Brendan Lalor Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Aug 2026
- Last 24 months
- 7 permits filed
90 permits since 2000: 72 completed, 6 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 10 completed, 1 in progress, 1 expired or cancelled. Typically 20 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2026 | Completed final sign-off May 2026 | 520 Monterey Bl | stair removal and repair at front entry due to dry rot, less than 50% repair and in-kind.Details
stair removal and repair at front entry due to dry rot, less than 50% repair and in-kind. | $20,000 |
| Jun 23, 2025 | In progress issued Oct 2025 | 2428 Union St | revision 202409261741- renovation of north unit. to inlcude (n) stair and roof deckDetails
revision 202409261741- renovation of north unit. to inlcude (n) stair and roof deck | $175,000 |
| May 15, 2023 | Completed final sign-off Sep 2023 | 345 Taraval St | revision to pa 2022-0926-3138. new framed in stair and landing for (e) pbx & internet roomDetails
revision to pa 2022-0926-3138. new framed in stair and landing for (e) pbx & internet room | $5,000 |
| Oct 28, 2020 | Completed final sign-off May 2025 | 44 Sequoia Wy | third floor addition; interior remodeling at the existing ground floor and second floor; widening of the garage door; window and exterior door changes at the existing two floors; removal of the existing rear decks, stair, and gazebo; and addition of a rear yard stair to the second floor.Details
third floor addition; interior remodeling at the existing ground floor and second floor; widening of the garage door; window and exterior door changes at the existing two floors; removal of the existing rear decks, stair, and gazebo; and addition of a rear yard stair to the second floor. | $450,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2021 | 1640 Haight St | to compy w/ mandatory disability access improvement program category checklist compliance form. primary entrance compliance sht a7.02 attached. upgrade bldg entry/exit doorway, toilet rm, add (n) toilet rm, add (n) inclinded platform lift at int stair, mod non-structural soffit over stair.Details
to compy w/ mandatory disability access improvement program category checklist compliance form. primary entrance compliance sht a7.02 attached. upgrade bldg entry/exit doorway, toilet rm, add (n) toilet rm, add (n) inclinded platform lift at int stair, mod non-structural soffit over stair. | $40,000 |
| Jun 21, 2019 | Completed final sign-off Aug 2020 | 332 College Av | excavation and interior remodel at gr fl to add living space, infill addition at ground fl under e bay window, trimming of bottom of e kitchen bay window for headroom at proposed exit path, replacement interior stairway, minor interior remodeling at 2nd fl, new windows and exterio doors at sidesDetails
excavation and interior remodel at gr fl to add living space, infill addition at ground fl under e bay window, trimming of bottom of e kitchen bay window for headroom at proposed exit path, replacement interior stairway, minor interior remodeling at 2nd fl, new windows and exterio doors at sides | $290,000 |
| Nov 15, 2018 | Expired or cancelled withdrawn Feb 2020 | 19 Cityview Wy | rear addition with roof & spiral stair to rear yard. interior remodeling at both floors with (n) side windows and door. addition of one skylight.Details
rear addition with roof & spiral stair to rear yard. interior remodeling at both floors with (n) side windows and door. addition of one skylight. | $305,000 |
| Feb 28, 2018 | Completed final sign-off Oct 2018 | 17 Iris Av | remove and replace dryrot stair less than 50% stair at front repair. terrazzo to terrazzo.Details
remove and replace dryrot stair less than 50% stair at front repair. terrazzo to terrazzo. | $8,000 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 2179 16th Av | partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bathDetails
partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bath | $180,000 |
| Mar 16, 2015 | Completed final sign-off May 2015 | 91 Ord St | common area- in kind replacement of non-conforming stairs in light well. stair is second means of egress.Details
common area- in kind replacement of non-conforming stairs in light well. stair is second means of egress. | $5,000 |
| Jun 16, 2008 | Completed final sign-off Sep 2010 | 150 Chapman St | 3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck.Details
3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck. | $350,000 |
| Feb 18, 2003 | Completed final sign-off May 2003 | 51 Miramar Av | repair dry rot on front stairs, repair in like kindDetails
repair dry rot on front stairs, repair in like kind | $6,000 |