Block 0219, lot 020
1455 Clay St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 3
- Units
- 13
- Rooms
- 12 bathrooms
- Building
- 9,231 sq ft
- Lot
- 7,239 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 1455 Clay St | J P F Construction | apt 7: remodel ktichen (replacing appliances, counters) & bathroom, all work in-kind. no layout changes or structural work.Details
apt 7: remodel ktichen (replacing appliances, counters) & bathroom, all work in-kind. no layout changes or structural work. | $48,000 |
| Jun 3, 2026 | In progress issued Jul 2026 | 1455 Clay St | J P F Construction | unit 3: bathroom and kitchen build-back due to water damaged walls. hang new 5/8in type-x drywall (fire rated). full paint unit and refinishe the (e) floor). replacement of receptacles throughout. to comply nov 202655991Details
unit 3: bathroom and kitchen build-back due to water damaged walls. hang new 5/8in type-x drywall (fire rated). full paint unit and refinishe the (e) floor). replacement of receptacles throughout. to comply nov 202655991 | $70,000 |
| Oct 23, 2024 | Completed final sign-off Sep 2025 | 1455 Clay St | Cesar Garcia General Contractor Inc | unit 1: bathroom and kitchen remodel. replace 2 windows at the kitchen and living room. rewire unit upgradeDetails
unit 1: bathroom and kitchen remodel. replace 2 windows at the kitchen and living room. rewire unit upgrade | $40,000 |
| Oct 23, 2024 | Completed final sign-off Mar 2025 | 1455 Clay St | Cesar Garcia General Contractor Inc | unit5: bathroom remodel. rewire apt, install subpanel, install outlet throught includinn recess lights. install kitchen window and living room window (total 2 windows not street facing)Details
unit5: bathroom remodel. rewire apt, install subpanel, install outlet throught includinn recess lights. install kitchen window and living room window (total 2 windows not street facing) | $35,000 |
| Mar 7, 2024 | Completed final sign-off Oct 2024 | 1455 Clay St | Cesar Garcia General Contractor Inc | unit 6: bathroom and kithen remodel. rewire entire unit. install subpanel 125amp. replace 1 kitchen window and dining window to vinyl white. window facing neighbor which is existing,Details
unit 6: bathroom and kithen remodel. rewire entire unit. install subpanel 125amp. replace 1 kitchen window and dining window to vinyl white. window facing neighbor which is existing, | $28,000 |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 1455 Clay St | Cesar Garcia General Contractor Inc | unit #11: bathroom remodel - removal of claw bathtub, install shower kit with fiberglass pan. rewire service 60a. install subpanel 125a. rewire electrical throughout the unit. install all recess lighting.Details
unit #11: bathroom remodel - removal of claw bathtub, install shower kit with fiberglass pan. rewire service 60a. install subpanel 125a. rewire electrical throughout the unit. install all recess lighting. | $25,000 |
| Sep 12, 2023 | Completed final sign-off Jan 2024 | 1455 Clay St | Cesar Garcia General Contractor Inc | unit# 4: bathroom remodel - removal of claw bathtub, install shower at kit with fiber glass pan. kitchen remodel, rewire service with new panel. 60' amp install recess lighting throughout. rewire all outlets.Details
unit# 4: bathroom remodel - removal of claw bathtub, install shower at kit with fiber glass pan. kitchen remodel, rewire service with new panel. 60' amp install recess lighting throughout. rewire all outlets. | $25,000 |
| Sep 1, 2021 | Completed final sign-off Dec 2022 | 1455 Clay St | Cesar Garcia General Contractor Inc | apt 8: one remodel bathroom: removal of claw tub, install shower kit with fiberglass shower pan. one remodel kitchen: rewire entire unit, new subpanel, install 4in recessed lights throughout. h.e. lightingDetails
apt 8: one remodel bathroom: removal of claw tub, install shower kit with fiberglass shower pan. one remodel kitchen: rewire entire unit, new subpanel, install 4in recessed lights throughout. h.e. lighting | $25,000 |
| Jul 30, 2020 | Never finaled issued Aug 2020, no final | 1455 Clay St | Cesar Garcia General Contractor Inc | apt 12: bathroom remodel: removal of claw tub & replace with shower stall & fiberglass shower pan. install recessed lighting 4in. install shower manifold & new vanity. kitchen remodel: install 4in recessed led lights, new subpanel for unit, rewire entire unit.maher not reqDetails
apt 12: bathroom remodel: removal of claw tub & replace with shower stall & fiberglass shower pan. install recessed lighting 4in. install shower manifold & new vanity. kitchen remodel: install 4in recessed led lights, new subpanel for unit, rewire entire unit.maher not req | $25,000 |
| Feb 11, 2020 | Completed final sign-off May 2020 | 1455 Clay St | Gil Construction & Assoc Inc. | to comply with nov201759552, complaint 201619931 at rear grage - remove and replce damagned siding and loose brick in-kind. not visible from street.Details
to comply with nov201759552, complaint 201619931 at rear grage - remove and replce damagned siding and loose brick in-kind. not visible from street. | $10,000 |
| Feb 11, 2020 | Completed final sign-off May 2020 | 1455 Clay St | Gil Construction & Assoc Inc. | damage through out small garage: dry rot repair, repair and replace damange roof shetting. repair dry-rot, replace with new sheeting and roof in-kind about 440sf. install 3/4in cds plywood with min 10d common nails at 6in on o/c on edge and 12in on others.Details
damage through out small garage: dry rot repair, repair and replace damange roof shetting. repair dry-rot, replace with new sheeting and roof in-kind about 440sf. install 3/4in cds plywood with min 10d common nails at 6in on o/c on edge and 12in on others. | $23,000 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 1455 Clay St | street spaceDetails
street space | ||
| Dec 4, 2019 | Completed final sign-off May 2020 | 1455 Clay St | Gil Construction & Assoc Inc. | install new middle support beam & footing at rear garage. replace dry-rotted framing below garages as needed. replace existing garage floor concrete. topping w/ new lightweight concreteDetails
install new middle support beam & footing at rear garage. replace dry-rotted framing below garages as needed. replace existing garage floor concrete. topping w/ new lightweight concrete | $60,000 |
| Oct 3, 2019 | Never finaled issued Oct 2019, no final | 1455 Clay St | Gil Construction & Assoc Inc. | street spaceDetails
street space | |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 1455 Clay St | Ace Roofing East Bay | re-roofingDetails
re-roofing | $24,000 |
| Jun 7, 2019 | Completed final sign-off May 2020 | 1455 Clay St | Gil Construction & Assoc Inc. | refurbish and repair rear deck. no change in configuration. to comply with complaint 201619931. renew bld permit 201610059593 maher na item #5 - stairs under pa# 201607142422Details
refurbish and repair rear deck. no change in configuration. to comply with complaint 201619931. renew bld permit 201610059593 maher na item #5 - stairs under pa# 201607142422 | $30,000 |
| May 1, 2019 | Completed final sign-off May 2019 | 1455 Clay St | Gil Construction & Assoc Inc. | remove and replace all damaged posts on 2 set of stairs. one on the east side and one on the west not visible from street. under 50% repairs.Details
remove and replace all damaged posts on 2 set of stairs. one on the east side and one on the west not visible from street. under 50% repairs. | $15,000 |
| Mar 17, 2017 | Completed final sign-off Nov 2017 | 1455 Clay St | Nabi Construction & Engineering Inc | seismic upgrade for soft story as per sfbc chapter 4d 2012 iebc appx a4Details
seismic upgrade for soft story as per sfbc chapter 4d 2012 iebc appx a4 | $165,000 |
| Oct 5, 2016 | Expired or cancelled withdrawn Jun 2019 | 1455 Clay St | comply w/nov #201619931 item #5, #9, #11 & comply w/nov 201625931 - refurbish rear exterior stairs & balcony @ rear. (no change in configuration). n/a maher ordinanceDetails
comply w/nov #201619931 item #5, #9, #11 & comply w/nov 201625931 - refurbish rear exterior stairs & balcony @ rear. (no change in configuration). n/a maher ordinance | $30,000 | |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 1455 Clay St | repair stairs violation #201619931Details
repair stairs violation #201619931 | $2,000 | |
| Nov 12, 2015 | Expired or cancelled cancelled Jan 2026 | 1455 Clay St | seismic retrofit of soft story comply with sfbc 34b mandatory seismic retrofit 2012 iebc appendix a-4. n/a for maherDetails
seismic retrofit of soft story comply with sfbc 34b mandatory seismic retrofit 2012 iebc appendix a-4. n/a for maher | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cesar Garcia General Contractor Inc (7), Gil Construction & Assoc Inc. (6), J P F Construction (2), Ace Roofing East Bay, Nabi Construction & Engineering Inc
- Engineers
- Rodrigo Santos (2), Darren Wong, Donald David, Javed J. Tharavi
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.