Block 0243, lot 007A
707 Stockton St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 6
- Units
- 46
- Rooms
- 46 bathrooms
- Building
- 22,410 sq ft
- Lot
- 4,647 sq ft
- Zoning
- RM4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 5, 2024 | Completed final sign-off May 2025 | 707 Stockton St | J P F Construction | unit 101 & 102 remove (e) kitchen cabinets and quartz counters, sink, faucet then replace in kind unit #207 same scope of work at kitchen and replace windows to dual glaz vinyl windows ( not street facing ) in kindDetails
unit 101 & 102 remove (e) kitchen cabinets and quartz counters, sink, faucet then replace in kind unit #207 same scope of work at kitchen and replace windows to dual glaz vinyl windows ( not street facing ) in kind | $12,000 |
| Nov 1, 2022 | Completed final sign-off Oct 2023 | 707 Stockton St | unit 204: replace street facing windows- aluminum exterior clad 4 windows double pane lower double hung/ casement. 1 vinyl / casement not street face.unit 603: replace street facing windows with marvin wood windows aluminum exterior clad- 4 windows double pane lower double hung/ casement. 2 vinylDetails
unit 204: replace street facing windows- aluminum exterior clad 4 windows double pane lower double hung/ casement. 1 vinyl / casement not street face.unit 603: replace street facing windows with marvin wood windows aluminum exterior clad- 4 windows double pane lower double hung/ casement. 2 vinyl | $15,000 | |
| Feb 18, 2021 | Completed final sign-off Aug 2021 | 707 Stockton St | David Jone | units 305 & 406: replace kitchen cabinets & countertops 76"x81", replace (11) windows. work at units 305 & 406Details
units 305 & 406: replace kitchen cabinets & countertops 76"x81", replace (11) windows. work at units 305 & 406 | $10,000 |
| Oct 28, 2020 | Completed final sign-off Jun 2021 | 707 Stockton St | International Fire Inc | like for like fire system replacement with upgrade to meet sec 1103.7.6.1. replace exisring devices with new at the same location. existing bells replace with new horn/strobes. install new low frequency horns inside units. install modules to tie-in ex. flow switDetails
like for like fire system replacement with upgrade to meet sec 1103.7.6.1. replace exisring devices with new at the same location. existing bells replace with new horn/strobes. install new low frequency horns inside units. install modules to tie-in ex. flow swit | $28,000 |
| Nov 20, 2018 | Completed final sign-off Jul 2019 | 707 Stockton St | replace windows for units 201 and 501 at non-visible rear of building with vinyl double-hung windows in same openings. no other work. work limited to rear elevation. windows with in same openings. n/a for maher.Details
replace windows for units 201 and 501 at non-visible rear of building with vinyl double-hung windows in same openings. no other work. work limited to rear elevation. windows with in same openings. n/a for maher. | $6,000 | |
| Sep 25, 2018 | Completed final sign-off Jan 2019 | 707 Stockton St | install alum clad wood windows on street facing windows and vinyl windows for those not visible from street. 0.29 u factor for windowsDetails
install alum clad wood windows on street facing windows and vinyl windows for those not visible from street. 0.29 u factor for windows | $10,000 | |
| Sep 22, 2017 | Completed final sign-off Jan 2018 | 707 Stockton St | replace windows at apt #302: wood aluminum clad windows faing street to match existing finish. vinyl on windows not facing/visible from street.Details
replace windows at apt #302: wood aluminum clad windows faing street to match existing finish. vinyl on windows not facing/visible from street. | $4,000 | |
| Apr 6, 2017 | Never finaled issued Apr 2017, no final | 707 Stockton St | street spaceDetails
street space | ||
| Jun 20, 2016 | Completed final sign-off Sep 2016 | 707 Stockton St | apt 304: replace street facing windows with marvin wood windows, aluminum exterior clad. four windows double pane, low e, double hung and casement. apt 508: replace three windows vinyl double pane, low e, does not face street. not visible from street.Details
apt 304: replace street facing windows with marvin wood windows, aluminum exterior clad. four windows double pane, low e, double hung and casement. apt 508: replace three windows vinyl double pane, low e, does not face street. not visible from street. | $4,700 | |
| Jun 29, 2015 | Completed final sign-off Jan 2016 | 707 Stockton St | replace windows. wood windows with aluminum clad exterior to match existing for windows facing or visible from street. vinyl for those windows not facing or visible from street. apartments 106, 205, 502, and 606.Details
replace windows. wood windows with aluminum clad exterior to match existing for windows facing or visible from street. vinyl for those windows not facing or visible from street. apartments 106, 205, 502, and 606. | $14,000 | |
| Oct 20, 2014 | Completed final sign-off Nov 2014 | 707 Stockton St | replace 7 windows with wood dual pane windows same size. windows visible from the street. exterior of windows is aluminum clad to match existing windows.Details
replace 7 windows with wood dual pane windows same size. windows visible from the street. exterior of windows is aluminum clad to match existing windows. | $5,200 | |
| Jul 30, 2014 | Completed final sign-off Aug 2014 | 707 Stockton St | replace interior (3) windows. not visible from street. dual glaze vinylDetails
replace interior (3) windows. not visible from street. dual glaze vinyl | $1,400 | |
| Jul 18, 2014 | Completed final sign-off Aug 2014 | 707 Stockton St | replace 7 windows in apartment 203. wood windows with aluminum exterior clad to match existing. visible from street.; maher n/aDetails
replace 7 windows in apartment 203. wood windows with aluminum exterior clad to match existing. visible from street.; maher n/a | $5,200 | |
| Oct 3, 2013 | Completed final sign-off Mar 2014 | 707 Stockton St | replace 4 windows with dual panel windows in apartment; same size and location. apt back of bldg, no street frontage.Details
replace 4 windows with dual panel windows in apartment; same size and location. apt back of bldg, no street frontage. | $2,000 | |
| Jul 10, 2013 | Completed final sign-off Oct 2013 | 707 Stockton St | replace windows (4) not visible from street. u-factor .4 maxDetails
replace windows (4) not visible from street. u-factor .4 max | $1,600 | |
| Jun 7, 2013 | Completed final sign-off Oct 2013 | 707 Stockton St | replace windows apt 202 & 607; 8 windows total 3 facing street in kindDetails
replace windows apt 202 & 607; 8 windows total 3 facing street in kind | $4,000 | |
| May 9, 2012 | Completed final sign-off Oct 2012 | 707 Stockton St | replace single pane windows w/ double pane windows w/ double pane windows #306 & 401. some windows visible from the street. vinyl window replacement @ rear only. wood or wooden clad, double-hung windows at primary facades #306 - 5 window #401 - 3 windows.Details
replace single pane windows w/ double pane windows w/ double pane windows #306 & 401. some windows visible from the street. vinyl window replacement @ rear only. wood or wooden clad, double-hung windows at primary facades #306 - 5 window #401 - 3 windows. | $2,500 | |
| Aug 4, 2011 | Completed final sign-off Oct 2011 | 707 Stockton St | R B Roofing Co Inc | reroofingDetails
reroofing | $41,600 |
| Jan 3, 2008 | Expired or cancelled cancelled Jan 2026 | 707 Stockton St | #208 & 308 inside walls and ceiling sheetrock. 3rd hallway 4x8 sheetrock. #208 &308 inside painting, fire damage repairDetails
#208 & 308 inside walls and ceiling sheetrock. 3rd hallway 4x8 sheetrock. #208 &308 inside painting, fire damage repair | $20,000 | |
| Jan 3, 2008 | Completed final sign-off May 2008 | 707 Stockton St | Chung's Constr & Painting Co. | #208 & #308 inside walls & ceiling sheetrock & painting, 3rd hallway 4'x8' sheetrock. repair fire damage. no structural workDetails
#208 & #308 inside walls & ceiling sheetrock & painting, 3rd hallway 4'x8' sheetrock. repair fire damage. no structural work | $20,000 |
| Feb 5, 2007 | Completed final sign-off Mar 2007 | 707 Stockton St | Sun Light & Power | solar electric system panels on roof, inverter and disconnect in electrical room on g/f. structural calcs. included for ref. no structral work under this permit.Details
solar electric system panels on roof, inverter and disconnect in electrical room on g/f. structural calcs. included for ref. no structral work under this permit. | $19,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.