Back to kitchen remodel contractors
J P F Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2026
- Last 24 months
- 11 permits filed
122 permits since 2000: 89 completed, 7 in progress, 22 never finaled, 4 expired or cancelled.
Of the 22 never-finaled permits, 4 are 3 to 5 years old, 10 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
64 kitchen remodel permits: 47 completed, 5 in progress, 8 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 1269 Silver Av | remove drywall to do full 2/f rewire and insulation. install new 5/8" fire rated drywall, paint, new flooring. kitchen bathroom remodel, no move walls.Details
remove drywall to do full 2/f rewire and insulation. install new 5/8" fire rated drywall, paint, new flooring. kitchen bathroom remodel, no move walls. | $60,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 1775 47th Av | 2/f: remodel kitchen and 2.5 bathrooms. 1/f: remodel bathroom in-kind. no structural work or wall modifications.Details
2/f: remodel kitchen and 2.5 bathrooms. 1/f: remodel bathroom in-kind. no structural work or wall modifications. | $103,000 |
| Jun 3, 2026 | In progress issued Jul 2026 | 1455 Clay St | unit 3: bathroom and kitchen build-back due to water damaged walls. hang new 5/8in type-x drywall (fire rated). full paint unit and refinishe the (e) floor). replacement of receptacles throughout. to comply nov 202655991Details
unit 3: bathroom and kitchen build-back due to water damaged walls. hang new 5/8in type-x drywall (fire rated). full paint unit and refinishe the (e) floor). replacement of receptacles throughout. to comply nov 202655991 | $70,000 |
| Jun 2, 2026 | In progress issued Jun 2026 | 918 Sacramento St | unit 2 & 7: (2) kitchen and (2) bathroom remodelDetails
unit 2 & 7: (2) kitchen and (2) bathroom remodel | $40,000 |
| May 27, 2026 | In progress issued Jun 2026 | 1405 Van Ness Av | reconfigure interior layout by relocating non load bearing walls and adding laundry units in 201, 210, 404, 407,410. in kind replacement of kitchen and electrical fixtures. in kind replacement of plumbing fixtures and add plumbing fixtures to bathroom.Details
reconfigure interior layout by relocating non load bearing walls and adding laundry units in 201, 210, 404, 407,410. in kind replacement of kitchen and electrical fixtures. in kind replacement of plumbing fixtures and add plumbing fixtures to bathroom. | $100,000 |
| Feb 19, 2026 | Completed final sign-off Jun 2026 | 1940 Washington St | unit #101: kitchen and bathroom remodel. rehang drywall 5/8" type x gyp. bd. and paint throughout the unit. replace flooring throughout the unit.Details
unit #101: kitchen and bathroom remodel. rehang drywall 5/8" type x gyp. bd. and paint throughout the unit. replace flooring throughout the unit. | $60,000 |
| Aug 5, 2024 | Completed final sign-off Nov 2024 | 1555 Hyde St | unit 5: kitchen & bathroom remodel in kindDetails
unit 5: kitchen & bathroom remodel in kind | $30,000 |
| Jul 5, 2024 | Completed final sign-off May 2025 | 707 Stockton St | unit 101 & 102 remove (e) kitchen cabinets and quartz counters, sink, faucet then replace in kind unit #207 same scope of work at kitchen and replace windows to dual glaz vinyl windows ( not street facing ) in kindDetails
unit 101 & 102 remove (e) kitchen cabinets and quartz counters, sink, faucet then replace in kind unit #207 same scope of work at kitchen and replace windows to dual glaz vinyl windows ( not street facing ) in kind | $12,000 |
| Mar 25, 2024 | Completed final sign-off May 2025 | 53 Ledyard St | rear cottage: revision to permit 202105180551 - reconfigure bathroom and kitchen. add washer and dryer. details no change and shall follow previous.Details
rear cottage: revision to permit 202105180551 - reconfigure bathroom and kitchen. add washer and dryer. details no change and shall follow previous. | |
| Sep 22, 2023 | Completed final sign-off Jul 2024 | 2059 Fulton St | remove interior walls and add new beams on 1st and 2nd fl. convert 1/2 bath 2nd fl to full bath, add skylight, gr fl: new wetbar, add full bath, family rm, bedroom ,storage. relocate kitchen water heater.Details
remove interior walls and add new beams on 1st and 2nd fl. convert 1/2 bath 2nd fl to full bath, add skylight, gr fl: new wetbar, add full bath, family rm, bedroom ,storage. relocate kitchen water heater. | $20,000 |
| Jul 5, 2023 | Completed final sign-off Jul 2024 | 2059 Fulton St | (1) kitchen and (1) bathroom remodel in kind. no structural work. no wall layout change. no floor layout change.Details
(1) kitchen and (1) bathroom remodel in kind. no structural work. no wall layout change. no floor layout change. | $35,000 |
| May 26, 2023 | Completed final sign-off Oct 2023 | 3223 Laguna St | kitchen and bathroom remodel (rear building). no change of layout.Details
kitchen and bathroom remodel (rear building). no change of layout. | $20,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2023 | 1888 Golden Gate Av | unit #16: kitchen and bathroom remodel in kind.no str workDetails
unit #16: kitchen and bathroom remodel in kind.no str work | $45,000 |
| Jul 29, 2022 | Completed final sign-off Oct 2025 | 855 41st Av | basement fl. inclose tall portion of house, convert to study&wine cell, excavate down to 36" in (e) crawl space 1st fl. relocat utility, n 2bedrm, living rm and bath stair to 2nd fl. 2nd fl. enclosed light well, relocate kithen, refurbish bth remove wall btwn living rm and kitchen, demo (e) stair,Details
basement fl. inclose tall portion of house, convert to study&wine cell, excavate down to 36" in (e) crawl space 1st fl. relocat utility, n 2bedrm, living rm and bath stair to 2nd fl. 2nd fl. enclosed light well, relocate kithen, refurbish bth remove wall btwn living rm and kitchen, demo (e) stair, | $90,000 |
| Feb 25, 2022 | Never finaled issued May 2022, no final | 2534 19th Av | 1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs.Details
1st fl: add family room, 1 bedroom, sauna, 1 full bath & laundry. 2nd fl: remodel kitchen, bathroom, add full bath. relocate interior stairs. | $150,000 |
| Jan 27, 2022 | Completed final sign-off Oct 2023 | 2507 41st Av | 1st fl: add den, family & 1 full bath. 2nd fl: remodel kitchen, bathroom & bedrooms. add 1 full bath. add new deck.Details
1st fl: add den, family & 1 full bath. 2nd fl: remodel kitchen, bathroom & bedrooms. add 1 full bath. add new deck. | $85,000 |
| Oct 19, 2021 | Completed final sign-off Apr 2025 | 340 05th Av | 2nd fl: in-fill partial lightwell at north side of the bldg 2. remove walls between kitchen and family room to crfeat open layout 3. convert (e) living rm into bedroom 4. convert (e) bedroom into gym. 5. convert (e) family rm in living room. 6. add one bathroom. 7 kitchen and powder rm remodel.Details
2nd fl: in-fill partial lightwell at north side of the bldg 2. remove walls between kitchen and family room to crfeat open layout 3. convert (e) living rm into bedroom 4. convert (e) bedroom into gym. 5. convert (e) family rm in living room. 6. add one bathroom. 7 kitchen and powder rm remodel. | $20,000 |
| Sep 16, 2020 | Never finaled issued Apr 2022, no final | 2749 35th Av | 1st flr- add 2 bedrms, study rm, 3 fixture full bath, entertainment w/ wetbar & laundry rm. 2nd flr- (n) deck at rear. reconfigure intioer layout w/ 2 bedrms, an office, 2 full baths, w.i.c, kitchen, livg, & din rm. relocate interior stairs. (single-family use) (no group housing)Details
1st flr- add 2 bedrms, study rm, 3 fixture full bath, entertainment w/ wetbar & laundry rm. 2nd flr- (n) deck at rear. reconfigure intioer layout w/ 2 bedrms, an office, 2 full baths, w.i.c, kitchen, livg, & din rm. relocate interior stairs. (single-family use) (no group housing) | $50,000 |
| Jan 16, 2020 | Completed final sign-off Feb 2021 | 4326 Cabrillo St | interior remodel with structural design on 1st and 2nd floor. 1st floor: add one office, one entertainment and 2 bedroom, and one bath. 2nd floor:add 4 fixture bath and a kitchen.Details
interior remodel with structural design on 1st and 2nd floor. 1st floor: add one office, one entertainment and 2 bedroom, and one bath. 2nd floor:add 4 fixture bath and a kitchen. | $80,000 |
| Dec 31, 2019 | Completed final sign-off Feb 2021 | 4326 Cabrillo St | kitchen and bathroom remodel. no change layoutDetails
kitchen and bathroom remodel. no change layout | $25,000 |
| Dec 5, 2019 | Completed final sign-off Aug 2021 | 431 41st Av | 1st fl - reconfigure int'r staircase to 2nd fl; add (1)3 fixture bathrm, i media, study and 2 bedrms; create hallway to rear; raise partial 1st fl.; 2nd fl - reconfigure int'r stair to 3rd fl ; relocate kitchen; remodel (e) 3-fixture bathrm, add (1)3 fixture bathrm and 1 bedrm; 3rd fl - remodel (e)Details
1st fl - reconfigure int'r staircase to 2nd fl; add (1)3 fixture bathrm, i media, study and 2 bedrms; create hallway to rear; raise partial 1st fl.; 2nd fl - reconfigure int'r stair to 3rd fl ; relocate kitchen; remodel (e) 3-fixture bathrm, add (1)3 fixture bathrm and 1 bedrm; 3rd fl - remodel (e) | $50,000 |
| Nov 8, 2019 | Never finaled issued Nov 2019, no final | 431 41st Av | kitchen remodel (7' x 10')Details
kitchen remodel (7' x 10') | $15,000 |
| Oct 8, 2019 | Completed final sign-off Feb 2022 | 1264 Vallejo St | rear building: 1) reconfigure interior layout with 4 bedrooms, three fixtures bathrooms, kitchen, laundry, and living room on 4th floor.Details
rear building: 1) reconfigure interior layout with 4 bedrooms, three fixtures bathrooms, kitchen, laundry, and living room on 4th floor. | $50,000 |
| Oct 1, 2019 | Completed final sign-off Feb 2022 | 1260 Vallejo St | front bld - reconfig int layout w/2 bedrm, 2 3-fix bathrm, ofc, kitchen, laundry & liv rm on 2nd flr reconfig int layout w/3 bedrm, 2 3-fix bathrms, ofc, kitchen , laundry & liv rm on 4th.Details
front bld - reconfig int layout w/2 bedrm, 2 3-fix bathrm, ofc, kitchen, laundry & liv rm on 2nd flr reconfig int layout w/3 bedrm, 2 3-fix bathrms, ofc, kitchen , laundry & liv rm on 4th. | $50,000 |
| May 21, 2019 | Completed final sign-off Nov 2019 | 1402 Kearny St | unit # 1: remodel kitchen and bathroom. new painting, install nw flooring throughout. no change of existing floor plans.Details
unit # 1: remodel kitchen and bathroom. new painting, install nw flooring throughout. no change of existing floor plans. | $40,000 |
| Apr 5, 2019 | Completed final sign-off Aug 2019 | 927 Rivera St | revision to app#201902072415: 1st floor to 1)add one family room, 2) expand the 3 fixture bathroom. 3) reconfigure interior staircase to connect 1st & 2nd floor. 2nd floor: 4)kitchen remodel. 5)add one w.i.c. to the extg bedroom.Details
revision to app#201902072415: 1st floor to 1)add one family room, 2) expand the 3 fixture bathroom. 3) reconfigure interior staircase to connect 1st & 2nd floor. 2nd floor: 4)kitchen remodel. 5)add one w.i.c. to the extg bedroom. | |
| Feb 7, 2019 | Completed final sign-off Jul 2019 | 927 Rivera St | one media, one office, one full bath, add spiral staircase to create interior connection between 1st & 2nd fl. 2nd fl kitchen remodel, relocate 1 full bath add one 3-fixture bath, add deck at rear for 2nd fl. access, lightwell in-fill at south side of property windowDetails
one media, one office, one full bath, add spiral staircase to create interior connection between 1st & 2nd fl. 2nd fl kitchen remodel, relocate 1 full bath add one 3-fixture bath, add deck at rear for 2nd fl. access, lightwell in-fill at south side of property window | $80,000 |
| Jan 14, 2019 | Completed final sign-off Aug 2019 | 927 Rivera St | kitchen remodel, no change of layout.Details
kitchen remodel, no change of layout. | $22,000 |
| Jan 10, 2019 | Completed final sign-off Aug 2020 | 124 Waverly Pl | convert 2nd floor commercial space to (1) 3-bedrms, 2-baths & 1-kitchen adu unit per ord# 162-16 to (e) residential hotel bldg with 29-guest rooms. fire sprinklers under seperate permit.Details
convert 2nd floor commercial space to (1) 3-bedrms, 2-baths & 1-kitchen adu unit per ord# 162-16 to (e) residential hotel bldg with 29-guest rooms. fire sprinklers under seperate permit. | $30,000 |
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 1402 Kearny St | kitchen & bathroom remodel in unit 4. no chanbe of layouts. no change on walls. maher n/a.Details
kitchen & bathroom remodel in unit 4. no chanbe of layouts. no change on walls. maher n/a. | $35,000 |
| Sep 25, 2018 | Expired or cancelled cancelled Dec 2025 | 96 Huntington Dr | 1st fl. remove (e) office, add (2) bedrooms, bathroom remodel. 2nd fl. relocate (e) bedrooms & kitchen, add (1) master bedroom & (1) master bath. add (n) skylights, infill (e) skylights, minor in-kind repair to (e) finishesDetails
1st fl. remove (e) office, add (2) bedrooms, bathroom remodel. 2nd fl. relocate (e) bedrooms & kitchen, add (1) master bedroom & (1) master bath. add (n) skylights, infill (e) skylights, minor in-kind repair to (e) finishes | $75,000 |
| Sep 24, 2018 | Completed final sign-off Feb 2019 | 3245 23rd St | remodel kitchen and bathroom. removal of closet between kitchen and bathroom.Details
remodel kitchen and bathroom. removal of closet between kitchen and bathroom. | $10,000 |
| Aug 24, 2018 | Expired or cancelled cancelled Dec 2025 | 96 Huntington Dr | kitchen remodel.Details
kitchen remodel. | $12,000 |
| Jul 24, 2018 | Completed final sign-off Sep 2018 | 818 Scott St | remodel of kitchen & bath with like kind.Details
remodel of kitchen & bath with like kind. | $20,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2019 | 466 32nd Av | kitchen remodelDetails
kitchen remodel | $12,000 |
| Mar 6, 2018 | Completed final sign-off Oct 2018 | 754 Lakeview Av | grnd flr - relocation of (e) full bath, converting approved contioned space into (2) bedrooms. 2nd flr - addition of new full bath, remodel of (e) full bath, relocation of kitchenDetails
grnd flr - relocation of (e) full bath, converting approved contioned space into (2) bedrooms. 2nd flr - addition of new full bath, remodel of (e) full bath, relocation of kitchen | $95,000 |
| Feb 12, 2018 | Never finaled issued Feb 2018, no final | 2228 Union St | wor in unit 107: kitchen and bathroom remodelDetails
wor in unit 107: kitchen and bathroom remodel | $35,000 |
| Dec 28, 2017 | Completed final sign-off Jul 2018 | 2087 46th Av | inkind replacement of front bay window (wood casement-style with true-divided-lite muntins); replace non-original front kitchen window with casement-style wood window with true-divided-lite muntin pattern to match bay window; any non-visible window replacement - any material okayDetails
inkind replacement of front bay window (wood casement-style with true-divided-lite muntins); replace non-original front kitchen window with casement-style wood window with true-divided-lite muntin pattern to match bay window; any non-visible window replacement - any material okay | $5,000 |
| Nov 29, 2017 | Completed final sign-off Feb 2018 | 2228 Union St | unit #207: kitchen and bathroom remodel. no change in (e) layout. maher n/aDetails
unit #207: kitchen and bathroom remodel. no change in (e) layout. maher n/a | $35,000 |
| Nov 29, 2017 | Completed final sign-off Mar 2018 | 611 Minna St | unit #5: kitchen and bathroom remodel. no change of the layout. maher n/aDetails
unit #5: kitchen and bathroom remodel. no change of the layout. maher n/a | $31,000 |
| Nov 27, 2017 | Completed final sign-off Jul 2018 | 2087 46th Av | kitchen & 2 bathrooms remodel.Details
kitchen & 2 bathrooms remodel. | $65,000 |
| Sep 29, 2017 | Completed final sign-off Apr 2018 | 23 Jasper Pl | relocate e kitchen, remodel 1 e bathroom, construct 1 full bath, rewire elec lighting, upgrade partial ceiling framing. all work on the 3rd fl. ref pa#2017-09-29-9917 for ground floorDetails
relocate e kitchen, remodel 1 e bathroom, construct 1 full bath, rewire elec lighting, upgrade partial ceiling framing. all work on the 3rd fl. ref pa#2017-09-29-9917 for ground floor | $45,000 |
| Sep 14, 2017 | Completed final sign-off Jan 2018 | 2107 Pierce St | #5. kitchen remodel - bathroom new floor tiles. remove carpets - refinihsing floor. painting. no wall modification - no structural work.Details
#5. kitchen remodel - bathroom new floor tiles. remove carpets - refinihsing floor. painting. no wall modification - no structural work. | $20,000 |
| Sep 14, 2017 | Completed final sign-off Nov 2017 | 611 Minna St | #8. kitchen and bathroom remodel. install new floors. painting. no wall modification - non structural work. maher naDetails
#8. kitchen and bathroom remodel. install new floors. painting. no wall modification - non structural work. maher na | $30,000 |
| Aug 8, 2017 | Expired or cancelled expired Jun 2025 | 490 Francisco St | interior remodel, 1st, 2nd, 3rd fl. remove walls, add post and beams. reconfigure space. units 2, 4, 5 & 6 kitchen and bathroom remodel. n/a maherDetails
interior remodel, 1st, 2nd, 3rd fl. remove walls, add post and beams. reconfigure space. units 2, 4, 5 & 6 kitchen and bathroom remodel. n/a maher | $35,000 |
| Aug 3, 2017 | Completed final sign-off Dec 2017 | 1115 Polk St | unit #24: kitchen and bathroom remodel. patch. paint.Details
unit #24: kitchen and bathroom remodel. patch. paint. | $38,000 |
| Jul 6, 2017 | Expired or cancelled expired Apr 2026 | 1415 Clay St | per unit legalization ordinance 43-14, legalization of unit installed without permit, legalize kitchen, living room, one bath room at ground floor. construct interior staircase connect from ground down to lower floor.Details
per unit legalization ordinance 43-14, legalization of unit installed without permit, legalize kitchen, living room, one bath room at ground floor. construct interior staircase connect from ground down to lower floor. | $62,000 |
| Jul 3, 2017 | Completed final sign-off Aug 2017 | 2228 Union St | apt 102: kitchen & bathroom remodel. painting, patch and cabinetry replacement.Details
apt 102: kitchen & bathroom remodel. painting, patch and cabinetry replacement. | $30,000 |
| Jun 6, 2017 | Completed final sign-off Sep 2017 | 1415 Clay St | unit 1 -kitchen & bathroom remodel; patch, painting. re-finishing floor.Details
unit 1 -kitchen & bathroom remodel; patch, painting. re-finishing floor. | $35,000 |
| Feb 27, 2017 | Completed final sign-off Dec 2017 | 1115 Polk St | apt 23: kitchen & bathroomreodel. refinish floor. patch & painting.Details
apt 23: kitchen & bathroomreodel. refinish floor. patch & painting. | $30,000 |
| Feb 27, 2017 | Completed final sign-off Aug 2017 | 1415 Clay St | apt 3: kitchen & bathroom remodel. refinish floor. pat & panting.Details
apt 3: kitchen & bathroom remodel. refinish floor. pat & panting. | $35,000 |
| Feb 27, 2017 | Completed final sign-off Apr 2017 | 611 Minna St | apt 7 & 11: kitchen & bathroom remodels. install new floors. patch & painting.Details
apt 7 & 11: kitchen & bathroom remodels. install new floors. patch & painting. | $50,000 |
| Feb 9, 2017 | Completed final sign-off Dec 2017 | 1115 Polk St | unit 39: kitchen and bath remodel. refinish floor and paintDetails
unit 39: kitchen and bath remodel. refinish floor and paint | $30,000 |
| Nov 29, 2016 | Completed final sign-off May 2017 | 285 Grand View Av | apt #6 : kitchen & bathroom remodel. no changes to pulmbing rough-in. redo eletrical work in unit.Details
apt #6 : kitchen & bathroom remodel. no changes to pulmbing rough-in. redo eletrical work in unit. | $25,000 |
| Oct 25, 2016 | Completed final sign-off Dec 2017 | 1115 Polk St | unit 20,22,26,31, & 40 -remodel kitchen & bathrooms, re-finishe floor; pathcing/ painting.Details
unit 20,22,26,31, & 40 -remodel kitchen & bathrooms, re-finishe floor; pathcing/ painting. | $150,000 |
| Sep 23, 2016 | Completed final sign-off Aug 2017 | 19 Jasper Pl | relocate extg kitchen, remodel one extg bath room, construct one new full bathroom, re-wire elect., lighting and upgrade partial extg ceiling framing. all work at 1st floor.Details
relocate extg kitchen, remodel one extg bath room, construct one new full bathroom, re-wire elect., lighting and upgrade partial extg ceiling framing. all work at 1st floor. | $36,000 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 2288 Fulton St | remodel 1 bathroom & 1 kitchen,. electrical upgrade, painting, non-structural work.Details
remodel 1 bathroom & 1 kitchen,. electrical upgrade, painting, non-structural work. | $45,000 |
| Oct 2, 2015 | Never finaled issued Oct 2015, no final | 655 Hyde St | unit #14: unit improvement, kitchen and bathroom remodels.Details
unit #14: unit improvement, kitchen and bathroom remodels. | $25,000 |
| Aug 27, 2015 | Completed final sign-off Jan 2016 | 1900 Clement St | change existing japanese cusine to a chinese restaurnat, demo sushi bar in dining area and build a non structural partition (7') between dining and kitchen. replace electrical sub panel with new, add 220v new electrical receptacles.Details
change existing japanese cusine to a chinese restaurnat, demo sushi bar in dining area and build a non structural partition (7') between dining and kitchen. replace electrical sub panel with new, add 220v new electrical receptacles. | $12,000 |
| May 28, 2015 | Never finaled issued Jun 2015, no final | 937 Clay St | 1st flr/unit #101: remodel apartment unit 101- renovating kitchen, renovating bathroom, new finishes connect sprinkler heads. reconfigure layout to create 3 bedroom unitDetails
1st flr/unit #101: remodel apartment unit 101- renovating kitchen, renovating bathroom, new finishes connect sprinkler heads. reconfigure layout to create 3 bedroom unit | $40,000 |
| Mar 13, 2015 | Completed final sign-off May 2015 | 655 Hyde St | unit 9 -kitchen and bathroom remodels; electrical upgrade, patch , painting; to comply with cec150.0(k)3 & 5Details
unit 9 -kitchen and bathroom remodels; electrical upgrade, patch , painting; to comply with cec150.0(k)3 & 5 | $25,000 |
| Oct 27, 2014 | Completed final sign-off Dec 2014 | 1523 Taylor St | unit 1 & 4 - these 2 units was water damaged, need a permit to do water damaged repair, works to do as install new cabinets, flooring, drywalls & painting in kitchen.Details
unit 1 & 4 - these 2 units was water damaged, need a permit to do water damaged repair, works to do as install new cabinets, flooring, drywalls & painting in kitchen. | $19,000 |
| Oct 14, 2014 | Completed final sign-off Dec 2014 | 1051 Post St | demolish all walls inside of units. no changes to the wall layout. kitchen and bthroom remodel. kitchen 70 sq. ft, bathroom 40 sq. ft. electrical upgrade. no changes to doors or windows. work only for unit #26.Details
demolish all walls inside of units. no changes to the wall layout. kitchen and bthroom remodel. kitchen 70 sq. ft, bathroom 40 sq. ft. electrical upgrade. no changes to doors or windows. work only for unit #26. | $18,000 |
| Sep 4, 2014 | Never finaled issued Sep 2014, no final | 937 Clay St | floors 2 - 4 common areas - bathrooms, kitchens, shower rooms: demolish existing drywalls at shower room. remodel demolish drywall at kitchen and bathrooms (3) shower rooms & (3) kitchens total. plumbing: replace all (e) plumbing fixtures with low flow rate units. finishes: lay tiles andDetails
floors 2 - 4 common areas - bathrooms, kitchens, shower rooms: demolish existing drywalls at shower room. remodel demolish drywall at kitchen and bathrooms (3) shower rooms & (3) kitchens total. plumbing: replace all (e) plumbing fixtures with low flow rate units. finishes: lay tiles and | $40,000 |