Back to bathroom remodel contractors
Brendan Lalor Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Aug 2026
- Last 24 months
- 7 permits filed
90 permits since 2000: 72 completed, 6 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 22 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1815 29th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $22,000 |
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 520 Monterey Bl | remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows.Details
remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows. | $60,000 |
| Dec 5, 2024 | Completed final sign-off May 2025 | 1345 16th Av | unit #6: (1) bathroom remodel in kind.Details
unit #6: (1) bathroom remodel in kind. | $8,000 |
| Dec 8, 2023 | Completed final sign-off Jan 2025 | 361 Oak St | alteration to (e) sfr: partial foundation improvement along west (18ft), add 1st flr wet bar, 2nd flr bath, no exterior alterations except removal of internal chimney.cDetails
alteration to (e) sfr: partial foundation improvement along west (18ft), add 1st flr wet bar, 2nd flr bath, no exterior alterations except removal of internal chimney.c | $43,000 |
| Jul 26, 2022 | Completed final sign-off Aug 2023 | 1990 Green St | unit 105: kitchen, main bath, and guest bath remodel.Details
unit 105: kitchen, main bath, and guest bath remodel. | $200,000 |
| Mar 1, 2022 | Completed final sign-off Sep 2022 | 81 Mercedes Wy | revision to pa# 201908290201. to show bathroom being remodeled on the basement level.Details
revision to pa# 201908290201. to show bathroom being remodeled on the basement level. | $20,000 |
| May 29, 2018 | Completed final sign-off Oct 2019 | 3702 22nd St | interior remodel of 2 family dwelling, replacemenet of selected windows and doors, add 3 dormers. interior work to include remodel/replacement of 2 kitchens, 3 baths, and addition of 1 (n) bath. (2) visible windows ( sidelite/1 casement) alum clad, (10) non-visible fiberglass, (1) alum clad doorDetails
interior remodel of 2 family dwelling, replacemenet of selected windows and doors, add 3 dormers. interior work to include remodel/replacement of 2 kitchens, 3 baths, and addition of 1 (n) bath. (2) visible windows ( sidelite/1 casement) alum clad, (10) non-visible fiberglass, (1) alum clad door | $185,000 |
| Aug 18, 2017 | Completed final sign-off Jan 2018 | 681 Castro St | interior remodel of existing kitchen & 1 (e) bathroom & convert half bath to full bathroom. add entry closet at level 1.Details
interior remodel of existing kitchen & 1 (e) bathroom & convert half bath to full bathroom. add entry closet at level 1. | $65,000 |
| May 5, 2017 | Completed final sign-off Jun 2017 | 221 08th Av | remodel bathroom in kind. no changes to wall locations.Details
remodel bathroom in kind. no changes to wall locations. | $8,000 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 2035 10th Av | kitchen remodel in kind, bathroom remodel in kind. not moving walls, replace in same location.Details
kitchen remodel in kind, bathroom remodel in kind. not moving walls, replace in same location. | $37,000 |
| Jun 13, 2016 | Completed final sign-off Jan 2018 | 698 Belvedere St | rear addition and interior remodel to an existing 2 story residence, work includes remodeled kitchen, bathroom, new closet and roof deck over addition.Details
rear addition and interior remodel to an existing 2 story residence, work includes remodeled kitchen, bathroom, new closet and roof deck over addition. | $150,000 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 2179 16th Av | partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bathDetails
partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bath | $180,000 |
| Oct 6, 2014 | Completed final sign-off Apr 2015 | 3625 California St | office t.i. on ground floor. change dentist office to an attorneys office. add new handicaped bathroom, remodel lunch room, change lighting to led. move partition walls at two rear offices and add internet and plug outlets. keep (e) hvac (no change).Details
office t.i. on ground floor. change dentist office to an attorneys office. add new handicaped bathroom, remodel lunch room, change lighting to led. move partition walls at two rear offices and add internet and plug outlets. keep (e) hvac (no change). | $100,000 |
| May 16, 2014 | Completed final sign-off Mar 2017 | 138 Parker Av | alterations & expansion to 1st & 2nd & 3rd floor of subject property. 1st fl: add media room. 2nd fl: add breakfast room & deck. 3rd fl: add two bathrooms, breakfast roomand closet. horizontal expansion.Details
alterations & expansion to 1st & 2nd & 3rd floor of subject property. 1st fl: add media room. 2nd fl: add breakfast room & deck. 3rd fl: add two bathrooms, breakfast roomand closet. horizontal expansion. | $250,000 |
| Apr 2, 2014 | Expired or cancelled expired Mar 2016 | 668 Elizabeth St | new bathroom in existing residential condo unit.Details
new bathroom in existing residential condo unit. | $15,000 |
| Aug 9, 2013 | Completed final sign-off Jan 2014 | 1512 36th Av | lower bathroom remodel in kind, repl 3 alum windows and 1 door in rear of house, no change on walls, not visible from streetDetails
lower bathroom remodel in kind, repl 3 alum windows and 1 door in rear of house, no change on walls, not visible from street | $10,000 |
| Aug 9, 2013 | Completed final sign-off Jan 2014 | 333 Santa Ana Av | kitchen remodel in kind, 2 bathrooms remodel in kind, minor dry rot repairs at various areas around house, no change on wallsDetails
kitchen remodel in kind, 2 bathrooms remodel in kind, minor dry rot repairs at various areas around house, no change on walls | $105,000 |
| Apr 3, 2013 | Completed final sign-off Jul 2013 | 3034 Steiner St | remodel kitchen & bath - countertops, cabinets, bathtub & sink.Details
remodel kitchen & bath - countertops, cabinets, bathtub & sink. | $25,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 3036 Steiner St | remodel kitchen and bath in kind. no structural workDetails
remodel kitchen and bath in kind. no structural work | $20,000 |
| Feb 19, 2013 | Completed final sign-off Apr 2013 | 312 Mason St | remodel 8 bath rooms in kind.Details
remodel 8 bath rooms in kind. | $80,000 |
| Aug 10, 2010 | Expired or cancelled cancelled Mar 2011 | 334 Richland Av | remodel (e) kitchen & 2-bathrooms.Details
remodel (e) kitchen & 2-bathrooms. | $20,000 |
| Dec 21, 2009 | Never finaled issued Dec 2009, no final | 23 Meadowbrook Dr | bathroom remodel in kind. new tile fixtures. no new lighting. no structural work.Details
bathroom remodel in kind. new tile fixtures. no new lighting. no structural work. | $4,000 |
| Oct 6, 2009 | Completed final sign-off Dec 2009 | 2522 17th Av | remodel bathroom in kind. replace one kitchen cabinets. replace bathtub vanity, and shower. no lightingDetails
remodel bathroom in kind. replace one kitchen cabinets. replace bathtub vanity, and shower. no lighting | $6,000 |
| Jul 15, 2009 | Completed final sign-off Jan 2010 | 285 04th Av | remodel kitchen and bath approx 24 lin ft counter tops in kind, new fluorescent light fixtures, replace hood in kindDetails
remodel kitchen and bath approx 24 lin ft counter tops in kind, new fluorescent light fixtures, replace hood in kind | $30,000 |
| Feb 27, 2009 | Completed final sign-off May 2009 | 1907 Funston Av | remodel (e) kitchen approx 12 ln ft of counters. remodel (e) 2 bathrooms.Details
remodel (e) kitchen approx 12 ln ft of counters. remodel (e) 2 bathrooms. | $38,600 |
| Jun 16, 2008 | Completed final sign-off Sep 2010 | 150 Chapman St | 3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck.Details
3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck. | $350,000 |