Block 3513, lot 052
1307 Stevenson St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 5,860 sq ft
- Lot
- 5,810 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 5, 2026 | Completed final sign-off Mar 2026 | 1307 Stevenson St | Highland Construction S F Inc. | re-roofing. hot works.Details
re-roofing. hot works. | $34,000 |
| Dec 24, 2025 | Completed final sign-off Mar 2026 | 1327 Stevenson St | Bail Construction | remodel one kitchen in kindDetails
remodel one kitchen in kind | $12,000 |
| Oct 30, 2025 | Completed final sign-off Jan 2026 | 1307 Stevenson St | Bail Construction | remodel one kitchen and one bathroom in kind. rewire (2) rooms kitchen and bathroom. install (4) vinyl windows in kind on the rear. install new flooring and paint. u-factor 0.3 max.Details
remodel one kitchen and one bathroom in kind. rewire (2) rooms kitchen and bathroom. install (4) vinyl windows in kind on the rear. install new flooring and paint. u-factor 0.3 max. | $45,000 |
| May 9, 2024 | Completed final sign-off Sep 2024 | 1307 Stevenson St | J P F Construction | mandatory soft story retrofit in the basement per 2022 sfebc. appendix a4. add plywood shear wall with concrete grade beams.Details
mandatory soft story retrofit in the basement per 2022 sfebc. appendix a4. add plywood shear wall with concrete grade beams. | $90,000 |
| May 19, 2017 | Completed final sign-off Feb 2018 | 1311 Stevenson St | Y D Construction Co. Inc. | remodel kitchen and bathroom, no wall removed, change water heater.Details
remodel kitchen and bathroom, no wall removed, change water heater. | $12,000 |
| Jan 10, 2017 | Completed final sign-off Mar 2017 | 1327 Stevenson St | Y D Construction Co. Inc. | repair the rear exterior stair less than 50% for complaint # 201633541, item #3Details
repair the rear exterior stair less than 50% for complaint # 201633541, item #3 | $500 |
| Oct 18, 2011 | Completed final sign-off Jan 2012 | 1307 Stevenson St | Luo's Construction Company **Check Id*** | to comply notice of violations #201156809 to repair walkway decking and decking joist at reat of building, less than 50% repair of deck in kind.Details
to comply notice of violations #201156809 to repair walkway decking and decking joist at reat of building, less than 50% repair of deck in kind. | $1,000 |
| Oct 1, 2002 | Completed final sign-off Oct 2002 | 1307 Stevenson St | Eco Village Costruction | replace in like kind existing front stairs. same for same.Details
replace in like kind existing front stairs. same for same. | $4,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.