Back to kitchen remodel contractors
Brendan Lalor Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Aug 2026
- Last 24 months
- 7 permits filed
90 permits since 2000: 72 completed, 6 in progress, 7 never finaled, 5 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 23 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1815 29th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $22,000 |
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 520 Monterey Bl | remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows.Details
remove wall between kitchen and living room to install new beam. remodel kitchen and bath in like kind. replace 8 window with milgard vinyl rear and lightwell, max u factor 0.3 for all windows. | $60,000 |
| Jul 26, 2022 | Completed final sign-off Aug 2023 | 1990 Green St | unit 105: kitchen, main bath, and guest bath remodel.Details
unit 105: kitchen, main bath, and guest bath remodel. | $200,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2020 | 150 San Aleso Av | remodel kitchen in-kind. replace two kitchen and four dining room windows w/all wood marvin ultimate double-hung windows. no other work.Details
remodel kitchen in-kind. replace two kitchen and four dining room windows w/all wood marvin ultimate double-hung windows. no other work. | $55,000 |
| Aug 29, 2019 | Completed final sign-off Sep 2022 | 81 Mercedes Wy | level 1: additon of 158 sq ft, remodel kitchen & relocate power room. new deck along rear,new door & windows. level 2: relocate laundry, new deck above addition area, new doors ondto deck.Details
level 1: additon of 158 sq ft, remodel kitchen & relocate power room. new deck along rear,new door & windows. level 2: relocate laundry, new deck above addition area, new doors ondto deck. | $70,000 |
| Jun 21, 2019 | Completed final sign-off Aug 2020 | 332 College Av | excavation and interior remodel at gr fl to add living space, infill addition at ground fl under e bay window, trimming of bottom of e kitchen bay window for headroom at proposed exit path, replacement interior stairway, minor interior remodeling at 2nd fl, new windows and exterio doors at sidesDetails
excavation and interior remodel at gr fl to add living space, infill addition at ground fl under e bay window, trimming of bottom of e kitchen bay window for headroom at proposed exit path, replacement interior stairway, minor interior remodeling at 2nd fl, new windows and exterio doors at sides | $290,000 |
| May 29, 2018 | Completed final sign-off Oct 2019 | 3702 22nd St | interior remodel of 2 family dwelling, replacemenet of selected windows and doors, add 3 dormers. interior work to include remodel/replacement of 2 kitchens, 3 baths, and addition of 1 (n) bath. (2) visible windows ( sidelite/1 casement) alum clad, (10) non-visible fiberglass, (1) alum clad doorDetails
interior remodel of 2 family dwelling, replacemenet of selected windows and doors, add 3 dormers. interior work to include remodel/replacement of 2 kitchens, 3 baths, and addition of 1 (n) bath. (2) visible windows ( sidelite/1 casement) alum clad, (10) non-visible fiberglass, (1) alum clad door | $185,000 |
| Aug 18, 2017 | Completed final sign-off Jan 2018 | 681 Castro St | interior remodel of existing kitchen & 1 (e) bathroom & convert half bath to full bathroom. add entry closet at level 1.Details
interior remodel of existing kitchen & 1 (e) bathroom & convert half bath to full bathroom. add entry closet at level 1. | $65,000 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 2035 10th Av | kitchen remodel in kind, bathroom remodel in kind. not moving walls, replace in same location.Details
kitchen remodel in kind, bathroom remodel in kind. not moving walls, replace in same location. | $37,000 |
| Jun 13, 2016 | Completed final sign-off Jan 2018 | 698 Belvedere St | rear addition and interior remodel to an existing 2 story residence, work includes remodeled kitchen, bathroom, new closet and roof deck over addition.Details
rear addition and interior remodel to an existing 2 story residence, work includes remodeled kitchen, bathroom, new closet and roof deck over addition. | $150,000 |
| Jan 4, 2016 | Completed final sign-off Jan 2018 | 250 09th Av | remodel of (e) kitchen, dining & breakfast room spaces, new deck with crawl space, voluntary strengthening, new window & exterior paint.Details
remodel of (e) kitchen, dining & breakfast room spaces, new deck with crawl space, voluntary strengthening, new window & exterior paint. | $140,000 |
| Jun 4, 2015 | Completed final sign-off Feb 2016 | 2179 16th Av | partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bathDetails
partial demo to allow e garage to living space, relate interior stairs, reconfigure side lightwell, add 2 sky lights, new french doors at rear yard facade, remodel e kitchen and e bath | $180,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 3095 24th Av | replace 13 windows w/marvin wood ultrex windows. kitchen remodel in kind. all windows to be casement.Details
replace 13 windows w/marvin wood ultrex windows. kitchen remodel in kind. all windows to be casement. | $25,000 |
| Aug 9, 2013 | Completed final sign-off Nov 2013 | 140 El Verano Wy | kitchen remodel in kind, replace 2 windows and 1 door in rear of house, not visible from street, no change on wallsDetails
kitchen remodel in kind, replace 2 windows and 1 door in rear of house, not visible from street, no change on walls | $25,000 |
| Aug 9, 2013 | Completed final sign-off Jan 2014 | 333 Santa Ana Av | kitchen remodel in kind, 2 bathrooms remodel in kind, minor dry rot repairs at various areas around house, no change on wallsDetails
kitchen remodel in kind, 2 bathrooms remodel in kind, minor dry rot repairs at various areas around house, no change on walls | $105,000 |
| Apr 3, 2013 | Completed final sign-off Jul 2013 | 3034 Steiner St | remodel kitchen & bath - countertops, cabinets, bathtub & sink.Details
remodel kitchen & bath - countertops, cabinets, bathtub & sink. | $25,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 3036 Steiner St | remodel kitchen and bath in kind. no structural workDetails
remodel kitchen and bath in kind. no structural work | $20,000 |
| Nov 18, 2010 | Completed final sign-off Apr 2011 | 17 Iris Av | remodel kitchen in kind approx 15' lin ft counter. replace hood in kind same duct at 2nd flDetails
remodel kitchen in kind approx 15' lin ft counter. replace hood in kind same duct at 2nd fl | $18,000 |
| Aug 10, 2010 | Expired or cancelled cancelled Mar 2011 | 334 Richland Av | remodel (e) kitchen & 2-bathrooms.Details
remodel (e) kitchen & 2-bathrooms. | $20,000 |
| Oct 6, 2009 | Completed final sign-off Dec 2009 | 2522 17th Av | remodel bathroom in kind. replace one kitchen cabinets. replace bathtub vanity, and shower. no lightingDetails
remodel bathroom in kind. replace one kitchen cabinets. replace bathtub vanity, and shower. no lighting | $6,000 |
| Oct 1, 2009 | Completed final sign-off Sep 2010 | 23 Meadowbrook Dr | kitchen remodel in kind (11'x10'). add (n) 5'-1/4"x14 2.oe parallam psl on 2nd floor. remove interior loard bearing wall for new beam. no lighting or mech.Details
kitchen remodel in kind (11'x10'). add (n) 5'-1/4"x14 2.oe parallam psl on 2nd floor. remove interior loard bearing wall for new beam. no lighting or mech. | $12,000 |
| Jul 15, 2009 | Completed final sign-off Jan 2010 | 285 04th Av | remodel kitchen and bath approx 24 lin ft counter tops in kind, new fluorescent light fixtures, replace hood in kindDetails
remodel kitchen and bath approx 24 lin ft counter tops in kind, new fluorescent light fixtures, replace hood in kind | $30,000 |
| Jul 15, 2009 | Completed final sign-off Sep 2009 | 120 Corona St | remodel kitchen in kind approx 16' of new counter new florescent light fixtures. (e) hood in kind.Details
remodel kitchen in kind approx 16' of new counter new florescent light fixtures. (e) hood in kind. | $20,000 |
| Feb 27, 2009 | Completed final sign-off May 2009 | 1907 Funston Av | remodel (e) kitchen approx 12 ln ft of counters. remodel (e) 2 bathrooms.Details
remodel (e) kitchen approx 12 ln ft of counters. remodel (e) 2 bathrooms. | $38,600 |
| Jun 16, 2008 | Completed final sign-off Sep 2010 | 150 Chapman St | 3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck.Details
3rd floor addition, 400 sf, general remodel: 1st fl: remove illegal kitchen and legalize toilet room, addition to stair. 2nd fl: e 3 bedroom to 2 bedroom, new bay window,new 1/2 bath. 3rd fl: new bedroom and full bath and exterior deck. | $350,000 |