J P F Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2026
- Last 24 months
- 11 permits filed
122 permits since 2000: 89 completed, 7 in progress, 22 never finaled, 4 expired or cancelled.
Of the 22 never-finaled permits, 4 are 3 to 5 years old, 10 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 4 days from filing to permit and 409 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2020 | Completed final sign-off Feb 2022 | 1260 Vallejo St | front bldg - revision to permit #2019-1001-3173. 1) eliminate rj1 and rj2, future roof deck. scope eliminated. 2) eliminate 6x6 post @ line 1.3 install concrete pad at line 3Details
front bldg - revision to permit #2019-1001-3173. 1) eliminate rj1 and rj2, future roof deck. scope eliminated. 2) eliminate 6x6 post @ line 1.3 install concrete pad at line 3 |