim on exterior of bldg in kindDetails
repl all framing in kind inc (n) 6x8 corner post, inc windows, walls, repl in kind 3 ea alum storefront operable windows, 5 transom windows, repl alum door in kind, repl all detractive trim on exterior of bldg in kind | $50,000 |
| May 4, 2010 | Never finaled issued May 2010, no final | 66 Seal Rock Dr | replace 7 (e) aluminum windows with new aluminum windows in kind, termite repair approx 250 sq ftDetails
replace 7 (e) aluminum windows with new aluminum windows in kind, termite repair approx 250 sq ft | $6,000 |
| Dec 21, 2009 | Never finaled issued Dec 2009, no final | 23 Meadowbrook Dr | bathroom remodel in kind. new tile fixtures. no new lighting. no structural work.Details
bathroom remodel in kind. new tile fixtures. no new lighting. no structural work. | $4,000 |
| Oct 6, 2009 | Completed final sign-off Dec 2009 | 2522 17th Av | remodel bathroom in kind. replace one kitchen cabinets. replace bathtub vanity, and shower. no lightingDetails
remodel bathroom in kind. replace one kitchen cabinets. replace bathtub vanity, and shower. no lighting | $6,000 |
| Oct 1, 2009 | Completed final sign-off Sep 2010 | 23 Meadowbrook Dr | kitchen remodel in kind (11'x10'). add (n) 5'-1/4"x14 2.oe parallam psl on 2nd floor. remove interior loard bearing wall for new beam. no lighting or mech.Details
kitchen remodel in kind (11'x10'). add (n) 5'-1/4"x14 2.oe parallam psl on 2nd floor. remove interior loard bearing wall for new beam. no lighting or mech. | $12,000 |
| Sep 4, 2009 | Completed final sign-off Dec 2009 | 2414 18th St | replace 1 aluminum frame window at front facade to match existing at 2412-14 18th st (easternmost building) +Details
replace 1 aluminum frame window at front facade to match existing at 2412-14 18th st (easternmost building) + | $700 |
| Jul 15, 2009 | Completed final sign-off Jan 2010 | 285 04th Av | remodel kitchen and bath approx 24 lin ft counter tops in kind, new fluorescent light fixtures, replace hood in kindDetails
remodel kitchen and bath approx 24 lin ft counter tops in kind, new fluorescent light fixtures, replace hood in kind | $30,000 |
| Jul 15, 2009 | Completed final sign-off Sep 2009 | 120 Corona St | remodel kitchen in kind approx 16' of new counter new florescent light fixtures. (e) hood in kind.Details
remodel kitchen in kind approx 16' of new counter new florescent light fixtures. (e) hood in kind. | $20,000 |
| Feb 27, 2009 | Completed final sign-off May 2009 | 1907 Funston Av | remodel (e) kitchen approx 12 ln ft of counters. remodel (e) 2 bathrooms.Details
remodel (e) kitchen approx 12 ln ft of counters. remodel (e) 2 bathrooms. | $38,600 |
| Jun 16, 2008 | Completed final sign-off Sep 2010 | 150 Chapman St | 3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck.Details
3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck. | $350,000 |
| Dec 2, 2004 | Completed final sign-off Apr 2005 | 134 Taraval St | remove and replace stucco on front door to dry rot. replace esisting windows with new vinyl. 20 windDetails
remove and replace stucco on front door to dry rot. replace esisting windows with new vinyl. 20 wind | $15,000 |
| Jun 28, 2004 | Completed final sign-off Aug 2004 | 177 Idora Av | remove stucco and repair sheathing., replace stucco in kind work is due to dryrot. work is on southDetails
remove stucco and repair sheathing., replace stucco in kind work is due to dryrot. work is on south | $2,000 |
| Feb 18, 2003 | Completed final sign-off May 2003 | 51 Miramar Av | repair dry rot on front stairs, repair in like kindDetails
repair dry rot on front stairs, repair in like kind | $6,000 |
| Feb 18, 2003 | Completed final sign-off Jul 2003 | 1109 Judah St | underpin (e) foundationDetails
underpin (e) foundation | $3,000 |
| Jul 3, 2002 | Expired or cancelled cancelled Jul 2003 | 617 Gennessee St | underpin foundation on south wall per planDetails
underpin foundation on south wall per plan | $5,000 |
| Jul 28, 2000 | Completed final sign-off Aug 2000 | 1180 Clayton St | as built rivisiont to #9903079 as pre/plansDetails
as built rivisiont to #9903079 as pre/plans | |
| Jul 25, 2000 | Completed final sign-off Oct 2015 | 367 Delano Av | addition of bdrm/bthrm/lndry room to ground floor of dwelling unitDetails
addition of bdrm/bthrm/lndry room to ground floor of dwelling unit | $30,000 |